{"status":"OK","data":{"advertisement":{"id":323607,"title":"Development of system design and software for an Electronic Control Unit (ECU) intended for the electro-hydraulic steering system","partial_offer_allowed":false,"publication_date":"2025-09-18","submission_deadline":"2025-09-25 23:59:59","planned_sign_date":null,"supplementary_orders":"Not applicable.","terms_of_contract_change":"The Contracting Authority provides for the possibility of amending the provisions of the concluded conditional contract in relation to the content of the tender offer on the basis of which the Contractor was selected, in the following scope:\n1)\tThe necessity to introduce amendments shall result from amendments to contracts between the Contracting Authority and a party other than the Contractor, including another contractor or institution supervising the performance of the project under which the Contract is executed, while the amendment may concern only those provisions of the conditional contract that shall be directly affected by the modifications, and the amendments shall not lead to an increase in the Contractor's remuneration.\n2)\tDue to a prolonged procedure for the selection of the Contractor in the procedure for the award of this conditional contract, or due to other circumstances that could not have been foreseen beforehand, preventing the proper execution of the subject of the contract, it shall become necessary to amend the completion dates specified in the request for quotation or the conditional contract.\n3)\tAmendments to the contract completion date shall be acceptable in cases of:\na)\tforce majeure events preventing the execution of the subject of the contract,\nb)\tcircumstances that could not have been foreseen by the contracting parties despite the exercise of due diligence or reasons of formal and legal obstacles beyond the control of the contracting parties, \nc)\tchanges to the planned project are necessary and require acceptance by the Intermediary Institution (in such cases, the contract completion date may be extended by the period corresponding to the time from the submission of the request for changes to the planned project by the Contracting Authority until the acceptance of the changes by the Intermediary Institution),\nd)\tdelays at earlier stages of the project,\ne)\tdelays in or changes to administrative or other institutions' decisions (decisions by public authorities, changes to the applicable provisions of law, awaiting previously unforeseen but necessary expert assessments, court rulings, etc.), beyond the control of the Contracting Authority and the Contractor, which the contracting parties were unable to foresee despite exercising due diligence,\nf)\tperforming the subject of the contract before the contract completion date and obtaining the funds to pay the Contractor\u2019s remuneration at an earlier date by the Contracting Authority, \ng)\ta need to perform additional deliveries, services, or construction works from the existing Contractor, not covered by the basic order, may arise during the performance of the subject of the contract, provided that they have become necessary, and all of the following conditions are fulfilled:\n- the change of the current Contractor cannot be made for economic or technical reasons, in particular concerning the interchangeability or interoperability of equipment, services or installations ordered under the basic order, and\n- the change of the current Contractor would cause significant inconvenience or a significant increase in costs for the Contracting Authority, and\n- the value of the amendment does not exceed 50% of the order value specified originally in the conditional contract signed with the selected Contractor.\nAll changes to the provisions of the conditional contract shall be made in writing otherwise shall be null and void. The occurrence of any of the circumstances mentioned above to the extent that they affect the performance of the conditional contract may result in extending/amending the contract completion date accordingly by the time required to properly complete the execution of the subject of the contract. Any delays/changes must be documented by relevant protocols signed by the Contractor and the Contracting Authority, based on which the parties shall agree upon new deadlines.","created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:34:12","contact_persons":[{"id":102647,"forename":"Marcin","surname":"\u0141adziak","phone_number":"661 927 000","email":"mladziak@whitedriveproducts.com","created_by":null,"created_at":"2025-09-03 14:22:04","modified_at":"2025-09-03 14:22:04","modified_by":null}],"orders":[{"id":522725,"estimated_value":null,"order_items":[{"id":589247,"description":"The subject of the contract includes the development of system design and software for an Electronic Control Unit (ECU) intended for the electro-hydraulic steering system of mobile machinery particularly in the segment of agricultural machines (tractors, sprayers, combines), construction and road machines (wheel loaders, backhoe loaders, telescopic loaders), forestry, municipal, and special-purpose machines.\nThe subject of the contract covers the full development cycle: from requirements gathering and safety analyses, through software architecture and ECU software implementation, up to validation.\nThe subject of the contract does not include creating the end-user environment (scope of works carried out by the Contracting Authority).\nThe subject of the contract shall comply with the conditions set out in this request for quotation if it meets the requirements specified below, either in a compliant or equivalent manner. It is the responsibility of the Tenderer to clarify the extent of equivalence of the proposed parameters.\n\nTask 1 \u2013 Collection and Analysis of Functional and Non-Functional Requirements for the ECU:\nDevelopment stage: concept phase. \nScope: The Contractor shall carry out the concept phase of the ECU development, focusing on requirements elicitation and definition, based on the input provided by the Contracting Authority. The activities will ensure that both functional safety and cybersecurity considerations are embedded in the system from the very beginning. \nActivities include: \n- Production of a comprehensive product concept, addressing all functional aspects as well as the integration of functional safety and cybersecurity requirements. \n- Execution of HARA (Hazard Analysis and Risk Assessment) and TARA (Threat Analysis and Risk Assessment) to identify safety and cybersecurity goals. \n- Development of a structured set of functional and non-functional requirements, including those related to functional safety and cybersecurity. \nExpected Input: Product definition, including a description of the electro-hydraulic steering system, technical details of the flow control principle, construction of the steering unit, operating conditions, and available interface specifications which will be provided by the Contracting Authority. \nExpected Output: \n- product concept, \n- documented safety goals, \n- documented cybersecurity goals, \n- functional and technical requirements specification. \n\nTask 2 \u2013 Development of the Software Architecture of the ECU and the Concept of Functional Control Blocks:\nDevelopment stage: system level development. \nScope: The Contractor shall develop the complete software architecture of the ECU, ensuring that functional safety and cybersecurity requirements are properly embedded and allocated. The task focuses on translating the defined requirements into a structured technical concept at system and software level. \nActivities include: \n- Derivation of detailed technical requirements, including those related to functional safety and cybersecurity together with the Contracting Authority. \n- Definition of hardware-software interfaces together with the Contracting Authority. \n- Development of the System and Software Architecture, including the definition of functional control blocks. \n- Allocation of requirements to hardware and software elements and linking them to the corresponding architecture components. \nExpected Input: Outputs from Task 1 and hardware architecture.\nExpected Output: \n- complete technical concept, including system (architecture) and software architecture level,\n- documented safety and cybersecurity technical requirements, \n- allocation matrix of requirements to hardware and software areas. \n\nTask 3 \u2013 Implementation and Integration of ECU Software According to the Defined Architecture:\nDevelopment stage: software level development and integration. \nScope: This task focuses exclusively on the implementation of ECU software and its integration according to the architecture defined in Task 2. No hardware implementation is included at this stage. The Contractor shall develop the ECU software and integrate it with the ECU hardware platform. \nActivities include: \n- ECU software development (without OS, excluding hardware-level drivers), covering: \n- co-development of QM software, \n- integration and activation of functional safety and cybersecurity functions, \n- implementation of OTA (Over-the-Air) update mechanisms, \n- parametrization and dynamic configuration, \n- development or integration of diagnostic functions. \n- Software integration testing to verify the correct operation of the ECU software within the defined architecture. \nExpected Input: Outputs from Task 2. \nExpected Output: \n- detailed software architecture documentation, \n- SBOM, \n- test plan and executed test reports, \n- complete software source code with technical documentation,\n- complete binary images of software.\n\nTask 4 \u2013 Functional and Integration Testing of the ECU in a Laboratory Environment:\nDevelopment stage: system level development.\nScope: The Contractor shall perform system-level functional and integration testing of the ECU in a controlled laboratory environment together with the Contracting Authority. The purpose of this task is to verify that the ECU software, hardware platform, and user environment operate correctly as a complete system, in line with defined requirements for functionality, safety, and cybersecurity, using both simulated input signals and real components such as sensors (for steering angle, pressure, speed), solenoid valves, communication buses (CAN). \nThe tests shall include verification of compliance with functional and non-functional requirements, and preliminary analysis of compliance with standards: \n- ISO 13849 (PL d), \n- ISO 25119 (AgPLd), \n- IEC 62443 or ISO/SAE21434. \nActivities include: Execution of system integration testing, covering ECU functions, communication protocols, diagnostics, and safety/security mechanisms. \nExpected Input: Outputs from Task 2 and Task 3. \nExpected Output: \n- system integration test plan, \n- executed test cases and corresponding test reports confirming system functionality and compliance,\n- the ECU model should achieve the following parameters: \n- compliance with functional safety at SIL2/PLd level,\n- measurement of system response time confirming SAE safety level, time from the application of the control signal to achieving pressure at output (actuator). Separately for: \nanalog input (0\u201310 V): approximately 100ms, \ncurrent input (4\u201320 mA): approximately 100ms, \nCAN command (ID, control data, message type): 100ms, \n- integration tests with physical components: \nreading data from steering, position, and pressure sensors and their correct interpretation in ECU logic: verification of measurement accuracy with a tolerance of 3% in the range 0-10V, 4-20mA, \nverification of correct reception of CAN frames Standard ID and Extended ID (sent frame matches the received one).\n\nFinal result of works\n- Documentation to support configuration management, certification, and end-user operation of the ECU:\n- internal documentation of the system and software baseline environment, \n- end-user manual and guidelines to support safe and secure ECU use, \n- documentation suitable for certification and long-term system maintenance,\n- materials (and mandatory instruction sessions) for engineers on safe modification of the existing system.\nDocumentation must reflect the developed system and software baseline and provide clear instructions for integration and operation.\n- Complete software source code.\n- Complete binary images of software.\n\nSafety and reliability requirements \n- The system and software shall enable achievement of PL d/SIL 2. \n- The system shall provide robustness against failures and allow detection and handling of fault states. \n\nStandards and directives \nThe system design and software shall comply with the following standards and directives: \n- ISO 13849 (PL d), \n- EN 16590 (SIL 2, AgPL d, SRL 3), \n- ISO 19014, \n- EMC Directive 2004/108/EC, 2009/64/EC, \n- CE marking requirements,\n- ISO 21434 or IEC62443,\n- ISO 24089, CRA,\n- SPICE, IATF 16949,\n- ISO 25119 (AgPLd),\n- MISRA. ","warranty_period":"-","cpv_items":[{"id":8513,"code":"73100000-3","name":"Us\u0142ugi badawcze i eksperymentalno-rozwojowe"}],"timetable_items":[],"fulfillment_places":[{"country":"Polska","voivodeship":"dolno\u015bl\u0105skie","poviat":"wroc\u0142awski","commune":"Kobierzyce","locality":"Bielany Wroc\u0142awskie","created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"id":666860,"type":{"id":1,"name":"adres"},"group_uuid":"3f3ed74e-32be-43c1-a8dd-6006806a5e40"}],"participation_conditions":[{"id":1658285,"description":"Only an entity that fulfills all of the following conditions jointly may apply for the award of the conditional contract:\n1)\tActive business activity (in the case of domestic contractors \u2013 active entry in the Central Registration and Information on Business (CEIDG) or the National Court Register (KRS)) and authorization to carry out activities related to the execution of the subject of the contract \u2013 verification based on the declaration constituting an integral part of the tender offer.\n2)\tNo liquidation or bankruptcy has been opened against the Tenderer \u2013 verification based on the declaration constituting an integral part of the tender offer.\n3)\tNo personal or capital relations with the Contracting Authority \u2013 verification based on the declaration constituting an integral part of the tender offer.","type":{"id":1,"name":"Uprawnienia do wykonywania okre\u015blonej dzia\u0142alno\u015bci lub czynno\u015bci"},"created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"95d32809-4644-41f8-b469-d069ce444601"},{"id":1658286,"description":"Only an entity that has the knowledge and experience to properly execute the subject of the contract may apply for the award of the conditional contract. \nThe Tenderer must have documented experience in the field of Functional Safety and in the field of Cybersecurity, particularly within the automotive or agricultural sectors, i.e. the Tenderer carried out:\n1)\tAt least 10 projects in the field of Functional Safety in the last 15 years within the automotive or agricultural sectors with at least 1 project related to steering systems, and \n2)\tAt least 1 project in the field of Cybersecurity in the last 5 years within the automotive or agricultural sectors. \nThe fulfilment of the condition shall be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation). The Contracting Authority may require the Tenderer to provide additional documentation confirming fulfillment of this condition.","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"ec2ade89-fb85-4229-9cb6-60cb13255eaa"},{"id":1658287,"description":"Only an entity which has the technical capacity to properly execute the subject of the contract may apply for the award of the conditional contract:\n1)\tHas access to laboratory equipment required for ECU development and validation, such as: \n- CAN analyzers and bus monitoring, \n- oscilloscopes and logic analyzers.\n2)\tHas intangible assets required for the execution of the subject of the contract, including: \n- licenses for static code analysis and MISRA compliance tools,\n- software for version control,\n- access to standards described in point 3 of the request for quotation,\n- software supporting requirements management, hazard and risk analysis, safety analysis, and traceability of development and testing activities.\n3)\tHas infrastructure supporting hardware and software integration, including: \n- embedded software development environments necessary for the execution of the subject of the contract (e.g. compilers, IDEs, version control).\nThe fulfilment of the condition shall be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation). The Contracting Authority may require the Tenderer to provide additional documentation confirming fulfillment of this condition.","type":{"id":3,"name":"Potencja\u0142 techniczny"},"created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"fc247251-71cb-47d2-a7ed-084f234040bf"},{"id":1658288,"description":"Only an entity which has the human resources required for the proper execution of the subject of the contract may apply for the award of the conditional contract:\n1)\tAt least one functional safety and security expert with documented experience in embedded systems development, particularly electronic steering systems.\n2)\tAt least one functional safety system engineer with documented experience in embedded systems development, holding a university degree in electronics engineering or computer science, or relevant professional certificates as a functional safety systems engineer.\n3)\tAt least one functional safety software engineer with documented experience in embedded systems development, holding a university degree in electronics engineering or computer science, or relevant professional certificates as a functional safety software engineer.\n4)\tAt least one cybersecurity engineer with documented experience in embedded systems development, holding a university degree in electronics engineering or computer science, or relevant professional certificates as a cybersecurity engineer.\nThe fulfilment of the condition will be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation). The Contracting Authority may require the Tenderer to provide additional documentation confirming fulfillment of this condition.","type":{"id":4,"name":"Osoby zdolne do wykonania zam\u00f3wienia"},"created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"1a27e5e4-7b8e-483c-87b4-f4d8e5c9f72b"},{"id":1658289,"description":"Only an entity that is in an economic and financial situation ensuring the proper execution of the full scope of the subject of the contract, including its timely execution, and that is not in bankruptcy or liquidation, and no bankruptcy or liquidation proceedings have been initiated against the Tenderer, may apply for the award of the conditional contract. The fulfilment of the condition will be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation).","type":{"id":5,"name":"Sytuacja ekonomiczna i finansowa"},"created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"2fc6d670-1ce2-47b5-8d10-385a0cd31cba"}],"category":{"id":1,"name":"Us\u0142uga"},"subcategory":{"id":4,"name":"Us\u0142ugi badawcze"},"created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"4407f684-31ec-442b-9362-c4c3e8f46dfb"}],"evaluation_criteria":[{"id":931300,"price_criterion":false,"description":"1)\tFulfilment of the conditions for participation in the procedure set out in point 5 of the request for quotation.\n2)\tSubmission of a tender offer by the deadline. \nFailure to fulfill the above criteria will result in the rejection of the tender offer. Criterion no. 1 may be supplemented.","created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"71d645a8-f789-4054-8ecd-33804f828e61"},{"id":931301,"price_criterion":false,"description":"Preparation of a tender offer in accordance with the requirements set out in point 2 of the request for quotation.\nFailure to fulfil the above criterion will result in the rejection of the tender offer, however, it is possible to supplement the tender offer.","created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"06a236ac-7868-4a38-a4a0-158ce48b3d85"},{"id":931302,"price_criterion":false,"description":"Submission of all required appendices to the request for quotation set out in point 2.2 of the request for quotation.\nFailure to fulfil the above criterion will result in the rejection of the tender offer, however, it is possible to supplement the tender offer.","created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"27c33abf-901d-4752-95a6-52b362274d23"},{"id":931303,"price_criterion":false,"description":"The offered scope of the contract complies with the specified requirements. \nFailure to fulfil the above criterion will result in the rejection of the tender offer, however, it is possible to supplement the tender offer.","created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"d68e442e-d338-4ad2-9666-3f1eacf1268a"},{"id":931304,"price_criterion":true,"description":"Net price\nTotal net price \nWeight: 100%\nMethodology for awarding points: (price of the tender offer with the lowest net price among the evaluated tender offers / price indicated in the evaluated tender offer) x 100 points x 100%.","created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null,"group_uuid":"9e6d5590-133f-46f9-91a6-b2b95fa7c213"}],"is_variant":false,"title":"Development of system design and software for ECU","order_node":{"id":396316},"created_by":null,"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-18 15:33:18","modified_by":null}],"created_by":{"modified_by":null,"id":104502,"contact_persons":[]},"modified_by":{"modified_by":null,"id":104502,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":"White Drive Motors and Steering sp. z o.o.","identification_number_type":"nip","identification_number":"8942583804","address":{"country":"Polska","voivodeship":"dolno\u015bl\u0105skie","poviat":"wroc\u0142awski","commune":"Kobierzyce","locality":"Bielany Wroc\u0142awskie","created_by":null,"created_at":null,"modified_at":null,"modified_by":null,"id":903186,"street":"Logistyczna","number_description":"1","postcode":"55-040"},"created_by":{"modified_by":null,"id":104502,"contact_persons":[]},"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-17 14:15:10","modified_by":{"modified_by":null,"id":104502,"contact_persons":[]},"id":324467},"advertisement":{"id":245712,"number":"2025-104502-245712","publication_date":"2025-09-18","created_by":{"modified_by":null,"id":104502,"contact_persons":[]},"created_at":"2025-09-17 14:15:10","modified_at":"2025-09-25 15:30:39","modified_by":{"modified_by":null,"id":104502,"contact_persons":[]},"status":{"id":4,"label":"CANCELLED","name":"Anulowane"},"all_available_version_ids":[323607],"enrollment":{"id":64288,"name":"\u015acie\u017cka SMART \u2013 Projekty realizowane w konsorcjach","number":"002/25","activity":{"created_by":null,"created_at":"2023-02-01 09:22:25","modified_at":"2023-02-01 09:22:25","modified_by":null},"region":null,"institution":{"created_by":null,"created_at":"2023-02-01 09:27:55","modified_at":"2023-02-01 09:27:55","modified_by":null},"full_number":"FENG.01.01-IP.01-002/25","perspective":{},"programme":{"created_by":null,"created_at":"2023-02-01 09:21:41","modified_at":"2023-02-01 09:21:41","modified_by":null},"priority":{"created_by":null,"created_at":"2023-02-01 09:21:51","modified_at":"2023-02-01 09:21:51","modified_by":null},"type":"enrollment","created_by":null,"created_at":"2025-09-17 10:51:48","modified_at":"2025-09-17 10:51:48","modified_by":null},"projects":[],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":323607,"publication_date":"2025-09-18"},"id":2061935,"name":"Appendix no. 1 - Tender offer form","file":{"id":2292407,"name":"Appendix 1 to the Request for quotation.docx","created_at":"2025-09-18 12:06:47","created_by":{"forename":"Marcin","surname":"\u0141adziak"},"uri":"/api/files/2292407"},"group_uuid":"e1968ec3-7ead-4e3a-9354-4244f7727a95"},{"origin":{"id":323607,"publication_date":"2025-09-18"},"id":2062583,"name":"Appendix no. 2 - Declaration confirming the fulfilment of the conditions of participation","file":{"id":2293130,"name":"Appendix 2 to the Request for quotation.docx","created_at":"2025-09-18 15:06:43","created_by":{"forename":"Marcin","surname":"\u0141adziak"},"uri":"/api/files/2293130"},"group_uuid":"b5cedaaa-e4b1-4167-8ab0-b207d2164717"},{"origin":{"id":323607,"publication_date":"2025-09-18"},"id":2062584,"name":"Request for quotation","file":{"id":2293131,"name":"Request for quotation.pdf","created_at":"2025-09-18 15:07:00","created_by":{"forename":"Marcin","surname":"\u0141adziak"},"uri":"/api/files/2293131"},"group_uuid":"1762228c-c7b7-436a-8b99-3fdff977ad92"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}