{"status":"OK","data":{"advertisement":{"id":377619,"title":"Przedmiotem zam\u00f3wienia jest wykonanie w systemie \u201ezaprojektuj i wybuduj\u201d komory do oksydacji drut\u00f3w aluminiowych w atmosferze nasyconej pary wodnej wraz z niezb\u0119dnym wyposa\u017ceniem i oprogramowaniem.\n\nEnglish Version\nThe subject of the contract is the construction, under a \u2018design and build\u2019 contract, of a chamber for the oxidation of aluminum wires in an atmosphere saturated with water vapour together with the necessary equipment and software)","partial_offer_allowed":false,"publication_date":"2026-07-17","submission_deadline":"2026-08-14 23:59:59","planned_sign_date":"2026-09-01","supplementary_orders":"-","terms_of_contract_change":"1.Zamawiaj\u0105cy zastrzega sobie mo\u017cliwo\u015b\u0107 dokonania zmian w umowie z Wykonawc\u0105\nw stosunku do tre\u015bci z\u0142o\u017conej przez niego oferty:\n\u2022gdy zaistnieje okoliczno\u015b\u0107 prawna,\nekonomiczna lub techniczna niemo\u017cliwa do przewidzenia w dniu podpisania umowy/ umowy warunkowej, skutkuj\u0105ca brakiem mo\u017cliwo\u015bci nale\u017cytej realizacji umowy,\n\u2022z powodu dzia\u0142ania si\u0142y wy\u017cszej,\n\u2022z powodu zmiany jakichkolwiek rozporz\u0105dze\u0144 i przepis\u00f3w i innych dokument\u00f3w, w tym dokument\u00f3w programowych \u201eFUNDUSZE EUROPEJSKIE DLA NOWOCZESNEJ GOSPODARKI 2021\u2013\n2027 (FENG) \u201d oraz \u201eWytyczne dotycz\u0105ce\nkwalifikowalno\u015bci wydatk\u00f3w na lata 2021-2027\u201d, z innych przyczyn zewn\u0119trznych\nniezale\u017cnych od Zamawiaj\u0105cego oraz Wykonawcy skutkuj\u0105cych niemo\u017cliwo\u015bci\u0105 realizacji zam\u00f3wienia,\n\u2022zmiany ceny (zmiany urz\u0119dowej stawki podatku VAT). W przypadku wzrostu kursu waluty, w kt\u00f3rej udzielone zosta\u0142o zam\u00f3wienie w stosunku do kursu z dnia poprzedzaj\u0105cego dzie\u0144\npodpisania umowy o min 5%, Zamawiaj\u0105cy zastrzega sobie mo\u017cliwo\u015b\u0107 renegocjacji ceny,\n\u2022z powodu zmian w zakresie lub sposobie wykonania zam\u00f3wienia za zgod\u0105 Stron,\n\u2022z powodu zmiany terminu realizacji zam\u00f3wienia na \u017cyczenie Zamawiaj\u0105cego\nw przypadku, gdy odbi\u00f3r przedmiotu dostawy b\u0119dzie uzale\u017cniony od obecno\u015bci innych, niezb\u0119dnych, wsp\u00f3\u0142pracuj\u0105cych urz\u0105dze\u0144 oraz infrastruktury, tj. w sytuacji, gdy odbi\u00f3r\ni weryfikacja poprawno\u015bci funkcjonowania urz\u0105dzenia dostarczanego w ramach zam\u00f3wienia, b\u0119dzie uzale\u017cniona od obecno\u015bci pozosta\u0142ych urz\u0105dze\u0144 nabywanych w ramach projektu,\n\u2022z powodu przestoj\u00f3w i op\u00f3\u017anie\u0144 zawinionych przez Zamawiaj\u0105cego, maj\u0105cych bezpo\u015bredni wp\u0142yw na terminowo\u015b\u0107 wykonania przedmiotu zam\u00f3wienia -\nmaksymalnie o okres przestoj\u00f3w i op\u00f3\u017anie\u0144.\n2.Wszelkie zmiany i uzupe\u0142nienia do umowy zawartej z wybranym Wykonawc\u0105 musz\u0105 by\u0107 dokonywane w formie pisemnych aneks\u00f3w do umowy, podpisanych przez obie strony, pod rygorem niewa\u017cno\u015bci.\n\nEnglish Version:\n1.The Ordering Party reserves the right to make changes to the contract with the Contractor in relation to the content of the offer submitted by the Contractor:\n\u2022when there are legal, economic or technical circumstances that was impossible to foresee on the date of signing the contract/conditional contract, resulting in the inability to properly perform the contract,\n\u2022due to force majeure,\n\u2022due to changes in any regulations, provisions and other documents, including programme documents \"EUROPEAN FUNDS FOR A MODERN ECONOMY 2021\u20132027 (FENG)\" and \"Guidelines on\nthe eligibility of expenditure for the years 2021-2027\", for other external reasons\nbeyond the control of the Ordering Party and the Contractor, resulting in the impossibility of performing the contract,\n\u2022a change in price (a change in the official VAT rate). In the event of an increase in the exchange rate of the currency in which the contract was awarded in relation to the exchange rate on the day preceding the day of\nsigning the contract by at least 5%, the Ordering Party reserves the right to renegotiate the price,\n\u2022due to changes in the scope or manner of performance of the order with the consent of the Parties,\n\u2022due to a change in the order completion date at the request of the Ordering Party, if the acceptance of the delivery depends on the presence of other necessary, cooperating devices and infrastructure, i.e. in a situation where the acceptance and verification of the correct functioning of the device delivered under the order will depend on the presence of other devices purchased under the project,\n\u2022due to downtime and delays caused by the Ordering Party, having a direct impact on the timeliness of the order's execution by a maximum of the period of downtime and delays.\n2. Any amendments and supplements to the contract concluded with the selected Contractor must be made in the form of written annexes to the contract, signed by both parties, under pain of nullity","created_at":"2026-07-17 16:04:10","modified_at":"2026-08-15 00:00:05","contact_persons":[{"id":98578,"forename":"Jakub","surname":"Siemi\u0144ski","phone_number":"+48 12 652 54 37","email":"jakub.siemi\u0144ski@tfkable.com","created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null}],"orders":[{"id":610390,"estimated_value":null,"order_items":[{"id":686233,"description":"Przedmiotem zam\u00f3wienia jest wykonanie w systemie \u201ezaprojektuj i wybuduj\u201d komory do oksydacji drut\u00f3w aluminiowych w atmosferze nasyconej pary wodnej wraz z niezb\u0119dnym wyposa\u017ceniem i oprogramowaniem\nNa przedmiot zam\u00f3wienia sk\u0142ada si\u0119 w szczeg\u00f3lno\u015bci, lecz nie wy\u0142\u0105cznie: od zaprojektowania, przez dostaw\u0119 komory zgodnie z funkcjonalno\u015bci\u0105 z formularza wraz z niezb\u0119dnym do korzystania wyposa\u017ceniem i oprogramowaniem, przez roboty budowlane (fundament), monta\u017c, wraz ze wszystkimi materia\u0142ami niezb\u0119dnymi do w\u0142a\u015bciwego monta\u017cu, koszty zwi\u0105zane z nadzorem monta\u017cu (je\u015bli dotyczy), koszty ubezpieczenia URUCHOMIENIE (wraz z odpowiednimi narz\u0119dziami), w tym wszelkie koszty zwi\u0105zane z obecno\u015bci\u0105 przedstawicieli Dostawcy, jak r\u00f3wnie\u017c koszty przygotowania wymaganej dokumentacji, szkolenie, a\u017c po opracowanie dokumentacji powykonawczej we wszystkich wymaganych bran\u017cach, dostarczenie \u015bwiadectw jako\u015bci, certyfikat\u00f3w oraz deklaracji zgodno\u015bci dla wykonanej instalacji, pozwole\u0144 na budow\u0119 je\u017celi b\u0119dzie wymagane oraz przygotowanie niezb\u0119dnej dokumentacji w celu uzyskania przez Zamawiaj\u0105cego decyzji zezwalaj\u0105cej na eksploatacj\u0119 urz\u0105dzenia ci\u015bnieniowego wydanej przez organ w\u0142a\u015bciwej jednostki dozoru technicznego.\nPrzedmiot zam\u00f3wienia obejmuje r\u00f3wnie\u017c Opracowanie koncepcji technicznej komory do oksydacji drut\u00f3w aluminiowych, uzgodnienie jej z Zamawiaj\u0105cym oraz uzyskanie akceptacji. Opracowanie i uzgodnienie dokumentacji technicznej i wykonawczej we wszystkich wymaganych bran\u017cach, a w tym: mechaniczna, konstrukcyjna, elektryczna, zasilania, AKPiA, opracowanie dokumentacji monta\u017cowej dla wykonania zaplanowanego i uzgodnionego zakresu prac.\nWykonanie dokumentacji technicznej, kt\u00f3ra musi zawiera\u0107:\nLay out zawieraj\u0105cy rozmieszczenie element\u00f3w 2D i 3D\nSchemat ideowy elektryczny jednokreskowy\nProjekt fundament\u00f3w\nProjekt doprowadzenie medi\u00f3w do instalacji\nInstrukcja obs\u0142ugi zgodna z dyrektyw\u0105 maszynow\u0105 2023/1230/WE\nKomplet dokumentacji pod UDT\nDeklaracj\u0119 zgodno\u015bci\nProjekt powykonawczy instalacji i fundament\u00f3w, Kompletacja wszystkich materia\u0142\u00f3w i urz\u0105dze\u0144 niezb\u0119dnych do wykonania pe\u0142nego zakresu prac we wszystkich bran\u017cach i obiektach, w oparciu o zatwierdzon\u0105 dokumentacj\u0119 techniczn\u0105 i dokumentacj\u0119 monta\u017cow\u0105.\nWszystkie nowe urz\u0105dzenia zastosowane przez Wykonawc\u0119 musz\u0105 posiada\u0107 deklaracje zgodno\u015bci CE, atesty, karty katalogowe, instrukcje obs\u0142ugi a ca\u0142a w/w dokumentacja musi by\u0107 dostarczona w j\u0119zyku polskim.\n\nEnglish Version:\nThe subject of the contract is the construction, under a \u2018design and build\u2019 contract, of a chamber for the oxidation of aluminum wires in an atmosphere saturated with water vapour together with the necessary equipment and software).\nThe scope of the contract includes, in particular but not limited to: design, delivery of the chamber in accordance with the specifications set out in the form, together with the equipment and software necessary for its use, construction works (foundation), installation, together with all materials necessary for proper installation, costs associated with installation supervision (if applicable), insurance costs, COMMISSIONING (including the relevant tools), including all costs associated with the presence of the Supplier\u2019s representatives, as well as the costs of preparing the required documentation, training, right through to the preparation of as-built documentation in all required disciplines, the provision of quality certificates, certificates and declarations of conformity for the completed installation, building permit if it\u2019s required and the preparation of the necessary documentation to enable the Client to obtain a decision authorising the operation of the pressure equipment issued by the competent technical inspection authority.\nThe scope of the contract also includes the development of a technical concept for an aluminium wire oxidation chamber, its consultation with the Client and obtaining approval, Development and coordination of technical and working drawings across all required disciplines, including: mechanical, structural, electrical, power supply, and instrumentation and control systems; preparation of installation documentation for the execution of the planned and agreed scope of work.\nPreparation of technical documentation, which must include:\nLayout showing the arrangement of 2D and 3D components\nSingle-line electrical schematic\nFoundation design\nDesign for the supply of utilities to the installation\nOperating instructions in accordance with the Machinery Directive 2023/1230/EC\nComplete documentation for the Technical Inspection Authority (UDT)\nDeclaration of conformity\nAs-built drawings of the installation and foundations; Provision of all materials and equipment necessary to carry out the full scope of works across all trades and facilities, based on the approved technical documentation and installation documentation.\nAll new equipment used by the Contractor must have CE declarations of conformity, certificates, data sheets and operating manuals, and all the above-mentioned documentation must be provided in Polish.\n","warranty_period":"Minimalny okres gwarancji to 24 m-ce od momentu uruchomienia przedmiotu zam\u00f3wienia. The minimum guarantee period is 24 months from the date of commissioning.","cpv_items":[{"id":2969,"code":"33191110-9","name":"Autoklawy"},{"id":5128,"code":"42000000-6","name":"Maszyny przemys\u0142owe"},{"id":5523,"code":"42900000-5","name":"R\u00f3\u017cne maszyny og\u00f3lnego i specjalnego przeznaczenia"},{"id":6346,"code":"45000000-7","name":"Roboty budowlane"}],"timetable_items":[],"fulfillment_places":[{"country":"Polska","voivodeship":"kujawsko-pomorskie","poviat":"Bydgoszcz","commune":"Bydgoszcz","locality":"Bydgoszcz","created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:06:06","modified_by":null,"id":781689,"type":{"id":1,"name":"adres"},"group_uuid":"8f4b0328-5f9e-434d-95fe-9f6a657c5d09"}],"participation_conditions":[{"id":1963617,"description":"1.Ka\u017cdy Oferent mo\u017ce z\u0142o\u017cy\u0107 tylko jedn\u0105 ofert\u0119.\nOcena spe\u0142nienia warunku udzia\u0142u wskazanych w pkt.1-3 b\u0119dzie dokonana na zasadzie spe\u0142nia/nie spe\u0142nia na podstawie formularze Oferty - za\u0142\u0105cznik nr 1 do zapytania.\n2.Oferty, kt\u00f3re nie spe\u0142niaj\u0105 okre\u015blonych funkcji i parametr\u00f3w technicznych ustalonych\ndla przedmiotu zam\u00f3wienia oraz oferty na urz\u0105dzenia, kt\u00f3re nie spe\u0142niaj\u0105 wymaga\u0144 wszystkich akt\u00f3w normatywnych\numo\u017cliwiaj\u0105cych ich u\u017cytkowanie w Polsce (wymienionych w pkt I), zostan\u0105 odrzucone.\n3.W celu zagwarantowania prawid\u0142owego wykonania przedmiotu zam\u00f3wienia przez Wykonawc\u0119, Zamawiaj\u0105cy odrzuci oferty spe\u0142niaj\u0105ce co najmniej jeden z poni\u017cszych warunk\u00f3w:\na)Oferty z okresem gwarancji kr\u00f3tszym ni\u017c 24 miesi\u0105ce od daty oddania do u\u017cytku zostan\u0105 odrzucone\nb) Oferty z deklarowanym okresem realizacji (wykonanie w systemie zaprojektuj i wybuduj komory do oksydacji drut\u00f3w aluminiowych w atmosferze nasyconej pary wodnej) d\u0142u\u017cszym ni\u017c 10 miesi\u0119cy zostan\u0105 odrzucone.\nc) Oferty z okresem wa\u017cno\u015bci kr\u00f3tszym ni\u017c 90 dni zostan\u0105 odrzucone.\nOcena spe\u0142nienia warunku udzia\u0142u w post\u0119powaniu b\u0119dzie dokonana na zasadzie spe\u0142nia/nie spe\u0142nia na podstawie formularze Oferty - za\u0142\u0105cznik nr 1 do zapytania.\n4. O udzielenie zam\u00f3wienia mog\u0105 ubiega\u0107 si\u0119 Oferenci, kt\u00f3rzy spe\u0142niaj\u0105 nast\u0119puj\u0105ce warunki:\na) kt\u00f3rzy wywi\u0105zali si\u0119 ze swoich zobowi\u0105za\u0144 dotycz\u0105cych p\u0142atno\u015bci podatk\u00f3w, op\u0142at lub sk\u0142adek na ubezpieczenie spo\u0142eczne lub zdrowotne. Ocena spe\u0142niania warunku udzia\u0142u w post\u0119powaniu b\u0119dzie dokonana na zasadzie spe\u0142nia/nie spe\u0142nia na podstawie Za\u0142\u0105cznika nr 3 do zapytania ofertowego.\nb) nie podlegaj\u0105 post\u0119powaniu egzekucyjnemu, administracyjnemu lub skarbowemu, ocena spe\u0142niania warunku udzia\u0142u w post\u0119powaniu b\u0119dzie dokonana na zasadzie spe\u0142nia/nie spe\u0142nia na podstawie Za\u0142\u0105cznika nr 3 do zapytania ofertowego.\nc)Nie s\u0105 powi\u0105zani z Zamawiaj\u0105cym osobowo lub kapita\u0142owo, Przez powi\u0105zania kapita\u0142owe lub osobowe rozumie si\u0119 wzajemne powi\u0105zania mi\u0119dzy Zamawiaj\u0105cym a Wykonawc\u0105 polegaj\u0105ce na:\n\u2022uczestniczeniu w sp\u00f3\u0142ce jako wsp\u00f3lnik sp\u00f3\u0142ki cywilnej lub sp\u00f3\u0142ki osobowej, posiadaniu co najmniej 10% udzia\u0142\u00f3w lub akcji (o ile ni\u017cszy pr\u00f3g nie wynika z przepis\u00f3w prawa), pe\u0142nieniu funkcji cz\u0142onka organu nadzorczego lub zarz\u0105dzaj\u0105cego, prokurenta, pe\u0142nomocnika,\n\u2022pozostawaniu w zwi\u0105zku ma\u0142\u017ce\u0144skim, w stosunku pokrewie\u0144stwa lub powinowactwa w linii prostej, pokrewie\u0144stwa lub powinowactwa\nw linii bocznej do drugiego stopnia lub zwi\u0105zaniu z tytu\u0142u przysposobienia, opieki lub kurateli albo pozostawaniu we wsp\u00f3lnym po\u017cyciu z wykonawc\u0105, jego zast\u0119pc\u0105 prawnym lub cz\u0142onkami organ\u00f3w zarz\u0105dzaj\u0105cych lub organ\u00f3w nadzorczych wykonawc\u00f3w ubiegaj\u0105cych si\u0119 o udzielenie zam\u00f3wienia,\n\u2022 pozostawaniu z wykonawc\u0105 w takim stosunku prawnym lub faktycznym, \u017ce istnieje uzasadniona w\u0105tpliwo\u015b\u0107 co do ich bezstronno\u015bci lub niezale\u017cno\u015bci w zwi\u0105zku z post\u0119powaniem o udzielenie zam\u00f3wienia.\nOcena spe\u0142niania warunku udzia\u0142u w post\u0119powaniu b\u0119dzie dokonana na zasadzie spe\u0142nia/nie spe\u0142nia na podstawie Za\u0142. nr 3 do zapytania ofertowego.\nEnglish version\n1.Each Bidder may submit only one bid.\nThe assessment of meeting the participation conditions listed in points 1-3 will be made on a meet/does not meet basis based on the Offer form - Annex no. 1 to the inquiry.\n2.Offers that do not meet the defined functions and technical parameters set for individual parts\nsubject of the contract, and bids for devices that do not meet the requirements of all normative acts allowing their use in Poland (listed in point I) shall be rejected.\n3.In order to guarantee the proper performance of the subject of the contract by the Contractor, the Ordering Party shall reject bids that meet at least one of the following conditions:\na)Offers with a guarantee period shorter than 24 months from the date of commissioning shall be rejected.\nb)Offers with a declared contract performance period under a design-and-build contract, the chambers for the oxidation of aluminum wires in a saturated water vapour atmosphere and to commission them longer than 10 months will be rejected)\nc)Offers with a validity period of less than 90 days will be rejected. \n4.Tenders may be submitted by Tenderers who: meet the following conditions. are not subject to exclusion from the procedure.\na)who have fulfilled their obligations relating to the payment of taxes, fees or social security or health insurance contributions. Confirmation of compliance with this condition shall be provided by the Contractor's signature on the declaration in Appendix 3 (verification on a pass/fail basis).\nb)are not subject to enforcement, administrative or fiscal proceedings, confirmation of compliance with this condition shall be provided by the Contractor's signature on the declaration constituting Appendix 3 (verification on a meet/do not meet basis).\nc)who are not related to the Ordering Party\npersonally, or financially. Financial or personal connections are understood to mean mutual links between the Ordering Party and the Contractor consisting of\n\u2022participation in a company as a partner in a civil law partnership or a partnership,\nholding at least 10% of shares or stocks (unless a lower threshold results from\nthe provisions of law), performing the function of a member of a supervisory body or\nmanagement body, proxy, representative,\u2022\nbeing married, related by blood or affinity in a direct line, kinship or affinity in a collateral line up to the second degree, or related by adoption, guardianship or custody or cohabiting with the contractor, his legal representative or members of the management or supervisory bodies of contractors applying for the contract,\u2022\nbeing in such a legal or factual relationship with the contractor that there is reasonable doubt as to their impartiality or independence in connection with the procurement procedure.\nConfirmation of compliance with this condition shall be provided by the Contractor's signature on the statement in Appendix 3 (verification on a comply/do not comply basis).","type":{"id":7,"name":"Dodatkowe warunki udzia\u0142u"},"created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"2e33c798-9c7f-49d0-bf50-739515fa9b09"},{"id":1963618,"description":"1. Zamawiaj\u0105cy, dzia\u0142aj\u0105c zgodnie z Wytycznymi dotycz\u0105cymi kwalifikowalno\u015bci wydatk\u00f3w na lata 2021\u20132027, zastrzega sobie prawo do weryfikacji zdolno\u015bci technicznej, technologicznej oraz organizacyjnej Oferenta do wykonania przedmiotu zam\u00f3wienia\n1.1 Weryfikacja, o kt\u00f3rej mowa w ust. 1, mo\u017ce obejmowa\u0107 w szczeg\u00f3lno\u015bci przeprowadzenie audytu miejsca produkcji, zaplecza technicznego lub innych obiekt\u00f3w wykorzystywanych lub przewidzianych do realizacji zam\u00f3wienia, w zakresie adekwatnym i proporcjonalnym do przedmiotu zam\u00f3wienia.\n1.2 Audyt mo\u017ce zosta\u0107 przeprowadzony na etapie oceny ofert lub przed zawarciem umowy, po uprzednim poinformowaniu Oferenta\no planowanym terminie oraz zakresie audytu, z zachowaniem zasad r\u00f3wnego traktowania\ni przejrzysto\u015bci.\n1.3. Odmowa umo\u017cliwienia przeprowadzenia audytu lub brak wsp\u00f3\u0142pracy ze strony Oferenta w zakresie niezb\u0119dnym do dokonania weryfikacji mo\u017ce zosta\u0107 uznana za niewykazanie spe\u0142nienia warunku posiadania odpowiednich zdolno\u015bci technicznych do realizacji przedmiotu zam\u00f3wienia.\n1.4. Je\u017celi w wyniku audytu lub na podstawie przedstawionych dokument\u00f3w, wyja\u015bnie\u0144 b\u0105d\u017a innych obiektywnie uzasadnionych informacji powstan\u0105 w\u0105tpliwo\u015bci co do mo\u017cliwo\u015bci nale\u017cytego wykonania przedmiotu zam\u00f3wienia przez Oferenta, Zamawiaj\u0105cy jest uprawniony do odrzucenia oferty, przy czym decyzja ta musi by\u0107 oparta na przes\u0142ankach obiektywnych, mo\u017cliwych do udokumentowania oraz jednakowych dla wszystkich Oferent\u00f3w.\n1.5. Czynno\u015bci, o kt\u00f3rych mowa w niniejszym paragrafie, nie mog\u0105 prowadzi\u0107 do naruszenia zasady uczciwej konkurencji ani do nieuzasadnionego ograniczenia dost\u0119pu do zam\u00f3wienia.\n1.6 Ocena spe\u0142niania warunku udzia\u0142u w post\u0119powaniu b\u0119dzie dokonana na zasadzie spe\u0142nia/nie spe\u0142nia na podstawie Za\u0142\u0105cznika nr 4 do zapytania ofertowego\n\nEnglish version:\n1. The Contracting Authority, acting in accordance with the Guidelines on the eligibility of expenditure for the years 2021\u20132027, reserves the right to verify the Bidder's technical, technological, and organizational capacity to perform the subject of the contract.\n1.1 The verification referred to in paragraph 1 may include, in particular, an audit of the production site, technical facilities, or other facilities used or intended for the performance of the contract, to the extent adequate and proportionate to the subject matter of the contract.\n1.2 The audit may be carried out at the stage of bid evaluation or prior to the conclusion of the contract, after informing the Bidder of the planned date and scope of the audit, in accordance with the principles of equal treatment and transparency.\n1.3. Refusal to allow an audit to be carried out or lack of cooperation on the part of the Bidder to the extent necessary to perform the verification may be considered as failure to demonstrate that the Bidder has the appropriate technical capacity to perform the contract.\n1.4. If, as a result of the audit or on the basis of the documents, explanations or other objectively justified information provided, doubts arise as to the Bidder's ability to properly perform the contract, the Contracting Authority shall be entitled to reject the bid, provided that this decision is based on objective, documentable grounds that are the same for all Bidders.\n1.5. The activities referred to in this paragraph shall not lead to a breach of the principle of fair competition or to an unjustified restriction of access to the contract.\n1.6 Compliance with the eligibility criteria for participation in the procedure will be assessed on a pass/fail basis, in accordance with Annex 4 to the request for proposals.","type":{"id":3,"name":"Potencja\u0142 techniczny"},"created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"c07dbe20-248a-4ec1-8f4a-a1df9326768c"},{"id":1963619,"description":"1.O udzielenie zam\u00f3wienia mog\u0105 ubiega\u0107 si\u0119 Oferenci, kt\u00f3rzy spe\u0142niaj\u0105 nast\u0119puj\u0105cy warunek:\nW okresie ostatnich pi\u0119ciu lat przed up\u0142ywem terminu sk\u0142adania ofert, a je\u017celi okres prowadzenia dzia\u0142alno\u015bci jest kr\u00f3tszy \u2013 w tym okresie zrealizowali w spos\u00f3b nale\u017cyty co najmniej trzy zbli\u017cone w swoim zakresie realizacje.\nOcena spe\u0142niania warunku udzia\u0142u w post\u0119powaniu b\u0119dzie dokonana na zasadzie spe\u0142nia/nie spe\u0142nia na podstawie Za\u0142\u0105cznika nr 4 do zapytania ofertowego.\nEnglish Version\nTenders may be submitted by Tenderers who: meet the following conditions:\nDuring the last five years prior to the deadline for submission of tenders, or during the entire period of their activity if it is shorter, they have duly completed at least three projects similar in scope.\nVerification of compliance with the condition based on the information in Appendix 4\n(verification on a pass/fail basis).","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"73062f6b-0ec6-4992-a086-3610f0e465a9"},{"id":1963620,"description":"1.O udzielenie zam\u00f3wienia mog\u0105 ubiega\u0107 si\u0119 Oferenci, kt\u00f3rzy spe\u0142niaj\u0105 nast\u0119puj\u0105cy warunek:\nPozostaj\u0105 w sytuacji ekonomicznej daj\u0105cej r\u0119kojmi\u0119 nale\u017cytego wykonania zam\u00f3wienia.\nOcena spe\u0142nienia warunku zostanie przeprowadzona przez Zamawiaj\u0105cego w oparciu o nast\u0119puj\u0105ce wska\u017aniki ekonomiczne za ostatni rok obrotowy: Przychody za ostatni rok obrotowy powinny przyjmowa\u0107 warto\u015b\u0107 nie mniejsz\u0105 ni\u017c dwukrotno\u015b\u0107 warto\u015bci z\u0142o\u017conej\noferty. Podmiot musi posiada\u0107 dodatnie kapita\u0142y w\u0142asne.\n\nEnglish version:\nBidders who meet the following condition may apply for the contract:\nThey remain in an economic situation that guarantees the proper performance of the contract.\nThe assessment of whether the condition is met will be carried out by the Contracting Authority on the basis of the following for the last financial year: Revenues for the last financial year should be no less than double value of the submitted bid. The equity of tenderer must be positive.","type":{"id":5,"name":"Sytuacja ekonomiczna i finansowa"},"created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"56409593-ce15-401f-a166-d0c4f3c8bace"},{"id":1963621,"description":"1.Oferta powinna zawiera\u0107 nast\u0119puj\u0105ce za\u0142\u0105czniki:\na)Formularz oferty stanowi\u0105cy za\u0142. nr 1 do zapytania ofertowego wraz ze specyfikacj\u0105 techniczn\u0105 przedmiotu dostawy,\nb)Pe\u0142nomocnictwo do z\u0142o\u017cenia oferty, je\u015bli nie wynika to z dokument\u00f3w rejestracyjnych,\nc)Za\u0142\u0105cznik nr 2 Umowa o zachowaniu poufno\u015bci(NDA)\nd)Za\u0142\u0105cznik nr 3 o\u015bwiadczenie o braku powi\u0105za\u0144 osobowych lub kapita\u0142owych\nz Zamawiaj\u0105cym oraz spe\u0142nianiu warunk\u00f3w podmiotowych,\ne)Za\u0142\u0105cznik nr 4 o\u015bwiadczenie Oferenta potwierdzaj\u0105ce spe\u0142nienie warunk\u00f3w udzia\u0142u\nw post\u0119powaniu w zakresie wiedzy i do\u015bwiadczenia\nf)Za\u0142\u0105cznik nr 5 Wymagania dla wykonawc\u00f3w/podwykonawc\u00f3w w zakresie BHP\ni ochrony \u015brodowiska\ng)Za\u0142\u0105cznik nr 6 Wymagania dla Wykonawc\u00f3w/Podwykonawc\u00f3w w zakresie zarz\u0105dzania relacjami z pracownikami\nh)Za\u0142\u0105cznik nr 7 Pr\u00f3by odbiorcze komory do oksydacji drut\u00f3w aluminiowych w atmosferze nasyconej pary wodnej,\ni)Za\u0142\u0105cznik nr 8 Klauzula Sankcyjna Kontrahenta/Dostawcy,\nj)sprawozdania finansowego w przypadku, gdy sporz\u0105dzenie sprawozdania wymagane jest przepisami kraju, w kt\u00f3rym wykonawca ma siedzib\u0119 lub miejsce zamieszkania, a je\u017celi podlega ono badaniu przez firm\u0119 audytorsk\u0105 zgodnie z przepisami o rachunkowo\u015bci, r\u00f3wnie\u017c odpowiednio ze sprawozdaniem z badania sprawozdania finansowego, a w przypadku wykonawc\u00f3w niezobowi\u0105zanych do sporz\u0105dzenia sprawozdania finansowego, inne dokumenty okre\u015blaj\u0105ce w szczeg\u00f3lno\u015bci przychody oraz aktywa i zobowi\u0105zania \u2013 za ostatni rok obrotowy.\nk)Za\u0142\u0105cznik nr 9 Rysunek techniczny szpul DIN630\nl)Za\u0142\u0105cznik 10 Rysunek techniczny palet (stojak\u00f3w) metalowych na szpule DIN630\nm)Za\u0142\u0105cznik 11 Wz\u00f3r bankowej gwarancji zwrotu zaliczek\nn)Za\u0142\u0105cznik 12 Wz\u00f3r gwarancji usuni\u0119cia wad i usterek\no)Za\u0142\u0105cznik nr 13 Wz\u00f3r gwarancji nale\u017cytego wykonania umowy\np)Za\u0142\u0105cznik nr 14 Wz\u00f3r o\u015bwiadczenia Podwykonawc\u00f3w o realizacji Rob\u00f3t i niezaleganiu p\u0142atno\u015bci.\n2.Wykonawca, kt\u00f3rego oferta zostanie wybrana, przed zawarciem umowy zobowi\u0105zany b\u0119dzie dostarczy\u0107 nast\u0119puj\u0105ce dokumenty:\n2.1Pe\u0142nomocnictwo do zawierania um\u00f3w w imieniu wykonawcy, o ile nie wynika\nz dokument\u00f3w rejestrowych.\n2.2 Polisa ubezpieczeniowa OC w zakresie prowadzonej dzia\u0142alno\u015bci i przedmiotu zam\u00f3wienia na sum\u0119 ubezpieczeniow\u0105 nie mniejsz\u0105 ni\u017c warto\u015b\u0107 z przedstawionej oferty brutto.\nWykonawca zobowi\u0105zuje si\u0119 do zawarcia oraz utrzymania przez ca\u0142y okres obowi\u0105zywania Umowy ubezpieczenia typu Contractors All Risks (CAR).\n2.3Zamawiaj\u0105cy wymaga od oferenta, kt\u00f3rego oferta zostanie wybrana, wniesienia zabezpiecze\u0144\na)gwarancji zwrotu zaliczki w postaci gwarancji bankowych(za\u0142. 11)\nb)gwarancji usuni\u0119cia wad i usterek(za\u0142. 12)\nc)gwarancji nale\u017cytego wykonania umowy(za\u0142.13)\nOferent potwierdza na formularzu oferty, stanowi\u0105cym za\u0142. nr 1 do zapytania ofertowego, \u017ce zapozna\u0142 si\u0119 z list\u0105 dokument\u00f3w niezb\u0119dnych do podpisania umowy/realizacji umowy i zobowi\u0105zuje si\u0119 do ich dostarczenia w przypadku wyboru oferty do realizacji przed podpisaniem umowy/w trakcie realizacji umowy.\nEnglish version:\n1.The offer should be complete, i.e. it should include the following attachments:\na.The bid form constituting Appendix 1 to the request for bids, together with the technical specifications of the subject of delivery,\nb.Power of attorney to submit a bid,if this is not evident from the registration documents,\nc.Appendix No. 2 Agreement on confidentiality NDA\nd.Appendix No. 3 a statement of no personal or capital ties with the Ordering Party and of meeting the subjective conditions,\ne.Appendix No. 4 Bidder's statement confirming that the conditions for participation in the procedure in terms of knowledge and experience\nf.Appendix No.5 Requirements for\ncontractors/subcontractors in the field of occupational health and safety and environmental protection\ng.Appendix No. 6 Requirements for\nContractors/Subcontractors in the field of employee relations management\nh. Appendix No. 7 Acceptance tests for the chamber for the oxidation of aluminum wires in saturated steam atmosphere,\ni.Appendix No.8 Contractor/Supplier sanctions clause,\nj.financial statements if the preparation of such statements is required by the regulations of the country in which the contractor has its registered office or place of residence, and\nif it is subject to audit by an audit firm in accordance with accounting regulations accounting regulations, also with the audit report on the financial statements, and in the case of contractors not required to prepare\nfinancial statements, other documents specifying in particular revenues and assets and liabilities\u2013for the last financial year.\nk) Appendix No.9 Technical drawing of DIN 630 spools\nl) Appendix No.10 Technical drawing of metal pallets (racks) for DIN 630 spools\nm) Appendix No.11 Template for a bank guarantee for the refund of advance payments\nn) Appendix No.12 Template for a guarantee of rectification of defects and faults\no) Appendix No.13 Template for a performance bond\np) appendix no.14 the template of subcontarctors statement on the execution of the Works and no arrears of payments.\n2.The contractor whose bid is selected will be required to provide the following documents prior to the conclusion of the contract:\n2.1Power of attorney to conclude contracts on behalf of the contractor, unless it results from the registration documents.\n2.2 A civil liability insurance policy covering the scope of the business and the subject of the contract for an insured sum not less than the gross value of the submitted offer.\n the Contractor undertakes to take out and maintain, for the entire duration of the Contract, a Contractors\u2019 All Risks (CAR) insurance policy, with the sum insured being at least 100% of the value of the construction works.\n2.3 The Ordering Party requires the tenderer whose tender is selected to provide security:\na) advance payment guarantees (annex 11)\nb)guarantee for the removal of defects and faults (annex 12)\nc)performance bond (annex 13)\nBidder confirms on the bid form(Appendix 1) to the request for bids that they have read the list of documents necessary for signing the contract.","type":{"id":6,"name":"Lista wymaganych dokument\u00f3w/o\u015bwiadcze\u0144"},"created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"e3efc75b-9ef8-4b35-8d52-6dd0b4b609ba"}],"category":{"id":3,"name":"Dostawa"},"subcategory":{"id":15,"name":"Dostawy inne"},"created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:06:06","modified_by":null,"group_uuid":"0ffcde1b-2f31-4c01-b9d7-395b9a674d39"}],"evaluation_criteria":[{"id":1100523,"price_criterion":true,"description":"Cena zrycza\u0142towana netto za ca\u0142o\u015b\u0107 przedmiotu zam\u00f3wienia \nOpis sposobu przyznawania punkt\u00f3w:\nPc = (C min/C bad) \u00d7 80 pkt\n\nNet lump price for the entire scope of the contract\nDescription of the method of awarding Points\nPc = (C min/C bad) \u00d7 80 points","created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"b3083d84-837b-481a-aafe-5043003d7ea9"},{"id":1100524,"price_criterion":false,"description":"Gwarancja. Minimalny okres gwarancji to 24 m-ce od momentu uruchomienia. \nOpis Sposobu przyznawania punkt\u00f3w:\nPg = (Gbad/Gmax) \u00d7 10 pkt\n\nEnglish version\nGuarantee The minimum guarantee is 24 months from the date of commission\nDescription of the method of awarding\nPoints\nPg = (G bad/ Gmax) \u00d7 10 points","created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"24925acf-9ab3-4d6a-91e4-a7dfb1d18c76"},{"id":1100525,"price_criterion":false,"description":"Termin realizacji zam\u00f3wienia\nSpos\u00f3b przyznawania punktacji\nPt = (Tmin/Tbad) \u00d7 10 pkt\n\nEnglish Version:\nOrder completion date\nMethod of awarding points\nPt = (Tmin/Tbad) \u00d7 10 points","created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":null,"group_uuid":"38cfd147-976b-4275-a014-1be5416d67c5"}],"is_variant":false,"title":"wykonanie w systemie zaprojektuj i wybuduj komory do oksydcj","order_node":{"id":455773},"created_by":null,"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:06:06","modified_by":null}],"created_by":{"id":96454,"contact_persons":[]},"modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":"TELE-FONIKA KABLE S.A.","identification_number_type":"nip","identification_number":"6260004386","address":{"country":"Polska","voivodeship":"ma\u0142opolskie","poviat":"my\u015blenicki","commune":"My\u015blenice","locality":"My\u015blenice","created_by":{"id":96454,"contact_persons":[]},"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":{"id":96454,"contact_persons":[]},"id":1067862,"street":"Hipolita Cegielskiego ","number_description":"1","postcode":"32-400"},"created_by":{"id":96454,"contact_persons":[]},"created_at":"2026-07-17 16:04:10","modified_at":"2026-07-17 16:04:10","modified_by":{"id":96454,"contact_persons":[]},"id":378632},"advertisement":{"id":282515,"number":"2026-96454-282515","publication_date":"2026-06-24","created_by":{"id":96454,"contact_persons":[]},"created_at":"2026-06-23 10:17:49","modified_at":"2026-08-15 00:00:05","modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":6,"label":"RESOLVED","name":"Rozstrzygni\u0119te"},"all_available_version_ids":[373591,377619],"enrollment":null,"projects":[{"id":72612,"name":"\u201eKable elektroenergetyczne wysokich napi\u0119\u0107 (WN) na bazie \u017cy\u0142 z oksydowanych drut\u00f3w aluminiowych z ponadstandardow\u0105 moc\u0105 przesy\u0142ow\u0105 i mniejszymi stratami przesy\u0142u energii\u201d","number":"A0V6/25","activity":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:22:25","modified_at":"2023-02-01 09:22:25","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"region":null,"institution":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:27:55","modified_at":"2023-02-01 09:27:55","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"full_number":"FENG.01.01-IP.01-A0V6/25","perspective":{},"programme":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:21:41","modified_at":"2023-02-01 09:21:41","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"priority":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:21:51","modified_at":"2023-02-01 09:21:51","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"type":"project","created_by":{"id":96454,"contact_persons":[]},"created_at":"2026-06-18 11:48:00","modified_at":"2026-06-18 11:48:00","modified_by":{"id":96454,"contact_persons":[]}}],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611199,"name":"ZAPYTANIE OFERTOWE/Enquiry - 01 FENG.01.01.IP.01-A0V6_25.pdf","file":{"id":2899021,"name":"ZAPYTANIE OFERTOWE - 01 FENG.01.01.IP.01-A0V6_25.pdf","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899021"},"group_uuid":"91045784-dee3-4429-8835-bee284bfa0e4"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611200,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1.docx","file":{"id":2899022,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899022"},"group_uuid":"91f03ef5-5f6e-4793-bebc-d0f39e84baf8"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611201,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1 en.docx","file":{"id":2899023,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1 en.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899023"},"group_uuid":"a3e397fe-f32f-4590-be07-b8fdd24f574d"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611202,"name":"Za\u0142\u0105cznik nr 2 UMOWA NDA JEDNOSTRONNA_ en 01 FENG.01.01.IP.01-A0V6_25.docx","file":{"id":2899025,"name":"Za\u0142\u0105cznik nr 2 UMOWA NDA JEDNOSTRONNA_ en 01 FENG.01.01.IP.01-A0V6_25.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899025"},"group_uuid":"e7e30961-a2b6-45c4-aec8-8d1ef2848524"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611203,"name":"Za\u0142\u0105cznik nr 2 UMOWA NDA JEDNOSTRONNA_PL 01 FENG.01.01.IP.01-A0V6_25.docx","file":{"id":2899026,"name":"Za\u0142\u0105cznik nr 2 UMOWA NDA JEDNOSTRONNA_PL 01 FENG.01.01.IP.01-A0V6_25.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899026"},"group_uuid":"7cae106e-0846-4347-8bad-664f950d9e10"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611204,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 zalaczniki nr 3-8_Annexes no. 3-8.docx","file":{"id":2899027,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 zalaczniki nr 3-8_Annexes no. 3-8.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899027"},"group_uuid":"f7146632-d42a-449b-89bd-66c47ddcdfc3"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611205,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 za\u0142\u0105czniki nr 9-13_Annexes no. 9-13.docx","file":{"id":2899029,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 za\u0142\u0105czniki nr 9-13_Annexes no. 9-13.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899029"},"group_uuid":"c5bf400e-69e2-401f-b4b7-f4340f4baad2"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611206,"name":"Za\u0142\u0105cznik nr 14 - wz\u00f3r o\u015bwiadczenia podwykonawcy -01 FENG.01.01.IP.01-A0V6_25.docx","file":{"id":2899030,"name":"Za\u0142\u0105cznik nr 14 - wz\u00f3r o\u015bwiadczenia podwykonawcy -01 FENG.01.01.IP.01-A0V6_25.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899030"},"group_uuid":"e1e75ed0-f4f4-4ff6-ae07-8001f1df9844"},{"origin":{"id":373591,"publication_date":"2026-06-24"},"id":2611207,"name":"Za\u0142\u0105cznik nr 14 - wz\u00f3r o\u015bwiadczenia podwykonawcy en-01 FENG.01.01.IP.01-A0V6_25.docx","file":{"id":2899031,"name":"Za\u0142\u0105cznik nr 14 - wz\u00f3r o\u015bwiadczenia podwykonawcy en-01 FENG.01.01.IP.01-A0V6_25.docx","created_at":"2026-07-17 16:04:10","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2899031"},"group_uuid":"9b09cfb3-f119-4edb-b9a6-6b2316405e46"},{"origin":{"id":377619,"publication_date":"2026-07-17"},"id":2655628,"name":"RUU20260400030 ZAPYTANIE OFERTOWE - 01 FENG.01.01.IP.01-A0V6_25 17.07.pdf","file":{"id":2948420,"name":"RUU20260400030 ZAPYTANIE OFERTOWE - 01 FENG.01.01.IP.01-A0V6_25 17.07.pdf","created_at":"2026-07-17 16:03:58","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2948420"},"group_uuid":"86ea1cce-231e-4fcb-8b7c-a518d652c8b9"},{"origin":{"id":377619,"publication_date":"2026-07-17"},"id":2655629,"name":"Wykaz zmian wprowadzonych do zapytania ofertowego OKSy 17.07.pdf","file":{"id":2948423,"name":"Wykaz zmian wprowadzonych do zapytania ofertowego OKSy 17.07.pdf","created_at":"2026-07-17 16:04:15","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2948423"},"group_uuid":"f85aa65a-f27c-4b03-abd3-40c7dce5f2d5"},{"origin":{"id":377619,"publication_date":"2026-07-17"},"id":2655630,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1 17.07.2026.docx","file":{"id":2948424,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1 17.07.2026.docx","created_at":"2026-07-17 16:05:08","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2948424"},"group_uuid":"46f424e4-5d7f-488a-929b-487425c54b09"},{"origin":{"id":377619,"publication_date":"2026-07-17"},"id":2655631,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1 17.07.docx","file":{"id":2948426,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 Za\u0142\u0105cznik nr 1_Annex no.1 17.07.docx","created_at":"2026-07-17 16:05:16","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2948426"},"group_uuid":"58b544f6-b8b9-4e1a-96b7-946de4922c4e"},{"origin":{"id":377619,"publication_date":"2026-07-17"},"id":2655632,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 zalaczniki nr 3-8_Annexes no. 3-8 17.07.docx","file":{"id":2948429,"name":"Zapytanie ofertowe_Inquiry 01 FENG.01.01.IP.01-A0V6_25 zalaczniki nr 3-8_Annexes no. 3-8 17.07.docx","created_at":"2026-07-17 16:05:33","created_by":{"forename":"Gra\u017cyna","surname":"Popielewska"},"uri":"/api/files/2948429"},"group_uuid":"cc03f0d8-2aa0-46ed-83d3-86745a8c1c84"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}