{"status":"OK","data":{"advertisement":{"id":286279,"title":"The subject of the contract is validation of production process design.","partial_offer_allowed":false,"publication_date":"2025-02-26","submission_deadline":"2025-03-05 23:59:59","planned_sign_date":"2025-03-01","supplementary_orders":null,"terms_of_contract_change":"1.\tThe Parties allow for the possibility of amending the provisions of the Agreement in the event of the occurrence of at least one of the circumstances listed below, taking into account the conditions for their introduction indicated in the Agreement, i.e:\n1)\tchange of the scope of works, in the event of: \na)\toccurrence of the necessity to amend the scope of works of the Contractor in order to ensure the meeting of the Ordering Party\u2019s aims as referred to in RFQ, \nb)\toccurrence of external reasons beyond the control of the Ordering Party and the Contractor unforeseeable at the stage of placing the order resulting in the necessity to amend the scope of works;\n- in which case the Parties may amend the scope of works in the scope necessary for ensuring the performance of this Agreement in accordance with its purpose;\n2)\tchange of the time limits for the realisation, in the event of:\na)\toccurrence of external reasons beyond the control of the Ordering Party or the Contractor resulting in the impossibility of meeting the original deadlines under the Agreement (in particular: occurrence of force majeure event);\nb)\tnecessity to change the project schedule by the Ordering Party, in particular in case of Ordering Party\u2019s delay in the implementation of the project this Agreement constitutes the part of, which may occur for example due to delays in obtaining the co-financement for this project; \nc)\tchange of the scope of works in cases enlisted in item 1) above;\n- in which case the Parties may amend the time limits for the realisation of particular Stages or their duration in the scope necessary to adjust them to the circumstances referred to above; \n3)\tchange of the Contractor's remuneration, in the event of the change of the scope of works referred to in item 1) above, if it is shown that such change influence the costs of the Contractor related with the performance of this Agreement. \n2.\tAmendments to the Agreement referred to in paragraph 1 shall be possible only if the circumstances justifying them are documented. The Contractor shall in particular properly justify and document the influence of any circumstances referred to above on its remuneration and time limits for the completion of particular stages of the Agreement. At the request of the Ordering Party, the Contractor is obliged to provide all additional data, explanations, calculations or information to support his request to amend the Agreement.\n3.\tThe cases referred to in paragraph 1 contain a catalogue of amendments to which the Ordering Party may give its consent, but do not at the same time constitute an obligation to give such consent.\n4.\tThe amendments to the Agreement in other cases than indicated in point 6.1. above may be introduced only under the condition that they are admissible to be introduced under section 3.2.4 The contract agreement, Subsection 3.2 Principle of competition of the Guidelines for eligibility of expenditure for 2021-2027. For the avoidance of doubt, the fact that particular amendments to the Agreement may be allowed on basis of this point, does not oblige the Ordering Party to agree any amendments to this Agreement.","created_at":"2025-02-26 11:27:44","modified_at":"2025-03-06 00:00:17","contact_persons":[{"id":48784,"forename":"Jagoda ","surname":"Celichowska","phone_number":"+48697949332","email":"zapytanie.projekt@solarisbus.com","created_by":null,"created_at":"2026-10-30 14:27:29","modified_at":"2026-10-30 14:27:29","modified_by":null}],"orders":[{"id":464714,"estimated_value":null,"order_items":[{"id":524373,"description":"\na.\tBrief description of the subject of the contract:\nThe contract concerns the validation, revision, and optimization of a factory design and master plan including product and material flow to support scalable bus production, ranging from 600 to over 1,200 units per year. The work will focus on defining space requirements, arrangement of particular objects and buildings, optimizing process flows, and ensuring compliance with relevant regulations. \n\nb.\tPurpose of the contract: \nThe aim of the contract is to support Solaris Bus&Coach in the preparation of solutions to launch a new production line for electric and hydrogen intercity buses. The objective will be achieved through the validation and development of a production process concept covering the areas of structural welding, painting, assembly and logistics, as well as the optimisation of the overall process.\n\nc.\tDetailed description of the subject of the contract:\nThe anticipated work includes validation of the design process carried out by Solaris Bus&Coach, which includes the used methodology, batch data and calculations, as well as evaluation and recommendation of existing concepts finalized to this date.\n\nThe design work and their results, which are the subject of validation, relate to:\n\u2022\tdetermination of the size, shape and mutual spatial arrangement of facilities on the area of the designated land,\n\u2022\tthe spatial flow of the process along with the logic and direction of the flow of products and materials,\n\u2022\tthe number, workload and projected capacities of individual preparation and assembly stations,\n\u2022\tdistribution of key work operations and critical infrastructure,\n\u2022\tvalidation of proved technology\n\u2022\tautomation possibilities.\nThe process includes, in particular: structural welding, main assembly process, painting, warehousing and internal logistics. The products are battery and hydrogen powered intercity buses, which come in 4 length variants.\n\nThe order is divided into 2 stages:\nI.\tStage I: \nRevision of the factory design and confirmation of required property size\n\uf0a7\tDefinition and concept for the realization of the flexibility/extension strategy -> 600 to 1.200+ buses per year (maximum of 2 shifts)\n\uf0a7\tEnsuring the completeness of primary and secondary function in each shop and logistics\n\uf0a7\tConfirmation or revision of the shop sizes and production-related infrastructure, revision of space requirements based on expert estimations\n\uf0a7\tEnsuring the completeness of primary and secondary on-site functions in the master plan design\n\uf0a7\tVerification and revision of the master plan layout variants \u2013 process-/material-/people flow, optimal building allocation, extension concept\nDuration of the stage: 4 weeks\nThe result of the stage I will be: validated flexibility and expansion strategy (roadmap for phased expansion, considering space, logistics and infrastructure needs), confirmed or revised shop sizes and space requirements, ensured completeness of all required functions in production shops, logistics, and supporting areas, A validated or revised factory master plan with confirmed shop sizes, layout, and expansion strategy, actionable recommendations for the next phase, focusing on shop-level design and logistics improvements.\n\nII.\tStage II:\nDetailed validation or optimisation of the shop designs.\n\uf0a7\tValidation and optimization of the process and material flow in each shop \n\uf0a7\tValidation of production line design, no. of workstations, material supply, drive- and walkways \n\uf0a7\tVerification of equipment, conveyor and production technology, automation level, headcount\n\uf0a7\tVerification and layout optimization, if required\n\uf0a7\tValidation and optimization of the logistics concept \u2013 including the functions inbound, outbound, warehousing, intra logistics, truck handling, if required \n\uf0a7\tVerification of transport and handling equipment, headcount\n\nDuration of the stage: 6 weeks\n\nThis phase will result in a fully optimized shop layout, ensuring efficient production, smooth material flow, and streamlined logistics. The production line design, number of workstations, and equipment placement will be validated and optimized to enhance workflow and minimize inefficiencies. Automation levels, workforce requirements, and transport equipment will be reviewed to ensure an optimal balance of technology and labor. Additionally, the inbound, outbound, warehousing, and intra-logistics processes will be refined to improve efficiency and reduce handling times. Safety, compliance, and regulatory requirements will be verified to mitigate risks and align with industry standards. The final outcome will include updated shop layouts, optimized process flows, and a comprehensive report with actionable recommendations for implementation.\n\nFor phases 1 and 2 we require (in total) a minimum of 15 days of presence, to the company's headquarters in Bolechowo.\n\nData and calculations provided by Ordering Party:\n\uf0a7\tProduct visualizations, product concept with main components and 3D model.\n\uf0a7\tThe main technologies that will be used.\n\uf0a7\tHeadcount, efficiency, distribution of main tasks, production times, areas currently occupied by assembly and preparation stations, offices, sanitary facilities, warehouses - calculations collected from the current similar vehicle production process.\n\uf0a7\tpreliminary layout concept incl. 3 scenarios for the development and expansion of the factory in terms of capacity. \n\nd. CPV codes for the contract: \n\n73300000-5 \u2013 Design and implementation of research and development\n71621000-7 \u2013 Technical analysis or consultation services\n73220000-0 \u2013 Development consulting services \n71323200-0 - Project engineering services for manufactures\n\ne. Term of the contract: \n\uf0d8\tplanned starting date: 17.03.2025 \n\uf0d8\tplanned completion date: no longer than 30.06.2025 \n\nf. Tender validity period \u2212 at least 30 calendar from the day following the deadline of submission of tenders. At the request of the Ordering Party, the tenderers may be once required to extend the tender validity period by additional 60 days under pain of rejecting the tender. \n\ng. Partial tenders - The Ordering Party does not permit the submission of partial tenders. \n\nh. Variant tenders - The Ordering Party does not permit the submission of variant tenders. \n\ni. Subcontracting - The Ordering Party does not permit the possibility of subcontracting works to entities other than the Tender, i.e.: \nThe Ordering Party does not allow for the possibility of ordering (subcontracting) the whole or part of the contract to entities other than the Contractor in the form of subcontracting understood as transferring the responsibility for the performance of a part of the contract to third parties acting independently of the Contractor. However, it is permissible to perform the order with the assistance of persons employed by the Contractor under civil law contracts (e.g. B2B, commission agreements), provided that such persons act under the supervision and at the risk of the Contractor.\n\nEquilibrity\n\nWherever the object of the command is described with the trademarks, patents or origin, source or a specific process it is permitted to apply solutions equal to the described ones under condition that they would have the same or better technical and functional specifications and would not downgrade standards indicated in documentation.\n\nWherever the object of the command is described by reference to the standards, technical evaluations, specifications or technical reference systems it is permitted to apply solutions equal to the described ones. \n","warranty_period":"zgodnie z umow\u0105","cpv_items":[{"id":8151,"code":"71323200-0","name":"Projektowe us\u0142ugi in\u017cynieryjne w zakresie zak\u0142ad\u00f3w"},{"id":8237,"code":"71621000-7","name":"Us\u0142ugi w zakresie analizy lub konsultacji technicznej"},{"id":8520,"code":"73220000-0","name":"Us\u0142ugi doradcze w zakresie rozwoju"},{"id":8521,"code":"73300000-5","name":"Projekt i realizacja bada\u0144 oraz rozw\u00f3j"}],"timetable_items":[{"id":156136,"description":"I.\tStage I: \nRevision of the factory design and confirmation of required property size\n\uf0a7\tDefinition and concept for the realization of the flexibility/extension strategy -> 600 to 1.200+ buses per year (maximum of 2 shifts)\n\uf0a7\tEnsuring the completeness of primary and secondary function in each shop and logistics\n\uf0a7\tConfirmation or revision of the shop sizes and production-related infrastructure, revision of space requirements based on expert estimations\n\uf0a7\tEnsuring the completeness of primary and secondary on-site functions in the master plan design\n\uf0a7\tVerification and revision of the master plan layout variants \u2013 process-/material-/people flow, optimal building allocation, extension concept\n\nDuration of the stage: 4 weeks\n\nThe result of the stage I will be: validated flexibility and expansion strategy (roadmap for phased expansion, considering space, logistics and infrastructure needs), confirmed or revised shop sizes and space requirements, ensured completeness of all required functions in production shops, logistics, and supporting areas, A validated or revised factory master plan with confirmed shop sizes, layout, and expansion strategy, actionable recommendations for the next phase, focusing on shop-level design and logistics improvements.","start_at":"2025-03-17","end_at":"2025-04-14","partial_payment":true,"created_by":{"id":7175,"contact_persons":[]},"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":{"id":7175,"contact_persons":[]},"group_uuid":"93262285-89a9-4040-8ddf-4fb587b162fd"},{"id":156137,"description":"II.\tStage II:\nDetailed validation or optimisation of the shop designs.\n\uf0a7\tValidation and optimization of the process and material flow in each shop \n\uf0a7\tValidation of production line design, no. of workstations, material supply, drive- and walkways \n\uf0a7\tVerification of equipment, conveyor and production technology, automation level, headcount\n\uf0a7\tVerification and layout optimization, if required\n\uf0a7\tValidation and optimization of the logistics concept \u2013 including the functions inbound, outbound, warehousing, intra logistics, truck handling, if required \n\uf0a7\tVerification of transport and handling equipment, headcount\n\nDuration of the stage: 6 weeks\n\nThis phase will result in a fully optimized shop layout, ensuring efficient production, smooth material flow, and streamlined logistics. The production line design, number of workstations, and equipment placement will be validated and optimized to enhance workflow and minimize inefficiencies. Automation levels, workforce requirements, and transport equipment will be reviewed to ensure an optimal balance of technology and labor. Additionally, the inbound, outbound, warehousing, and intra-logistics processes will be refined to improve efficiency and reduce handling times. Safety, compliance, and regulatory requirements will be verified to mitigate risks and align with industry standards. The final outcome will include updated shop layouts, optimized process flows, and a comprehensive report with actionable recommendations for implementation.","start_at":"2025-04-30","end_at":"2026-06-12","partial_payment":true,"created_by":{"id":7175,"contact_persons":[]},"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":{"id":7175,"contact_persons":[]},"group_uuid":"9bfff20b-ecb4-4204-9899-a321fd11eb76"}],"fulfillment_places":[{"country":"Polska","voivodeship":"wielkopolskie","poviat":"pozna\u0144ski","commune":"Czerwonak","locality":"Bolechowo-Osiedle","created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"id":591858,"type":{"id":1,"name":"adres"},"group_uuid":"c3421aa2-d7a1-4809-b6e3-9c0f4736dee5"}],"participation_conditions":[{"id":1460255,"description":"1. The contractor has knowledge and experience:\nMinimum 10 years of experience in factory design, industrial planning, or production optimization and in this period it has a proven track record of more than 50 projects, including:\n\u2022\tat least 8 similar projects in bus manufacturing industry. \n\u2022\tat least 10 projects in the e-mobility (battery) sector\n\u2022\tat least 5 projects in H2 mobility (fuell cell) sector\n\u2022\tat least 10 project in the area of welding process, paint shops, automotive assembly processes, internal logistics (10 projects for each area).\n\nThe fulfilment of the conditions will be assessed by the declaration submitted by the Contractor Party, constituting Annex 3 to the Request for Proposal. \n\nAt the request of the Ordering Party, the contractor is obliged to present:\n1.\tThe list of documented declared experience, i.e. a summary of services/projects performed and documents. The documents referred to are references, bus manufacturers references or case studies demonstrating expertise in factory layout design, maximizing productivity and production efficiency by applied solutions.","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"ffe6b516-660c-423c-a47a-da4f78599e8a"},{"id":1460256,"description":"a.\tContractors/Suppliers who are personally or financially affiliated with the Ordering Party shall be subject to exclusion from the contract award procedure.\n\nCapital or personal relations shall mean mutual relations between the Ordering Party or persons authorized to enter into commitments on behalf of the Ordering Party or persons performing on behalf of the Ordering Party activities related to the preparation and implementation of procedures for selection of the contractor, or persons who may influence the result of the proceedings and the Contractor, in particular by: \n- participation in a partnership, as a partner in a civil law partnership or partnership; holding at least 10% of the shares, unless a lower threshold is required by law; or wasn\u2019t specified by the project managing authority; being a member of the supervisory or management body, acting as proxy;\n- being married or in a relationship of direct kinship in a straight line, consanguinity or affinity in the collateral line to the second degree, or being related by adoption, guardianship or custody, either cohabitation with the Contractor, its legal representative or members of the management or supervisory bodies of the Contractors applying for the award of the contract;\n\t- remaining in such a legal or factual relationship with the Contractor that there is reasonable doubt about impartiality or independence in connection with the procurement procedure.\n\nExcluded from participation in the contract award procedure shall be persons performing activities in the contract award procedure or who have been validly sentenced for an offence committed in connection with the contract award procedure, economic or trade-related offences or other offences committed for financial gain.\n\nCompliance with the criterion will be assessed on the basis of a declaration on lack of no capital or personal bonds \u2013 Annex 2 to the Request for Proposal.","type":{"id":7,"name":"Dodatkowe warunki udzia\u0142u"},"created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"4433cf45-276e-43b1-b02c-037f8d859fea"},{"id":1460257,"description":"1.\tOffer form;\n2.\tDeclaration on lack of personal or capital bonds;\n3.\tDeclaration of compliance with the conditions;\n4.\tInformation clause on personal data processing.","type":{"id":6,"name":"Lista wymaganych dokument\u00f3w/o\u015bwiadcze\u0144"},"created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"bb6a9274-08a5-4b7c-b1f8-5dd310ce1015"},{"id":1460272,"description":"Adequate human resources \u2013 the project team will consist of minimum 5 experts in site planning, facility design, conveying technology, logistics, project management.\n\nThe fulfilment of the conditions will be assessed by the declaration submitted by the Contractor Party, constituting Annex 3 to the Request for Proposal. \n\nAt the request of the Ordering Party, the contractor is obliged to present:\n\nThe list of the personnel assigned to perform the order.","type":{"id":4,"name":"Osoby zdolne do wykonania zam\u00f3wienia"},"created_by":null,"created_at":"2025-02-26 11:52:42","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"4dee6659-c82f-46d9-baaf-a6fab9af5af2"},{"id":1460273,"description":"Certification in relevant ISO standards:\n\u2022\tISO 9001 for quality management\n\u2022\tISO 45001 for occupational health and safety \n\nThe fulfilment of the conditions will be assessed by the declaration submitted by the Contractor Party, constituting Annex 3 to the Request for Proposal. \n\nAt the request of the Ordering Party, the contractor is obliged to present:\n\nRequired ISO certificates.","type":{"id":3,"name":"Potencja\u0142 techniczny"},"created_by":null,"created_at":"2025-02-26 11:52:42","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"81a970fb-a4be-400d-970a-90c258841b36"}],"category":{"id":1,"name":"Us\u0142uga"},"subcategory":{"id":8,"name":"Us\u0142ugi inne"},"created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"d2b59f0c-7471-4f29-8b9c-c98678b4c605"}],"evaluation_criteria":[{"id":815435,"price_criterion":true,"description":"Price - Criterion weight 65%, maximum number of points 65. \n\nP= (C min/C calculated)* P max \n\nP \u2013 number of points scored by the tendered \nC min \u2013 the lowest offered price \nC calculated \u2013 the price offered by the tenderer \nP max \u2013 maximum number of points available","created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"24016cf6-6886-482b-8def-109cc3b94074"},{"id":815436,"price_criterion":false,"description":"Other criteria of offer evaluation, criterion weight 5%, maximum number of points 5:\nPossession of an ISO 14001 environmental management standard certificate, issued by an accredited\ncertification body - 5 points","created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"6e49e963-6e02-4f93-b675-ed840bec47e0"},{"id":815437,"price_criterion":false,"description":"Other criteria of offer evaluation, criterion weight 5%, max. pts 5:\nUse of an approved and internally implemented policy on equal opportunities and non-discrimination (including for people with disabilities) - having a code of ethics, anti-discrim, procedures or an ISO 30415 certificate. - 5 pts.","created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"5bcb286e-084c-4dad-95a7-4f25fa194aa4"},{"id":815438,"price_criterion":false,"description":"The experience of Contractor's personnel designated to perform the contract \u2013 20%, max. of pts 20: \nEach member of the Contractor\u2019s personnel designated to perform the contract has completed: \nLess than 5 services \u2013 5 pts\n6-10 services - 10 pts\n11-15 services - 15 pts\nMore than 15 services - 20 pts","created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"7cf5efc9-2b39-4566-895b-9c1d2b4c9d96"},{"id":815439,"price_criterion":false,"description":"Other criteria of offer evaluation, criterion weight 5%, max. pts 5:\n\nAbility to provide digital simulations or 3D models for layout validation \u2013 5 points.","created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null,"group_uuid":"321bc524-2f87-4e0a-b135-7d323c2cd5fc"}],"is_variant":false,"title":"Validation of production process design.","order_node":{"id":352057},"created_by":null,"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 12:41:28","modified_by":null}],"created_by":{"id":7175,"contact_persons":[]},"modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":" Solaris Bus & Coach sp. z o.o. ","identification_number_type":"nip","identification_number":"5240015630","address":{"country":"Polska","voivodeship":"wielkopolskie","poviat":"pozna\u0144ski","commune":"Czerwonak","locality":"Bolechowo-Osiedle","created_by":{"id":7175,"contact_persons":[]},"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 11:27:44","modified_by":{"id":7175,"contact_persons":[]},"id":789688,"street":"ul. Obornicka","number_description":"46","postcode":"62-005"},"created_by":{"id":7175,"contact_persons":[]},"created_at":"2025-02-26 11:27:44","modified_at":"2025-02-26 11:27:44","modified_by":{"id":7175,"contact_persons":[]},"id":287025},"advertisement":{"id":217317,"number":"2025-7175-217317","publication_date":"2025-02-26","created_by":{"id":7175,"contact_persons":[]},"created_at":"2025-02-26 11:27:44","modified_at":"2025-03-06 00:00:17","modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":6,"label":"RESOLVED","name":"Rozstrzygni\u0119te"},"all_available_version_ids":[286279],"enrollment":null,"projects":[{"id":46385,"name":"Opracowanie innowacyjnej rodziny wodorowo-elektrycznych autobus\u00f3w Intercity","number":"A07U/24","activity":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:22:25","modified_at":"2023-02-01 09:22:25","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"region":null,"institution":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:27:55","modified_at":"2023-02-01 09:27:55","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"full_number":"FENG.01.01-IP.01-A07U/24","perspective":{},"programme":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:21:41","modified_at":"2023-02-01 09:21:41","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"priority":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:21:51","modified_at":"2023-02-01 09:21:51","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"type":"project","created_by":{"id":7175,"contact_persons":[]},"created_at":"2024-05-27 13:50:14","modified_at":"2024-05-27 13:50:14","modified_by":{"id":7175,"contact_persons":[]}}],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":286279,"publication_date":"2025-02-26"},"id":1675698,"name":"Request for quotation","file":{"id":1866401,"name":"Request for quotation_validation of production process_Final_26.02.2025.pdf","created_at":"2025-02-26 12:40:11","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1866401"},"group_uuid":"4740903c-141c-4778-b574-9ee150ae3567"},{"origin":{"id":286279,"publication_date":"2025-02-26"},"id":1675699,"name":"Annex no 1_Offer form","file":{"id":1866402,"name":"Annex no 1_Offer form_validation of production process.doc","created_at":"2025-02-26 12:40:28","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1866402"},"group_uuid":"3e2ddead-9ed9-4a98-9c50-47fffd71aa62"},{"origin":{"id":286279,"publication_date":"2025-02-26"},"id":1675700,"name":"Annex no 2_declaration on lack of capital or personal bonds","file":{"id":1866404,"name":"Annex no 2_Declaration on lack of capital or personal bonds.doc","created_at":"2025-02-26 12:40:37","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1866404"},"group_uuid":"e13dfe0b-6f72-4e56-820f-834b0b9b25de"},{"origin":{"id":286279,"publication_date":"2025-02-26"},"id":1675701,"name":"Annex no 3 Declaration of compliance","file":{"id":1866406,"name":"Annex no 3_Declaration of compliance with the conditions.doc","created_at":"2025-02-26 12:40:47","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1866406"},"group_uuid":"ac359a4d-7d90-49be-ba80-ea2cddce0726"},{"origin":{"id":286279,"publication_date":"2025-02-26"},"id":1675702,"name":"Annex no 4_Information clause on personal data processing","file":{"id":1866408,"name":"Annex no 4_Information clause on personal data processing.docx","created_at":"2025-02-26 12:41:03","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1866408"},"group_uuid":"6c0ac9a8-6d67-406b-a332-e8ca6003310a"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}