{"status":"OK","data":{"advertisement":{"id":308978,"title":"Budowa bateryjnego magazynu energii elektrycznej w miejscowo\u015bci Budzy\u0144 realizowana przez Farm\u0119 Fotowoltaiczn\u0105 Budzy\u0144 sp. z o.o.","partial_offer_allowed":false,"publication_date":"2025-06-25","submission_deadline":"2025-07-10 12:00:00","planned_sign_date":"2025-12-01","supplementary_orders":null,"terms_of_contract_change":null,"created_at":"2025-06-25 15:59:26","modified_at":"2025-07-10 12:00:03","contact_persons":[{"id":97863,"forename":"EDP ","surname":"Renewables ","phone_number":"","email":"rfp_bess_budzyn@edp.com","created_by":null,"created_at":"2025-09-10 11:52:15","modified_at":"2025-09-10 11:52:15","modified_by":null}],"orders":[{"id":499809,"estimated_value":null,"order_items":[{"id":563272,"description":"The main objective of this Pre-qualification Notice is to define the minimum requirements in respect to qualification to binding offer stage.\n\nA detailed description of the contract's subject matter will be included in the Request for Proposal, which will be provided to entities qualified for the next stage of the procedure, i.e. binding offer stage, as outlined in the Pre-qualification Phase described in this Notice. \n\nThe EDPR wants to install a Battery Energy Storage System (BESS) AC coupled located in Budzyn, Poland, to participate in the different balancing mechanisms and new frequency response applications. Hereby EDPR wishes to develop a BESS AC coupled project with 60 MW installed power where the plant is allocated in dz. nr 201/2, area 0010 Ostr\u00f3wki, cadastral unit: 300102_5 Budzy\u0144 Chodzie\u017c county, Poland, with a storage duration of 4h making up a 240MWh system. Also, energy arbitrage and energy shifting will be performed. EDPR wants to install a BESS AC coupled in stand-alone configuration, to participate in the different balancing mechanism and new frequency response applications. Also, energy arbitrage and energy shifting will be performed.\n\nConsequently, the BESS equipment proposed as part of this Pre-qualification Notice shall meet the most recent and in force requirements regarding the Regulations on Technical Safety and Service Quality: Energy Law and Energy Regulatory Office (URE-Urz\u0105d Regulacji Energetyki); Technical Standards for Ancillary Services: TSO (PSE-Polskie Sieci Elektroenergetyczne) and the Technical Normative Specification: Polish Energy Storage Association (PESA - Polskie Stowarzyszenie Magazynowania Energii) as well as their annexes and any other applicable technical requirements. All these regulations in their latest available version.\n\nA detailed description of the subject matter of the contract shall be included in the Request for Proposal which shall be submitted to entities qualified for the next stage of the procedure.","warranty_period":null,"cpv_items":[{"id":2087,"code":"31000000-6","name":"Maszyny, aparatura, urz\u0105dzenia i wyroby elektryczne"},{"id":2094,"code":"31121110-4","name":"Przekszta\u0142tniki mocy"},{"id":2147,"code":"31200000-8","name":"Aparatura do przesy\u0142u i eksploatacji energii elektrycznej"},{"id":2241,"code":"31430000-9","name":"Akumulatory elektryczne"},{"id":2371,"code":"31700000-3","name":"Urz\u0105dzenia elektroniczne, elektromechaniczne i elektrotechniczne"},{"id":7599,"code":"51112200-2","name":"Us\u0142ugi instalowania sprz\u0119tu sterowania energi\u0105 elektryczn\u0105"}],"timetable_items":[],"fulfillment_places":[{"country":"Polska","voivodeship":"wielkopolskie","poviat":"chodzieski","commune":"Budzy\u0144","locality":"Ostr\u00f3wki","created_by":null,"created_at":"2025-06-25 16:34:17","modified_at":"2025-06-25 16:35:03","modified_by":null,"id":636750,"type":{"id":1,"name":"adres"},"group_uuid":"16fa3318-a62e-42d8-aac8-0292e11317fe"}],"participation_conditions":[{"id":1578669,"description":"Knowledge and experience \n\nThe Contracting Authority shall consider that the Contractor meets the conditions for participation in the Procedure in terms of possessing knowledge and experience, if the Contractor during the last 15 years prior to the deadline for submitted bids, or during the entire period of operation if shorter, demonstrates the following: \n\nEU References from Relevant Past Projects: The Contractor has to demonstrate a track record and competency in successfully managing and delivering complex BESS projects within the EU, with a minimum total aggregate volume (contracts executed with final clients) of 700MWh. \n\nTo evidence this requirement compliance (5.1.1) Contractor shall submit a list of references, detailing: Project Name, Final Client (the name and the contact details), Capacity/Power (MWh/MW), Execution Year (DD.MM.YYYY), COD Achieved (Yes/No), Main Contractors/subcontractors (DC Block, PCS, EMS/SCADA) and evidence confirming that the contracts listed in the list of references have been successfully executed. See the Annex No. 5, point A. \n\nEuropean Central PCS Manufacturer projects experience: Contractor has to ensure that has successfully performed at least one project that includes a Power Conversion System in accordance with European Union standards and manufactured in Europe. This requirement is crucial to ensure compliance with stringent certification and logistical processes, thereby guaranteeing adherence to the regulatory framework established by the EU. Contractors may also qualify if they provide a Non-European Central PCS and can provide comprehensive evidence that their systems are equivalent to those manufactured in Europe, meeting or exceeding all relevant European standards and certifications. This evidence must include detailed documentation of compliance with EU technical, safety, and environmental regulations. See point 5.3.3. \n\nTo evidence this requirement compliance (5.1.2) Contractor shall submit a list of references, at least one, detailing: Project Name, Final Client (the name and the contact details), Execution Year (DD.MM.YYYY), Regulatory Body (the name and the contact details), Manufacturer (the name and the contact details) and evidence confirming that the contracts listed in the list of references have been successfully executed. See the Annex No. 5, point B. \n\nO&M Services Available in Poland and/or Europe: The Contractor is required to have or ensure a local or regional O&M (Operations & Maintenance) presence confirming 24/7 monitoring. \n\nTo evidence this requirement compliance (5.1.3) Contractor shall submit a list of references, at least three, detailing: O&M Service Provider (the name and the contact details) , Location of Services, Monitoring Capabilities (24/7) (Yes/No), Basis for Resource Availability and evidence confirming that the contracts listed in the list of references have been successfully executed. See the Annex No. 5, point C.","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2025-06-25 15:59:26","modified_at":"2025-06-25 16:35:03","modified_by":null,"group_uuid":"2aacd92d-2fe4-461e-934a-b267c63f5fbd"},{"id":1578670,"description":"Economic and financial standing \n\nFinancial Standing / Creditworthiness: Confirms that the Contractor meets the specific financial thresholds and conditions outlined in the official tender documents; Protects against the risk of contractual non-fulfillment due to financial instability; Helps ensure the project remains viable and that bidders can manage the required upfront investment and performance guarantees; Minimizes the risk of project delays or failures due to insolvency or cash flow issues. \n\nI. Contract award may be sought by contractors who: \n\nHave at least one of the following credit ratings: (i) \u201cBaa3\u201d or higher by Moody\u2019s (if such entity is rated by Moody\u2019s), or (ii) \u201cBBB-\u201d or higher by S&P (if such entity is rated by S&P), or (iii) \u201cBBB-\u201d or higher by Fitch (if such entity is rated by Fitch). \n\nor \n\nHave a Net Tangible Assets value from the most recent audited financials, greater than the aggregate value of EUR 4.000.000 (four million Euro).\u202f\u202f \n\nand \n\nHave an invoiced/turnover (Parent Company or Company to sign the contract) value from the 2024 audited financials, greater than 1.000.000.000 USD (one billion United States dollars).\u202f\u202f \n\nII. Documents required to confirm that the conditions relating to economic and financial capacity are met: \n\nThe Contractor shall present the following documents to confirm the fulfilment of the conditions for participation in the contract award procedure, described in section 5.2.A, 5.2.B and 5.2.C above: \n\nFinancial statement or an appropriate part of the financial statement (i.e. at least the balance sheet and the profit and loss account) for the last 3 (three) financial years, and if the period of the Contractor's business activity is shorter - for that period, specifying the average annual turnover; if the financial statement is subject to audit by a certified auditor in accordance with the accounting regulations, an opinion on the audited statement or its part should also be attached; if the Contractors are not required to prepare financial statements, other documents specifying their average turnover should be submitted; \n\nor \n\nValid credit rating report or certificate issued by Moody\u2019s, S&P, or Fitch, confirming the credit rating.","type":{"id":5,"name":"Sytuacja ekonomiczna i finansowa"},"created_by":null,"created_at":"2025-06-25 15:59:26","modified_at":"2025-06-25 16:35:03","modified_by":null,"group_uuid":"6d81f34f-c4cd-4e48-b11b-4ca86e0759e9"},{"id":1578671,"description":"The Contractor has to be included in the Bloomberg\u2019s Tier 1 Energy Storage Manufacturers Q2 2025: Tier 1 Contractors in Bloomberg\u2019s ranking are recognized for strong bankability, financial health, and consistent product quality. This provides confidence that the Contractor is established, reliable, and low-risk, particularly for public or large-scale investments. Reduces the risk of technical or financial failure during or after project execution. Bloomberg criteria Tier 1 BESS are included in with the template constituting Annex no. 7 for Contractor reference and can be reviewed in the following website https://assets.bnef.com/public/tiering/batterymethodology. Official list can be consulted in: https://www.bnef.com/insights/33123. Contractors not listed in Bloomberg\u2019s Tier 1 may also qualify if they can demonstrate equivalence by providing comprehensive evidence of strong bankability, financial health, and consistent product quality that meets or exceeds the standards set by Bloomberg\u2019s Tier 1 criteria defined in Annex No 7 to this document. This evidence must include detailed financial reports, product quality certifications, and references from projects. See point 5.3.3. \n\nDDP (Incoterm 2023) (Delivered Duty Paid) mandatory: meaning the Contractor bears all transport, customs, taxes, and delivery risks up to the site in Poland. Contractors may propose equivalent delivery terms if they can demonstrate that these terms provide the same level of risk mitigation and cost coverage as DDP. Such proposals must include detailed documentation outlining how all transport, customs, taxes, and delivery risks will be managed and covered, ensuring no additional burden or risk to the client. See point \n\nOnly Contractors who meet the conditions for participation referred to in the Notice shall be admitted to further stages of the procedure. Assessment of the Contractors' fulfillment of the conditions for participation in the procedure shall be made on the basis of documents and statements provided along with the Request for participation. \n\nContractors who do not demonstrate meeting the conditions for participation or do not confirm that there are no grounds for their exclusion, shall be excluded from the procedure and shall not be invited to the next stage of the procedure. \n\nThe assessment of meeting the conditions for participation in the procedure shall be made on the basis of information contained in the required documents and statements, according to the formula: complies / does not comply. \n\nIn the case of Contractors jointly competing for the award of the contract, the requirements specified in section 5 shall be met, if they are met by at least one of the Contractors. \n\nIn the case of the Contractor relying on the resources of other entities in order to meet the conditions for participation in the procedure, a completed and signed Part II and Part III of Annex No. 5 must be submitted. \n\nIf the Contractor fails to submit statements or documents required from the Contractor in this Notice, or other documents necessary to conduct the procedure, the statements or documents are incomplete, contain errors or raise doubts indicated by the Contracting Authority, the Contracting Authority shall call upon the Contractor to submit, supplement or correct them or to provide explanations within the deadline indicated by it, unless, despite submitting, supplementing or correcting them or providing explanations, the Contractor is subject to exclusion or it would be necessary to revoke the conditions or invalidate the procedure. The Contracting Authority may request the Contractor to supplement the statements or documents in the above scope multiple times. Failure to supplement the documents indicated by the Contracting Authority within the prescribed period shall entitle the Contracting Authority to exclude the Contractor from the procedure without further notice. \n\nThe Contracting Authority always allows the possibility for the bidder to apply solutions equivalent to those indicated in the request for proposal. A bidder who decides to present equivalent solutions is obliged to prove that the solution or product they propose meets all the requirements specified in the request for proposal, in terms of the indicated parameters, which must be at a level no worse than those provided in the request for proposal. In cases where the request for proposal and its attachments contain any references to specific products, sources, trademarks, patents, origins, or particular processes characterizing the products or services provided by a specific contractor, it should be assumed that the Contracting Authority has provided such a description with the possibility of submitting equivalent offers. These offers must meet the required technical, operational, functional, and quality parameters at a level no worse than those provided in the request for proposal along with its attachments.","type":{"id":7,"name":"Dodatkowe warunki udzia\u0142u"},"created_by":null,"created_at":"2025-06-25 15:59:26","modified_at":"2025-06-25 16:35:03","modified_by":null,"group_uuid":"b365be01-ad48-4e1b-ac3a-9804019d1cf4"},{"id":1578672,"description":"List of documents required from the bidder: \n\nAnnex no. 1 \u2013 Request to participate \n\nAnnex no. 2 \u2013 Statement related to lack of grounds for exclusion \n\nAnnex no. 3 \u2013 Statement related to no grounds for conflict of interests with regard to other Contractors \n\nAnnex no. 4 \u2013 Statement related to no grounds for conflict of interests with respect to Contacting Authority \n\nAnnex no. 5 \u2013 List of projects meet the terms and conditions for participation with required attachments \n\nAnnex no. 6 \u2013 Signed NDA \n\nAnnex no. 7 - Bloomberg criteria Tier 1 BESS \n\nDocuments required to confirm that the conditions relating to economic and financial capacity are met \n\nCurrent excerpt from the relevant register or from Central Registration and Information on Business, if separate regulations require entry in the register, issued not earlier than 6 months before the deadline for submission of Requests to participate in the contract award procedure or documents for foreign entities as stated in point 5.2. \n\nPower of attorney, if applicable.","type":{"id":6,"name":"Lista wymaganych dokument\u00f3w/o\u015bwiadcze\u0144"},"created_by":null,"created_at":"2025-06-25 15:59:26","modified_at":"2025-06-25 16:35:03","modified_by":null,"group_uuid":"dfa84d3a-5b49-42af-8583-f179630d4c74"}],"category":{"id":3,"name":"Dostawa"},"subcategory":{"id":15,"name":"Dostawy inne"},"created_by":null,"created_at":"2025-06-25 15:59:26","modified_at":"2025-06-25 16:35:03","modified_by":null,"group_uuid":"48febc3b-d451-40d0-b41f-ef26e79b30fd"}],"evaluation_criteria":[{"id":885878,"price_criterion":false,"description":"The criteria will be included in the Request for Proposal, which will be provided to entities qualified for the next stage of the procedure, i.e. binding offer stage, as outlined in the Pre-qualification Phase described in this Notice.","created_by":null,"created_at":"2025-06-25 16:21:21","modified_at":"2025-06-25 16:35:03","modified_by":null,"group_uuid":"d3e04c6f-1867-481d-9f65-5a065ef34132"}],"is_variant":false,"title":"BESS Budzy\u0144 Project Procurement Pre-qualification Notice ","order_node":{"id":378943},"created_by":null,"created_at":"2025-06-25 15:59:26","modified_at":"2025-06-25 16:35:03","modified_by":null}],"created_by":{"id":99622,"contact_persons":[]},"modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":"Farma Fotowoltaiczna Budzyn sp. z o.o. ","identification_number_type":"nip","identification_number":"5213973120","address":{"country":"Polska","voivodeship":"mazowieckie","poviat":"Warszawa","commune":"Ochota","locality":"Warszawa","created_by":null,"created_at":null,"modified_at":null,"modified_by":null,"id":860421,"street":"Aleje Jerozolimskie","number_description":"98","postcode":"00-807"},"created_by":{"id":99622,"contact_persons":[]},"created_at":"2025-06-25 15:59:25","modified_at":"2025-06-25 15:59:25","modified_by":{"id":99622,"contact_persons":[]},"id":309813},"advertisement":{"id":234538,"number":"2025-99622-234538","publication_date":"2025-06-25","created_by":{"id":99622,"contact_persons":[]},"created_at":"2025-06-25 15:59:25","modified_at":"2025-07-10 12:00:03","modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":6,"label":"RESOLVED","name":"Rozstrzygni\u0119te"},"all_available_version_ids":[308978],"enrollment":{"id":61639,"name":"Budowa bateryjnego magazynu energii elektrycznej w miejscowo\u015bci Budzy\u0144 realizowana przez Farm\u0119 Fotowoltaiczn\u0105 Budzy\u0144 sp. z o.o.","number":"001/27","activity":{"created_by":null,"created_at":"2020-08-17 19:00:00","modified_at":"2020-08-17 19:00:00","modified_by":null},"region":{"created_by":{"modified_by":null,"id":1,"contact_persons":[]},"created_at":"2022-02-10 21:45:45","modified_at":"2022-02-10 21:45:45","modified_by":{"modified_by":null,"id":1,"contact_persons":[]}},"institution":null,"full_number":"POPT.21.27.00-IZ.00-00-001/27","perspective":{},"programme":{"created_by":null,"created_at":"2020-08-17 19:00:00","modified_at":"2020-08-17 19:00:00","modified_by":null},"priority":{"created_by":null,"created_at":"2020-08-17 19:00:00","modified_at":"2020-08-17 19:00:00","modified_by":null},"type":"enrollment","created_by":null,"created_at":"2025-06-25 16:31:07","modified_at":"2025-06-25 16:31:07","modified_by":null},"projects":[],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":308978,"publication_date":"2025-06-25"},"id":1908945,"name":"BESS Budzyn - BESS pre-Qualification","file":{"id":2124288,"name":"2025.06.25 BESS Budzyn - BESS pre-Qualification_Complete.pdf","created_at":"2025-06-25 15:58:31","created_by":{"forename":"Daniel","surname":"Pelayo Herdero"},"uri":"/api/files/2124288"},"group_uuid":"bdd0acdf-90d1-454b-a631-bd2303ae99e5"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}