{"status":"OK","data":{"advertisement":{"id":373195,"title":"2026-106897-282251\nus\u0142uga badawczo-rozwojowa polegaj\u0105ca na opracowaniu technologii wytwarzania substancji czynnejoligonukleotydu sk\u0142adaj\u0105cego si\u0119 z dw\u00f3ch zmodyfikowanych nici oligonukleotydowych (sensownej i antysensownej) oraz transferze ww. technologii wytwarzania substancji czynnej do wyznaczonego miejsca produkcji\n\nResearch and development service, consisting in the development of a technology for the production of the active substance of an oligonucleotide, consisting of two modified oligonucleotide strands (sense and antisense) and the transfer of the above-mentioned technology for the production of the active substance to the designated production site.","partial_offer_allowed":false,"publication_date":"2026-07-01","submission_deadline":"2026-08-03 23:59:59","planned_sign_date":"2026-08-01","supplementary_orders":"Zamawiaj\u0105cy zastrzega sobie prawo do udzielenia Wykonawcy zam\u00f3wie\u0144 dodatkowych, nie obj\u0119tych przedmiotem zam\u00f3wienia podstawowego, je\u015bli zmiany dotycz\u0105 realizacji dodatkowych dostaw, us\u0142ug lub rob\u00f3t budowlanych od dotychczasowego wykonawcy, nieobj\u0119tych zam\u00f3wieniem podstawowym, o ile sta\u0142y si\u0119 niezb\u0119dne i zosta\u0142y spe\u0142nione \u0142\u0105cznie nast\u0119puj\u0105ce warunki:\ni) zmiana wykonawcy nie mo\u017ce zosta\u0107 dokonana z powod\u00f3w ekonomicznych lub technicznych, w szczeg\u00f3lno\u015bci dotycz\u0105cych zamienno\u015bci lub interoperacyjno\u015bci sprz\u0119tu, us\u0142ug lub instalacji, zam\u00f3wionych w ramach zam\u00f3wienia podstawowego,\nii) zmiana wykonawcy spowodowa\u0142aby istotn\u0105 niedogodno\u015b\u0107 lub znaczne zwi\u0119kszenie koszt\u00f3w dla zamawiaj\u0105cego,\niii) warto\u015b\u0107 zmian nie przekracza 50% warto\u015bci zam\u00f3wienia okre\u015blonej pierwotnie w umowie, \n\n\nThe Ordering Party reserves the right to award the Contractor additional contracts, not covered by the subject matter of the basic contract, if the changes concern the performance of additional supplies, services or construction works from the existing contractor, not covered by the basic contract, if they have become necessary and the following conditions have been met together:\ni) the change of contractor cannot be made for economic or technical reasons, in particular those related to the interchangeability or interoperability of equipment, services or installations ordered under the basic contract,\nii) a change of contractor would cause a significant inconvenience or a significant increase in costs for the contracting authority,\niii) the value of the changes does not exceed 50% of the value of the contract originally specified in the contract,","terms_of_contract_change":"Zamawiaj\u0105cy zastrzega sobie mo\u017cliwo\u015b\u0107 dokonania istotnych zmian postanowie\u0144 zawartej umowy w stosunku do tre\u015bci oferty, na podstawie kt\u00f3rej dokonano wyboru Wykonawcy, w nast\u0119puj\u0105cym zakresie i sytuacjach:\n13.1.1. zmiany przepis\u00f3w prawa Unii Europejskiej lub prawa krajowego w zakresie maj\u0105cym wp\u0142yw na realizacj\u0119 Umowy (w szczeg\u00f3lno\u015bci zmiany stawek podatku VAT);\npoprawienia parametr\u00f3w technicznych przedmiotu zam\u00f3wienia, bez wp\u0142ywu na cen\u0119 rycza\u0142tow\u0105 netto,\n13.1.2.przed\u0142u\u017cenia terminu realizacji zam\u00f3wienia z uwagi na potrzeb\u0119 wykonania prac dodatkowych, kt\u00f3rych wykonanie jest niezb\u0119dne do nale\u017cytego wykonania umowy, a kt\u00f3rych wykonania Zamawiaj\u0105cy, dzia\u0142aj\u0105c z nale\u017cyt\u0105 staranno\u015bci\u0105, nie m\u00f3g\u0142 wcze\u015bniej przewidzie\u0107;\n13.1.3.przed\u0142u\u017cenia terminu realizacji zam\u00f3wienia na skutek dzia\u0142ania si\u0142y wy\u017cszej wraz ze wszystkimi konsekwencjami wyst\u0119puj\u0105cymi w zwi\u0105zku z przed\u0142u\u017ceniem tego terminu;\n13.1.4.przed\u0142u\u017cenia terminu realizacji zam\u00f3wienia z innych przyczyn niezale\u017cnych od Wykonawcy;\n13.1.5. zmiany parametr\u00f3w przedmiotu umowy, zmiana zakresu rzeczowego umowy oraz zmiana sposobu wykonania zam\u00f3wienia, nie prowadz\u0105ce do zmiany charakteru umowy \u2013 zmiany technologiczne, w szczeg\u00f3lno\u015bci: konieczno\u015b\u0107 realizacji zam\u00f3wienia przy zastosowaniu innych rozwi\u0105za\u0144 technicznych/technologicznych, materia\u0142owych ni\u017c wskazane w zapytaniu ofertowym, w sytuacji, gdy zastosowanie przewidzianych rozwi\u0105za\u0144 grozi\u0142oby niewykonaniem lub wadliwym wykonaniem umowy;\n13.1.6. w wyniku zmiany (waloryzacji) wysoko\u015bci wynagrodzenia Wykonawcy \u2013 w przypadku, gdyby Umowa zosta\u0142a przed\u0142u\u017cona na okres d\u0142u\u017cszy ni\u017c 6 miesi\u0119cy, wynagrodzenie Wykonawcy mo\u017ce ulec zmianie w przypadku zmiany ceny materia\u0142\u00f3w lub koszt\u00f3w zwi\u0105zanych z realizacj\u0105 zam\u00f3wienia powy\u017cej 10%. Spos\u00f3b ustalania zmiany wynagrodzenia: \n\u2022 zmiana wynagrodzenia b\u0119dzie obowi\u0105zywa\u0107 nie wcze\u015bniej ni\u017c od miesi\u0105ca nast\u0119pnego po miesi\u0105cu, w kt\u00f3rym nast\u0105pi\u0142a ww. zmiana ceny materia\u0142\u00f3w lub koszt\u00f3w \n\u2022 zmiana wynagrodzenia nast\u0105pi: (a) z u\u017cyciem odes\u0142ania do wska\u017anika zmiany ceny materia\u0142\u00f3w lub koszt\u00f3w, w szczeg\u00f3lno\u015bci wska\u017anika og\u0142aszanego w komunikacie Prezesa G\u0142\u00f3wnego Urz\u0119du Statystycznego lub (b) przez wskazanie innej podstawy, w szczeg\u00f3lno\u015bci wykazu rodzaj\u00f3w materia\u0142\u00f3w lub koszt\u00f3w, w przypadku kt\u00f3rych zmiana ceny uprawnia strony umowy do \u017c\u0105dania zmiany wynagrodzenia, \n\u2022 Wykonawca wyka\u017ce spos\u00f3b okre\u015blenia wp\u0142ywu zmiany ceny materia\u0142\u00f3w lub koszt\u00f3w na koszt wykonania zam\u00f3wienia a w umowie zostanie okre\u015blony okres, w kt\u00f3rym mo\u017ce nast\u0119powa\u0107 zmiana wynagrodzenia Wykonawcy, \n\u2022 maksymalna warto\u015b\u0107 zmiany wynagrodzenia, jak\u0105 dopuszcza Zamawiaj\u0105cy w efekcie zastosowania postanowie\u0144 o zasadach wprowadzania zmian wysoko\u015bci wynagrodzenia, b\u0119dzie wynosi\u0107 25% ceny ofertowej netto, - o ile zmiany wymienione w niniejszym ust\u0119pie b\u0119d\u0105 mia\u0142y wp\u0142yw na koszty wykonania zam\u00f3wienia przez Wykonawc\u0119; \n\n13.2.zmiany wymienione w sekcji 3.2.4 pkt 4 Wytycznych dotycz\u0105cych kwalifikowalno\u015bci wydatk\u00f3w na lata 2021-2027.\n13.3. Zamawiaj\u0105cy przewiduje r\u00f3wnie\u017c mo\u017cliwo\u015b\u0107 dokonywania nieistotnych zmian postanowie\u0144 zawartej umowy w stosunku do tre\u015bci oferty, na podstawie kt\u00f3rej dokonano wyboru Wykonawcy.\n13.4. Zmiany umowy wprowadzane b\u0119d\u0105 w formie aneksu podpisanego przez obie strony, a mo\u017cliwo\u015b\u0107 ich wprowadzenia uzale\u017cniona jest od akceptacji przez Zamawiaj\u0105cego.\n\n13.1. The Contracting Authority reserves the right to make significant changes to the provisions of the concluded contract in relation to the content of the offer on the basis of which the Contractor was selected, to the following extent and situations:\n13.1.1. changes in the provisions of European Union or national law to the extent affecting the performance of the Agreement (in particular, changes in VAT rates);\nimprove the technical parameters of the subject of the contract, without affecting the net lump sum price,\n13.1.2. extension of the deadline for the execution of the contract due to the need to perform additional works, the performance of which is necessary for the proper performance of the contract, and the performance of which the Ordering Party, acting with due diligence, could not have foreseen in advance;\n13.1.3. extension of the deadline for the execution of the order as a result of force majeure along with all the consequences arising in connection with the extension of this deadline;\n13.1.4. extension of the deadline for the execution of the contract for other reasons beyond the control of the Contractor;\n13.1.5. changes in the parameters of the subject of the contract, changes in the material scope of the contract and changes in the method of performance of the contract, which do not lead to a change in the nature of the contract \u2013 technological changes, in particular: the need to perform the contract with the use of technical/technological and material solutions other than those indicated in the request for proposal, in a situation where the application of the envisaged solutions would threaten non-performance or defective performance of the contract;\n13.1.6. as a result of a change (indexation) of the Contractor's remuneration \u2013 in the event that the Agreement is extended for a period longer than 6 months, the Contractor's remuneration may change in the event of a change in the price of materials or costs related to the performance of the order above 10%. Method of determining the change in remuneration: \n\u2022 the change in remuneration will take effect no earlier than from the month following the month in which the above-mentioned change in the price of materials or costs took place, \n\u2022 the change in remuneration will take place: (a) by reference to the index of change in the price of materials or costs, in particular the indicator announced in the announcement of the President of the Central Statistical Office, or (b) by indicating another basis, in particular a list of types of materials or costs for which the change in price entitles the parties to the contract to request a change in the remuneration, \n\u2022 The Contractor shall demonstrate","created_at":"2026-06-19 13:13:11","modified_at":"2026-08-04 00:00:01","contact_persons":[{"id":108239,"forename":"Marta","surname":"Patek","phone_number":"","email":"proces.ofertowy@polpharma.com","created_by":null,"created_at":"2026-08-13 08:02:36","modified_at":"2026-08-13 08:02:36","modified_by":null}],"orders":[{"id":603327,"estimated_value":null,"order_items":[{"id":678578,"description":"Us\u0142uga badawczo-rozwojowa polegaj\u0105ca na opracowaniu technologii wytwarzania substancji czynnej oligonukleotydu sk\u0142adaj\u0105cego si\u0119 z dw\u00f3ch zmodyfikowanych nici oligonukleotydowych (sensownej i antysensownej) oraz transferze ww. technologii wytwarzania substancji czynnej do wyznaczonego miejsca produkcji\n\nResearch and development service, consisting in the development of a technology for the production of the active substance of an oligonucleotide, consisting of two modified oligonucleotide strands (sense and antisense) and the transfer of the above-mentioned technology for the production of the active substance to the designated production site. ","warranty_period":null,"cpv_items":[{"id":8512,"code":"73000000-2","name":"Us\u0142ugi badawcze i eksperymentalno-rozwojowe oraz pokrewne us\u0142ugi doradcze"}],"timetable_items":[],"fulfillment_places":[{"country":"Polska","voivodeship":"pomorskie","poviat":"starogardzki","commune":"Starogard Gda\u0144ski","locality":"Starogard Gda\u0144ski","created_by":null,"created_at":"2026-07-01 14:49:05","modified_at":"2026-07-01 16:00:39","modified_by":null,"id":776132,"type":{"id":1,"name":"adres"},"group_uuid":"afe72dcd-3df7-4289-8265-016147ed8480"}],"participation_conditions":[{"id":1949191,"description":"Zamawiaj\u0105cy uzna, \u017ce Oferent spe\u0142nia niniejszy warunek, je\u017celi z\u0142o\u017cy o\u015bwiadczenie, \u017ce dysponuje uprawnieniami niezb\u0119dnymi do prawid\u0142owej realizacji zam\u00f3wienia.\nSpos\u00f3b oceny warunku: \nWeryfikacja nast\u0105pi w oparciu o o\u015bwiadczenie Oferenta o spe\u0142nianiu warunk\u00f3w udzia\u0142u w post\u0119powaniu, zawarte w za\u0142\u0105czniku nr 1 (Formularz ofertowy). Zamawiaj\u0105cego zastrzega mo\u017cliwo\u015b\u0107 wezwania Wykonawcy do dostarczenia dokument\u00f3w potwierdzaj\u0105cych spe\u0142nienie tego warunku.\n\na.\tthe right to perform a specific activity or activity \nThe Contracting Authority shall consider that the Bidder meets this condition if it submits a declaration that it has the rights necessary for the proper performance of the contract.\nMethod of assessment of the condition: \nThe verification will take place on the basis of the Bidder's statement on meeting the conditions for participation in the procedure, contained in Appendix No. 1 (Offer Form). The Contracting Authority reserves the right to call on the Contractor to provide documents confirming the fulfilment of this condition.","type":{"id":1,"name":"Uprawnienia do wykonywania okre\u015blonej dzia\u0142alno\u015bci lub czynno\u015bci"},"created_by":null,"created_at":"2026-07-01 14:49:05","modified_at":"2026-07-01 16:00:39","modified_by":null,"group_uuid":"e76f6c74-7dc9-4992-a4c9-a231defa755d"},{"id":1949192,"description":"b.\twiedzy i do\u015bwiadczenia\nZamawiaj\u0105cy uzna, \u017ce Oferent spe\u0142nia niniejszy warunek, je\u017celi z\u0142o\u017cy o\u015bwiadczenie, \u017ce dysponuje wiedz\u0105 i do\u015bwiadczeniem niezb\u0119dnymi do prawid\u0142owej realizacji zam\u00f3wienia, tj.:\n\uf02d\tposiada minimum 5 lat do\u015bwiadczenia w produkcji substancji aktywnych lub zaawansowanych p\u00f3\u0142produkt\u00f3w w systemie jako\u015bci zgodnym z GMP, zgodnie z wymaganiami regulacyjnymi (np. EU GMP, ICH Q7)\n\uf02d\twykona\u0142 minimum 1 projekt obejmuj\u0105cy transfer technologii uwzgl\u0119dniaj\u0105cy transfer/walidacj\u0119 metod analitycznych dla substancji aktywnej w ostatnich 3 latach\n\uf02d\tPosiada minimum 1 dokumentacj\u0119 CMC / DMF / ASMF / CEP albo r\u00f3wnowa\u017cn\u0105 dokumentacj\u0105 rejestracyjn\u0105 dla substancji aktywnej, sporz\u0105dzon\u0105 w ostatnich 2 latach\n Spos\u00f3b oceny warunku: \nWeryfikacja nast\u0105pi w oparciu o o\u015bwiadczenie Oferenta o spe\u0142nianiu warunk\u00f3w udzia\u0142u w post\u0119powaniu, zawarte w za\u0142\u0105czniku nr 1 (Formularz ofertowy). Zamawiaj\u0105cy zastrzega mo\u017cliwo\u015b\u0107 wezwania Wykonawcy do dostarczenia dokument\u00f3w potwierdzaj\u0105cych spe\u0142nienie tego warunku.\n\nb.\tknowledge and experience\nThe Contracting Authority shall consider that the Tenderer meets this condition if it submits a declaration that it has the knowledge and experience necessary for the proper performance of the contract, i.e.:\n\uf02d\thas a minimum of 5 years of experience in the production of active substances or advanced intermediates in a GMP-compliant quality system, in accordance with regulatory requirements (e.g. EU GMP, ICH Q7)\n\uf02d\thas completed at least 1 project involving technology transfer including the transfer/validation of analytical methods for the active substance in the last 3 years\n\uf02d\tHas a minimum of 1 CMC / DMF / ASMF / CEP dossier or equivalent registration dossier for the active substance, drawn up in the last 2 years\n Method of assessment of the condition: \nThe verification will take place on the basis of the Bidder's statement on meeting the conditions for participation in the procedure, contained in Appendix No. 1 (Offer Form). The Contracting Authority reserves the right to call on the Contractor to provide documents confirming the fulfilment of this condition.","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2026-07-01 14:49:05","modified_at":"2026-07-01 16:00:39","modified_by":null,"group_uuid":"79b1b704-e4f1-4a40-8440-f431b79e57e2"},{"id":1949193,"description":"c.\tpotencja\u0142u technicznego\nZamawiaj\u0105cy uzna, \u017ce Oferent spe\u0142nia niniejszy warunek, je\u017celi z\u0142o\u017cy o\u015bwiadczenie, \u017ce dysponuje zapleczem technicznym niezb\u0119dnym do prawid\u0142owej realizacji zam\u00f3wienia, tj.:\nposiada lub ma zapewniony dost\u0119p do: urz\u0105dze\u0144 do syntezy, oczyszczania i liofilizowania oligonukleotyd\u00f3w oraz aparatury analitycznej pozwalaj\u0105cej na przeprowadzenie bada\u0144 jako\u015bciowych substancji czynnej b\u0119d\u0105cej przedmiotem zam\u00f3wienia (w tym w szczeg\u00f3lno\u015bci oznaczenie czysto\u015bci, identyfikacji oraz zawarto\u015bci).\nDost\u0119p, o kt\u00f3rym mowa powy\u017cej, mo\u017ce wynika\u0107 w szczeg\u00f3lno\u015bci z praw w\u0142asno\u015bci, um\u00f3w najmu, dzier\u017cawy, wsp\u00f3\u0142pracy lub innych stosunk\u00f3w prawnych zapewniaj\u0105cych faktyczn\u0105 mo\u017cliwo\u015b\u0107 wykorzystania zasob\u00f3w na potrzeby realizacji zam\u00f3wienia.\nSpos\u00f3b oceny warunku: \nWeryfikacja nast\u0105pi w oparciu o o\u015bwiadczenie Oferenta o spe\u0142nianiu warunk\u00f3w udzia\u0142u w post\u0119powaniu, zawarte w za\u0142\u0105czniku nr 1 (Formularz ofertowy). Zamawiaj\u0105cy zastrzega mo\u017cliwo\u015b\u0107 wezwania Wykonawcy do dostarczenia dokument\u00f3w potwierdzaj\u0105cych spe\u0142nienie tego warunku.\n\nc.\ttechnical potential\nThe Contracting Authority shall consider that the Bidder meets this condition if it submits a declaration that it has the technical facilities necessary for the proper performance of the contract, i.e.:\nhas or has access to: equipment for synthesis, purification and freeze-drying of oligonucleotides and analytical equipment allowing for qualitative tests of the active substance being the subject of the contract (including, in particular, determination of purity, identification and content).\nThe access referred to above may result, in particular, from ownership rights, lease agreements, leases, cooperation or other legal relationships that ensure that the resources can be effectively used for the performance of the contract.\nMethod of assessment of the condition: \nThe verification will take place on the basis of the Bidder's statement on meeting the conditions for participation in the procedure, contained in Appendix No. 1 (Offer Form). The Contracting Authority reserves the right to call on the Contractor to provide documents confirming the fulfilment of this condition.","type":{"id":3,"name":"Potencja\u0142 techniczny"},"created_by":null,"created_at":"2026-07-01 14:49:05","modified_at":"2026-07-01 16:00:39","modified_by":null,"group_uuid":"0d98e426-c1df-4bd8-a6e2-cf544013d09c"},{"id":1949194,"description":"d.\tos\u00f3b zdolnych do wykonania zam\u00f3wienia\nZamawiaj\u0105cy uzna, \u017ce Oferent spe\u0142nia niniejszy warunek, je\u017celi z\u0142o\u017cy o\u015bwiadczenie, \u017ce dysponuje zasobami ludzkimi niezb\u0119dnymi do prawid\u0142owej realizacji zam\u00f3wienia, tj.\n\uf02d\tCo najmniej 3 osoby w zespole posiadaj\u0105 minimum 3 lata do\u015bwiadczenia w pracy przy syntezie oligonukleotyd\u00f3w (scale-up lub GMP lub pilot)\n\uf02d\tZesp\u00f3\u0142 bra\u0142 udzia\u0142 w realizacji minimum 2 projekt\u00f3w obejmuj\u0105cych:\n\uf02d\tsyntez\u0119 oligonukleotydu\n\uf02d\toraz co najmniej jeden z etap\u00f3w: oczyszczanie / ultrafiltracja / liofilizacja\n\uf02d\tZesp\u00f3\u0142 posiada udokumentowane do\u015bwiadczenie (CV) os\u00f3b kluczowych obejmuj\u0105ce:\n\uf02d\tznajomo\u015b\u0107 proces\u00f3w syntezy w fazie sta\u0142ej\n\uf02d\toraz wykorzystanie technik analitycznych typowych dla oligonukleotyd\u00f3w (np. HPLC / LC-MS).\n\nSpos\u00f3b oceny warunku: \nWeryfikacja nast\u0105pi w oparciu o o\u015bwiadczenie Oferenta o spe\u0142nianiu warunk\u00f3w udzia\u0142u w post\u0119powaniu, zawarte w za\u0142\u0105czniku nr 1 (Formularz ofertowy). Zamawiaj\u0105cego zastrzega mo\u017cliwo\u015b\u0107 wezwania Wykonawcy do dostarczenia dokument\u00f3w potwierdzaj\u0105cych spe\u0142nienie tego warunku.\n\nd.\tpersons capable of performing the order\nThe Contracting Authority shall consider that the Tenderer fulfils this condition if it submits a declaration that it has the human resources necessary for the proper performance of the contract, i.e.\n\uf02d\tAt least 3 people in the team have a minimum of 3 years of experience working in oligonucleotide synthesis (scale-up or GMP or pilot)\n\uf02d\tThe team participated in the implementation of at least 2 projects including:\n\uf02d\toligonucleotide synthesis\n\uf02d\tand at least one of the stages: purification / ultrafiltration / freeze-drying\n\uf02d\tThe team has a documented experience (CV) of key people, including:\n\uf02d\tknowledge of solid-phase synthesis processes\n\uf02d\tand the use of analytical techniques typical of oligonucleotides (e.g., HPLC/LC-MS).\n\nMethod of assessment of the condition: \nThe verification will take place on the basis of the Bidder's statement on meeting the conditions for participation in the procedure, contained in Appendix No. 1 (Offer Form). The Contracting Authority reserves the right to call on the Contractor to provide documents confirming the fulfilment of this condition.","type":{"id":4,"name":"Osoby zdolne do wykonania zam\u00f3wienia"},"created_by":null,"created_at":"2026-07-01 14:49:05","modified_at":"2026-07-01 16:00:39","modified_by":null,"group_uuid":"15ea9092-03f7-457c-949b-4daf3d59f43e"},{"id":1949195,"description":"e.\tsytuacji ekonomicznej lub finansowej\nZamawiaj\u0105cy uzna, \u017ce Oferent spe\u0142nia niniejszy warunek, je\u017celi z\u0142o\u017cy o\u015bwiadczenie, \u017ce znajduje si\u0119 w sytuacji ekonomicznej i finansowej zapewniaj\u0105cej prawid\u0142ow\u0105 realizacj\u0119 zam\u00f3wienia, w szczeg\u00f3lno\u015bci nie znajduje si\u0119 w stanie upad\u0142o\u015bci, restrukturyzacji lub likwidacji, a tak\u017ce nie zalega w op\u0142acaniu podatk\u00f3w oraz sk\u0142adek na ubezpieczenia spo\u0142eczne, ubezpieczenie zdrowotne, Fundusz Pracy i Fundusz Gwarantowanych \u015awiadcze\u0144 Pracowniczych.\nSpos\u00f3b oceny warunku: \nWeryfikacja nast\u0105pi w oparciu o o\u015bwiadczenie Oferenta o spe\u0142nianiu warunk\u00f3w udzia\u0142u w post\u0119powaniu, zawarte w za\u0142\u0105czniku nr 1 (Formularz ofertowy). Zamawiaj\u0105cy zastrzega mo\u017cliwo\u015b\u0107 wezwania Wykonawcy do dostarczenia dokument\u00f3w potwierdzaj\u0105cych spe\u0142nienie tego warunku.\n\ne.\teconomic or financial situation\nThe Contracting Authority shall consider that the Tenderer fulfils this condition if it submits a declaration that it is in an economic and financial situation ensuring the proper performance of the contract, in particular it is not in a state of bankruptcy, restructuring or liquidation, and is not in arrears in the payment of taxes and social security contributions, health insurance, the Labour Fund and the Guaranteed Employee Benefits Fund.\nMethod of assessment of the condition: \nThe verification will take place on the basis of the Bidder's statement on meeting the conditions for participation in the procedure, contained in Appendix No. 1 (Offer Form). The Contracting Authority reserves the right to call on the Contractor to provide documents confirming the fulfilment of this condition.","type":{"id":5,"name":"Sytuacja ekonomiczna i finansowa"},"created_by":null,"created_at":"2026-07-01 14:49:05","modified_at":"2026-07-01 16:00:39","modified_by":null,"group_uuid":"5ff3522c-933f-4bfa-92cb-b6827f108cb8"}],"category":{"id":1,"name":"Us\u0142uga"},"subcategory":{"id":4,"name":"Us\u0142ugi badawcze"},"created_by":null,"created_at":"2026-06-19 13:13:11","modified_at":"2026-07-01 16:00:39","modified_by":null,"group_uuid":"441ee537-64b2-427b-8e23-879d472f684d"}],"evaluation_criteria":[{"id":1092677,"price_criterion":true,"description":"1 Oferty b\u0119d\u0105 oceniane na podstawie nast\u0119puj\u0105cych kryteri\u00f3w: \n\u2013 cena netto \u2013 100%, \nWi\u0119cej informacji w za\u0142\u0105cznikach\n\nBids will be evaluated on the basis of the following criteria: \n\u2013 net price \u2013 100%, \nMore in attached document.","created_by":null,"created_at":"2026-07-01 14:53:53","modified_at":"2026-07-01 16:00:39","modified_by":null,"group_uuid":"17598537-d381-48a0-832a-ee6426e2b5e9"}],"is_variant":false,"title":"Us\u0142uga badawczo-rozwojowa/Research and development service","order_node":{"id":455368},"created_by":null,"created_at":"2026-06-19 13:13:11","modified_at":"2026-07-01 16:00:39","modified_by":null}],"created_by":{"id":106897,"contact_persons":[]},"modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":"Zak\u0142ady Farmaceutyczne Polpharma SA","identification_number_type":"nip","identification_number":"5920202822","address":{"country":"Polska","voivodeship":"pomorskie","poviat":"starogardzki","commune":"Starogard Gda\u0144ski","locality":"Starogard Gda\u0144ski","created_by":null,"created_at":null,"modified_at":null,"modified_by":null,"id":1054564,"street":"Pelpli\u0144ska ","number_description":"19","postcode":"83-200"},"created_by":{"id":106897,"contact_persons":[]},"created_at":"2026-06-19 13:13:10","modified_at":"2026-06-19 13:13:10","modified_by":{"id":106897,"contact_persons":[]},"id":374191},"advertisement":{"id":282251,"number":"2026-106897-282251","publication_date":"2026-07-01","created_by":{"id":106897,"contact_persons":[]},"created_at":"2026-06-19 13:13:10","modified_at":"2026-08-04 00:00:01","modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":3,"label":"CLOSED","name":"Zamkni\u0119te"},"all_available_version_ids":[373195],"enrollment":{"id":72669,"name":null,"number":"007/26","activity":{"created_by":null,"created_at":"2025-08-12 10:03:17","modified_at":"2025-08-12 10:03:17","modified_by":null},"region":null,"institution":{"created_by":null,"created_at":"2025-08-12 11:06:27","modified_at":"2025-08-12 11:06:27","modified_by":null},"full_number":"FENG.05.01-IP.01-007/26","perspective":{},"programme":{"created_by":null,"created_at":"2023-02-01 09:21:41","modified_at":"2023-02-01 09:21:41","modified_by":null},"priority":{"created_by":null,"created_at":"2025-08-12 10:02:53","modified_at":"2025-08-12 10:02:53","modified_by":null},"type":"enrollment","created_by":null,"created_at":"2026-06-19 13:22:32","modified_at":"2026-06-19 13:22:32","modified_by":null},"projects":[],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":373195,"publication_date":"2026-07-01"},"id":2624543,"name":"en TT .pdf","file":{"id":2913974,"name":"en TT .pdf","created_at":"2026-07-01 15:52:45","created_by":{"forename":"Marta","surname":"Patek"},"uri":"/api/files/2913974"},"group_uuid":"6611f597-1287-4720-9f13-7f93ef517001"},{"origin":{"id":373195,"publication_date":"2026-07-01"},"id":2624544,"name":"pol TT pdf.pdf","file":{"id":2913975,"name":"pol TT pdf.pdf","created_at":"2026-07-01 15:52:56","created_by":{"forename":"Marta","surname":"Patek"},"uri":"/api/files/2913975"},"group_uuid":"31bdae4d-876b-41e3-ba06-c1512d63858f"},{"origin":{"id":373195,"publication_date":"2026-07-01"},"id":2624545,"name":"Appendix No. 3 _Non-disclosure-agreement_EN.docx","file":{"id":2913977,"name":"ZA\u0141\u0104CZNK NR 3 _Non-disclosure-agreement_EN.docx","created_at":"2026-07-01 15:53:27","created_by":{"forename":"Marta","surname":"Patek"},"uri":"/api/files/2913977"},"group_uuid":"82e23132-6e62-46ea-93ee-72e62f3ad388"},{"origin":{"id":373195,"publication_date":"2026-07-01"},"id":2624546,"name":"ZA\u0141\u0104CZNIK NR 3 UMOWA O POUFNO\u015aCI .docx","file":{"id":2913976,"name":"ZA\u0141\u0104CZNIK NR 3 UMOWA O POUFNO\u015aCI .docx","created_at":"2026-07-01 15:53:20","created_by":{"forename":"Marta","surname":"Patek"},"uri":"/api/files/2913976"},"group_uuid":"0f2b2b68-1776-4205-8070-5a59dedeee2d"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}