{"status":"OK","data":{"advertisement":{"id":301459,"title":"Delivery of Energy plant","partial_offer_allowed":false,"publication_date":"2025-05-15","submission_deadline":"2025-05-26 23:59:59","planned_sign_date":null,"supplementary_orders":null,"terms_of_contract_change":"The Contracting Authority provides for the possibility of amending the provisions of the concluded contract in relation to the content of the tender offer on the basis of which the Supplier was selected, in the following scope:\n1) The necessity to introduce amendments shall result from amendments to contracts between the Contracting Authority and a party other than the Supplier, including another supplier or institution supervising the performance of the project under which the Contract is executed, while the amendment may concern only those provisions of the contract that shall be directly affected by the modifications, and the amendments shall not lead to an increase in the Supplier's remuneration.\n2) Due to a prolonged procedure for the selection of the Supplier in the procedure for the award of this contract, or due to other circumstances that could not have been foreseen beforehand, preventing the proper execution of the deliveries covered by the contract, it shall become necessary to amend the completion dates specified in the request for quotation or the contract.\n3) Amendments to the contract completion date shall be acceptable in cases of:\na) force majeure events preventing the delivery of the subject of the contract,\nb) circumstances that could not have been foreseen by the contracting parties despite the exercise of due diligence or reasons of formal and legal obstacles beyond the control of the contracting parties,\nc) delays at earlier stages of the project,\nd) delays in or changes to administrative or other institutions' decisions (decisions by public authorities, changes to the applicable provisions of law, awaiting previously unforeseen but necessary expert assessments, court rulings, etc.), beyond the control of the Contracting Authority and the Supplier, which the parties were unable to foresee despite exercising due diligence,\ne) performing the subject of the contract before the contractual completion date and obtaining the funds to pay the Supplier's remuneration at an earlier date by the Contracting Authority, \nf) a need to perform deliveries involving the partial replacement of delivered products or installations, an increase in current supplies, or the expansion of existing installations may arise during the performance of the subject of the contract. Such deliveries shall be necessary if a change of contractor would lead to the acquisition of materials with different technical properties, resulting in technical incompatibility or disproportionately large technical difficulties in the use and maintenance of these products or installations.,\ng) a need to perform additional deliveries, services, or construction works from the existing contractor, not covered by the basic order, may arise during the performance of the subject of the contract, provided that they have become necessary, and all of the conditions are met (according to point 9.6).\n4) Amendments to the remuneration of the Contractor shall be acceptable provided that:\na) the amendment does not lead to a change in the general nature of the contract, and\nb) the total value of the amendment is less than EUR 143 000,00 and less than 10% of the value of the order originally specified in the contract (in the case of request for quotation regarding delivery of the line / equipment).\n5) In the case the need to amend the contract is caused by circumstances that the Ordering party, acting with due diligence, could not have foreseen, amendments to the remuneration of the Contractor shall be acceptable provided that:\na) the amendment does not lead to a change in the general nature of the contract, and\nb) the value of the amendment does not exceed 50% of the value of the order specified originally in the contract signed with the selected Contractor.\n6) Amendments to the remuneration of the Contractor shall be acceptable in the case additional supplies from the current Contractor, not covered by the basic order become necessary, and the following conditions have been met:\na) the change of the current Contractor cannot be made for economic or technical reasons, in particular concerning the interchangeability or interoperability of equipment, services or installations ordered under the original order, and\nb) the change of the current Contractor would cause significant inconvenience or a significant increase in costs for the Ordering Party, and\nc) the value of the amendment does not exceed 50% of the order value specified originally in the contract signed with the selected Contractor.\nAll changes to the provisions of the contract shall be made in writing otherwise shall be null and void. The occurrence of any of the circumstances mentioned above to the extent that they affect the performance of the contract shall result in that the term of the contract may be extended/amended accordingly by the time required to duly complete its subject manner. Any delays/changes must be documented by relevant protocols signed by the Supplier and the Contracting Authority, based on which the parties shall agree upon new deadlines.","created_at":"2025-05-15 13:42:56","modified_at":"2025-05-27 00:00:45","contact_persons":[{"id":90983,"forename":"Piotr","surname":"Puhan","phone_number":"+48 601 662 073","email":"piotr.puhan3@inter.ikea.com","created_by":null,"created_at":"2025-07-21 20:44:55","modified_at":"2025-07-21 20:44:55","modified_by":null},{"id":92710,"forename":"Mariusz","surname":"Tomkowiak","phone_number":"+48 604 795 668","email":"mariusz.tomkowiak@inter.ikea.com","created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null}],"orders":[{"id":488877,"estimated_value":null,"order_items":[{"id":551292,"description":"Boiler/incineration system specification \n\na) Thermal oil heater type, design and efficiency\n\nBoiler type and efficiency\n-Boiler Type: Three-way pass thermal oil heaters are not accepted. Only a single-way pass radiation heater, followed by a set of convection heaters, is permitted.\n-Shell company heat transfer oil S2 will be used.\n-Boiler efficiency: Minimum 87%: The thermal efficiency of the thermal oil boiler shall be calculated based on the Lower Heating Value (LHV) of the fuel. Efficiency shall be verified using the indirect method, in accordance with internationally accepted engineering practices.\nAlthough EN 12952 primarily addresses water-tube steam boilers, EN 12952-15 shall be used as a reference standard for maintaining high heat transfer efficiency \u2013 particularly regarding the prevention of internal deposits and thermal degradation of heat transfer surfaces, which are also relevant for thermal oil systems.\nThe efficiency calculation shall include all significant losses, such as:\n-Flue gas losses,\n-Radiation and convection losses,\n-Unburned fuel or combustion inefficiencies (if applicable).\nThe Supplier shall submit, along with the offer, a detailed efficiency report demonstrating compliance with the quoted performance values under the specified design conditions.\n\nBoiler design\nDesign Standards and Pressure Equipment Compliance\nAll pressure equipment and assemblies falling within the scope of the Pressure Equipment Directive (PED) 2014/68/EU shall be designed, manufactured, and conformity-assessed in full compliance with the directive.\nSuch equipment shall:\n-Bear the CE marking\n-Be accompanied by a valid EU Declaration of Conformity,\n-Unless explicitly exempted by the PED.\nA recognized design and manufacturing code acceptable under the PED shall be applied, such as EN standards, AD 2000, TRD, depending on the nature and risk category of the equipment.\nIn addition, the thermal oil system shall be designed and constructed in accordance with DIN 4754, which defines the safety, operational, and design requirements for systems using organic heat transfer media. Pressure-retaining components of the thermal oil system shall meet the relevant requirements of AD 2000 or an equivalent standard approved under the PED.\nInstrumentation and Operational Supervision\nAll necessary components and equipment shall be equipped with appropriate instrumentation to ensure proper and safe operation without continuous supervision for a minimum period of 24 hours.\n\nb) Thermal Oil System and Heat Transfer\nThe Tenderer submits an offer for the full scope of the subject of the contract, considering Option 1, Option 2 or Option 1 and Option 2.\nDesign Capacity:\nOption 1: Maximum continuous output of 4 MW (in connection with Sifter/dryer 1,8 MW).\nOption 2: Maximum continuous output of 5 MW (in connection with Sifter/dryer 2,8 MW).\nThermal oil heater flue gas outlet temperature to be maximum 175 \u00b0C (after passing the combustion air preheating system).\nFlue Gas Parameters:\n\u2212Convection heater inlet temperature: maximum 800 \u00b0C,\n\u2212Thermal oil supply temperature: 280 \u00b0C,\n\u2212The flue gas speed at the convection heater must be indicated in the offer form.\nThermal oil to PB press:\n\u2212Transfer from the power plant pump room to the press secondary circuit shall be conducted via two speed-controlled transfer pumps, with one serving as a backup. \n\u2212Continuous PB Press: 2,2 MW.\n\u2212Thermal oil supply temperature: 280 \u00b0C.\n\u2212Thermal oil temperature difference at PB Press: 20 \u00b0C.\n\u2212Estimated piping pressure drop: 1,2 bar.\n\u2212Pressure difference at secondary circuit: 1,5 bar.\nThermal oil to sifter / dryer heating:\nOption 1: Sifter/dryer 1,8 MW (in connection with Boiler with maximum continuous output of 4 MW).\nOption 2: Sifter/dryer 2,8 MW (in connection with Boiler with maximum continuous output of 5 MW).\n\u2212Using the return oil from the PB press, the thermal oil pumps are to be located in the PB press secondary pump room.\n\u2212Thermal oil supply temperature: 260 \u00b0C.\n\u2212Thermal oil temperature difference: 26 \u00b0C.\n\u2212Estimated piping pressure drop: 1,2 bar.\n\u2212Pressure difference at heat exchanger: 1,5 bar.\nThermal oil connection for future installations:\nTwo supplementary connection points at the zero-pressure header has to be foreseen including valves.\n\u22122 x DN 80 (one for supply and the other for return).\n\u22122 x DN 65 (one for supply and the other for return).\n\nc) Fuel specification / Firing sources: \nThe system will be heated exclusively with wood dust sourced from furniture factories. The table below provides an analysis of the dust composition. Since wood dust from furniture factories will be used, it is essential to consider that Polish authorities require such systems to meet the same emission limits as those set for waste incineration plants.\nDust for dust burner: Operated as a multi-fuel burner using wood dust and light oil. \nMaximum Dust fractions: 100% < 1 mm, with 90% < 0.5 mm.\nGrate size: A grate firing system is not required.\nCombustion chamber design: The burner combustion chamber must be designed for a minimum retention time of 2 seconds at 850\u00b0C after the last air entry.\n\nd) Other requirements:\nThe subject of the contract includes as well: \n-Continuous Light-End Removal System.\n-Nitrogen Blanket System.\nPrimary and transfer thermal oil Pumps:\n-Maximum speed for primary and transfer pumps 1500rpm.\n-The pumps to be speed controlled. \n-Pump manufacturer: Allweiler or KSB. \nLeakage Monitoring System, including:\n-Bearing temperature monitoring.\n-Vibration monitoring.\n-Oil leak detection system.\nEmergency and control cooler:\n-To be an air-cooled system.\n-Minimum capacity 2 MW.\nHeat Exchanger Surface Cleaning System\nThe heat exchanger (convection heater and economizer sections) shall be equipped with an effective surface cleaning system to maintain thermal performance and minimize fouling. The system shall meet the following requirements:\n-Each convection heater and economizer shall be equipped with at least one soot blower for automated cleaning.\n-The cleaning medium shall be compressed air, generated from ambient air.\n-The system shall operate with a single air compressor and a compressed air dryer to ensure reliable cleaning performance.\n-A compressed air storage tank with a minimum volume of 16 m\u00b3 shall be provided to ensure sufficient air volume and pressure for cleaning cycles.\n\nFan Specifications\nCold Gas Fans:\nMaximum operating speed: 1500 rpm.\nHot Gas Fan (low dust load):\nIn contact with flue gas containing a dust load of < 10 mg/Nm\u00b3.\nMaximum operating speed: 1500 rpm.\nHot Gas Fan (high dust load):\nIn contact with flue gas containing a dust load of > 150 mg/Nm\u00b3.\nMaximum operating speed: 1000 rpm. Adequate wear protection.\nShall be equipped with adequate wear protection to ensure reliable long-term operation under abrasive conditions.\nExpansion and Fill and Drain Tank:\n-Design temperature: 300 \u00b0C. \n-Maximum allowable operating pressure: 0,5 barg.\n-Design pressure: 2 barg.\n-The expansion Tank minimum Volume: 5m\u00b3.\n-The Fill and drain Tank minimum Volume: 30 m\u00b3.\n\nDust Cleaning \u2013 Dry Sorption System:\nThe dry sorption system shall be designed for reliable and safe operation, ensuring effective dust and acid gas removal. The following key components and design criteria shall be met:\n-A spark separator shall be installed upstream of the bag filter to ensure effective spark interception, thereby protecting the filter media from thermal damage and fire risk.\nThe additive dosing system shall be a volumetric dosing system, suitable for dry sorbents. Big bag unloading station should be included in price. Additive storage silo with dosing unit should be priced as an option (point IVV of the Offer form) and will not be considered in the evaluation. \nThe system must be designed for continuous operation and easy maintenance, with safe handling of additives and effective integration into the overall flue gas treatment process.\nFire Detection System for the Thermal Oil Heater, consisting of:\n-Flue gas pressure and temperature transmitters to be installed after each convection heater section.\nFire Protection System:\n-Fire nozzles to be installed after each convection heater section and before the radiation heater.\n-The system will be operated manually in case of fire.\n","warranty_period":"24 months","cpv_items":[{"id":5129,"code":"42100000-0","name":"Maszyny do wytwarzania i wykorzystywania mocy mechanicznej"},{"id":5287,"code":"42160000-8","name":"Uk\u0142ady kot\u0142\u00f3w grzewczych"},{"id":5540,"code":"42914000-6","name":"Urz\u0105dzenia do recyklingu"},{"id":6292,"code":"44620000-2","name":"Grzejniki centralnego ogrzewania i kot\u0142y grzewcze, i ich cz\u0119\u015bci"},{"id":6298,"code":"44621200-1","name":"Kot\u0142y grzewcze"}],"timetable_items":[],"fulfillment_places":[{"country":"Polska","voivodeship":"lubuskie","poviat":"\u015bwiebodzi\u0144ski","commune":"Zb\u0105szynek","locality":"Chlastawa","created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"id":622985,"type":{"id":1,"name":"adres"},"group_uuid":"f6359cd3-3311-44c9-a75f-253a6b83769c"}],"participation_conditions":[{"id":1541001,"description":"Entitlement to carry out a specific activity or task\n\nOnly an entity that meets all of the following conditions jointly may apply for the award of the contract:\n1)\tActive business activity (in the case of domestic suppliers \u2013 active entry in the Central Registration and Information on Business (CEIDG) or the National Court Register (KRS)) and holding authority to conduct activities consisting in the sale of the subject of the request for quotation \u2013 verification based on the declaration an integral part of the tender offer.\n2)\tNo liquidation or bankruptcy has been opened against the Tenderer \u2013 verification based on the declaration constituting an integral part of the tender offer.\n3)\tNo personal or capital relations with the Contracting Authority \u2013 verification based on the declaration constituting an integral part of the tender offer.","type":{"id":1,"name":"Uprawnienia do wykonywania okre\u015blonej dzia\u0142alno\u015bci lub czynno\u015bci"},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"57a52f93-84d7-475a-a606-e67a605456d4"},{"id":1541002,"description":"Knowledge and experience\n\nOnly an entity that has the knowledge and experience to properly execute the contract may apply for the award of the contract. The fulfilment of the condition shall be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation). The Contracting Authority may require the Tenderer to provide additional documentations confirming compliance with this condition.\nThe bidder must have extensive experience in the wood panel industry, specifically in MDF/HDF, particle board, and OSB production. A comprehensive reference list of past projects must be provided. Supplier has to confirm that minimum 3 power plants in period of last 3 years was delivered, installed and commissioned by him to wood panel industries. If the company has been in existence for a shorter period, this requirement shall apply to that period.","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"afe502bb-d365-40d8-a878-f1c341845344"},{"id":1541003,"description":"Technical capacity\n\nOnly an entity which has the technical capacity to properly execute the contract may apply for the award of the contract. The fulfilment of the condition shall be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation).\nThe supplier shall ensure a minimum technical availability of minimum 92\u202f% per calendar year. The availability calculation period shall begin on the date of successful completion of the acceptance test (\"Commercial Operation Date\").\nPlant availability refers to the percentage of the total scheduled operating time during which the plant is technically capable of performing its intended function, excluding periods of planned maintenance.\nThe availability shall be calculated as follows:\n\nAvailability = (total scheduled operating hours-unplanned downtime hours)/total scheduled operating hours*100%\n\nTotal scheduled operating hours refer to all operating hours within a 12-month period, excluding a planned maintenance shutdown of up to 3 weeks per year.\nUnplanned downtime includes all outages due to technical failures, malfunctions, or safety-related shutdowns that are not part of the scheduled maintenance.\nThe Contracting Authority may request additional documents confirming the above during the offer evaluation process.","type":{"id":3,"name":"Potencja\u0142 techniczny"},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"d8978e56-2f14-4113-90ff-f79843c00f60"},{"id":1541004,"description":"Persons capable of performing the contract\n\nOnly an entity which has the human resources required for the proper execution of the contract may apply for the award of the contract. The fulfilment of the condition will be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation).","type":{"id":4,"name":"Osoby zdolne do wykonania zam\u00f3wienia"},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"28c58a92-f537-42c3-a996-2dbd42f46dbf"},{"id":1541005,"description":"Economic and financial situation\n\nOnly an entity that is in an economic and financial situation ensuring the proper execution of the full scope of the subject matter of the contract, including its timely execution, and that is not in bankruptcy or liquidation, and no bankruptcy or liquidation proceedings have been initiated against the Tenderer, may apply for the award of the contract. The fulfilment of the condition will be evaluated as fulfills/does not fulfil based on the declaration submitted by the Tenderer (Appendix no. 2 to the request for quotation).","type":{"id":5,"name":"Sytuacja ekonomiczna i finansowa"},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"a196931b-4474-4809-99c1-461dd4e77b76"},{"id":1541006,"description":"List of required documents\n\n1)\tTender offer form attached as Appendix no. 1 to the request for quotation.\n2)\tPower of attorney to sign the tender offer (if the authorization to sign the tender offer does not result from the registration documents),\n3)\tDeclaration confirming the fulfilment of the conditions of participation in the tender procedure constituting Appendix no. 2 to the request for quotation,\n4)\tService price list,\n5)\tEfficiency report,\n6)\tTechnical specification to prove compliance with the technical parameters specified in point 3 of the request for quotation (optional).","type":{"id":6,"name":"Lista wymaganych dokument\u00f3w/o\u015bwiadcze\u0144"},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"97b1093a-791a-4c9e-ac30-fc9118c58eec"}],"category":{"id":3,"name":"Dostawa"},"subcategory":{"id":15,"name":"Dostawy inne"},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"fa0fddb1-e194-4220-872b-f76cc7bbef39"}],"evaluation_criteria":[{"id":863941,"price_criterion":false,"description":"1. Fulfilment of the conditions for participation in the procedure set out in point 5 of Request for quotation.\n2. Submission of a tender offer by the deadline. \nFailure to meet the above criteria will result in the rejection of the tender offer. Criterion No. 1 may be supplemented.","created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"f38e8a84-0748-4e3a-83a1-653f66f8f72f"},{"id":863942,"price_criterion":false,"description":"1. The tender offer must comply with Point 2 of the Request for Quotation.\n2. Submission of all appendices as per Point 2.2.\n3. The scope of the contract offered is in accordance with the specified requirements. \nNon-compliance will result in rejection of the offer. Supplementation is permitted.","created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"5a21cd95-4463-463f-bd92-f91cf665e91d"},{"id":863943,"price_criterion":true,"description":"Order price\nNet order price \nWeight: 60%\nMethodology for awarding points: (price of the tender offer with the lowest net price among the evaluated tender offers / price indicated in the evaluated tender offer) x 100%","created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"47ca98b9-b69d-4a17-9efe-160f25a29b98"},{"id":863944,"price_criterion":false,"description":"Thermal Efficiency\nWeight: 25%\nMethodology for awarding points: (offered efficiency / maximum efficiency) x 25%","created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"875306cf-59fb-43f6-902f-3662ed63a067"},{"id":863945,"price_criterion":false,"description":"Electrical Power Consumption\nWeight: 15%\nMethodology for awarding points: (lowest power consumption / offered power consumption) x 15%","created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null,"group_uuid":"4ca2f6fe-d641-492d-9f1b-49f9b326f0ea"}],"is_variant":true,"title":"Delivery of energy plant","order_node":{"id":364722},"created_by":null,"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":null}],"created_by":{"id":92296,"contact_persons":[]},"modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":"IKEA Industry Poland sp. z o.o.","identification_number_type":"nip","identification_number":"5432163817","address":{"country":"Polska","voivodeship":"lubuskie","poviat":"\u015bwiebodzi\u0144ski","commune":"Zb\u0105szynek","locality":"Chlastawa","created_by":{"id":92296,"contact_persons":[]},"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":{"id":92296,"contact_persons":[]},"id":838341,"street":"Chlastawa","number_description":"17","postcode":"66-210"},"created_by":{"id":92296,"contact_persons":[]},"created_at":"2025-05-15 13:42:56","modified_at":"2025-05-15 13:42:56","modified_by":{"id":92296,"contact_persons":[]},"id":302267},"advertisement":{"id":225250,"number":"2025-92296-225250","publication_date":"2025-04-18","created_by":{"id":92296,"contact_persons":[]},"created_at":"2025-04-17 13:22:21","modified_at":"2025-05-27 00:00:45","modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":6,"label":"RESOLVED","name":"Rozstrzygni\u0119te"},"all_available_version_ids":[296743,301459],"enrollment":null,"projects":[{"id":58263,"name":"Budowa innowacyjnej linii technologicznej do produkcji p\u0142yty wi\u00f3rowej z odpadu poprodukcyjnego o kodzie 03 01 05 w IKEA Industry Poland sp. z o.o. w celu optymalizacji zu\u017cycia surowca drzewnego","number":"0048/24","activity":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-21 08:25:21","modified_at":"2023-02-21 08:25:21","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"region":null,"institution":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-21 08:42:46","modified_at":"2023-02-21 08:42:46","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"full_number":"FENX.01.04-IW.01-0048/24","perspective":{},"programme":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-21 08:23:27","modified_at":"2023-02-21 08:23:27","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"priority":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-21 08:23:42","modified_at":"2023-02-21 08:23:42","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"type":"project","created_by":{"id":92296,"contact_persons":[]},"created_at":"2025-03-28 12:05:00","modified_at":"2025-03-28 12:05:00","modified_by":{"id":92296,"contact_persons":[]}}],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":296743,"publication_date":"2025-04-18"},"id":1783785,"name":"Za\u0142\u0105cznik nr 1 - formularz ofertowy","file":{"id":1986345,"name":"Appendix 1 to the Request for quotation_Energy plant.docx","created_at":"2025-05-15 13:42:56","created_by":{"forename":"Piotr","surname":"Puhan"},"uri":"/api/files/1986345"},"group_uuid":"ed532d4f-45e1-4aac-98de-01a63111a28e"},{"origin":{"id":296743,"publication_date":"2025-04-18"},"id":1783786,"name":"Za\u0142\u0105cznik nr 2 - o\u015bwiadczenia","file":{"id":1986349,"name":"Appendix 2 to the Request for quotation _Energy plant.docx","created_at":"2025-05-15 13:42:56","created_by":{"forename":"Piotr","surname":"Puhan"},"uri":"/api/files/1986349"},"group_uuid":"5ec76b14-2001-419d-ad76-3b35bd48988d"},{"origin":{"id":296743,"publication_date":"2025-04-18"},"id":1785378,"name":"Zapytanie ofertowe","file":{"id":1988086,"name":"Request for quotation_Energy plant.pdf","created_at":"2025-05-15 13:42:56","created_by":{"forename":"Piotr","surname":"Puhan"},"uri":"/api/files/1988086"},"group_uuid":"794ec99e-8941-4f9b-9aeb-294b00fce6a6"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}