{"status":"OK","data":{"advertisement":{"id":252300,"title":"Dostawa fabrycznie nowego urz\u0105dzenia do nanoszenia cienkich warstw TCO (elektrody g\u00f3rnej) \u2013 1 szt - dla Roltec Sp. z o.o.","partial_offer_allowed":false,"publication_date":"2024-06-11","submission_deadline":"2024-07-11 23:59:59","planned_sign_date":"2024-07-01","supplementary_orders":null,"terms_of_contract_change":"1.\tUmowa zawarta w wyniku post\u0119powania wszcz\u0119tego na skutek niniejszego Zapytania ofertowego, mo\u017ce zosta\u0107 zmieniona w drodze aneksu do umowy, w formie pisemnej pod rygorem niewa\u017cno\u015bci, w nast\u0119puj\u0105cym zakresie i przypadkach: \n1)\tUmowa mo\u017ce zosta\u0107 zmieniona w sytuacji wyst\u0105pienia niemo\u017cliwych do przewidzenia okoliczno\u015bci. Poj\u0119cie to Zamawiaj\u0105cy b\u0119dzie interpretowa\u0142 w spos\u00f3b odpowiadaj\u0105cy postanowieniu pkt. 109 preambu\u0142y Dyrektywy Parlamentu Europejskiego i Rady 2014/24/UE z dnia 26 lutego 2014 r. w sprawie zam\u00f3wie\u0144 publicznych, uchylaj\u0105cej dyrektyw\u0119 2004/18/WE. W \u015bwietle tego postanowienia, \u201ePoj\u0119cie niemo\u017cliwych do przewidzenia okoliczno\u015bci odnosi si\u0119 do okoliczno\u015bci, kt\u00f3rych nie mo\u017cna by\u0142o przewidzie\u0107 pomimo odpowiednio starannego przygotowania pierwotnego post\u0119powania o udzielenie zam\u00f3wienia przez instytucj\u0119 zamawiaj\u0105c\u0105, z uwzgl\u0119dnieniem dost\u0119pnych jej \u015brodk\u00f3w, charakteru i cech tego konkretnego projektu, dobrych praktyk w danej dziedzinie oraz konieczno\u015bci zagwarantowania odpowiedniej relacji pomi\u0119dzy zasobami wykorzystanymi na przygotowanie post\u0119powania a jego przewidywaln\u0105 warto\u015bci\u0105. Nie mo\u017ce to jednak mie\u0107 zastosowania w sytuacjach, w kt\u00f3rych modyfikacja powoduje zmian\u0119 charakteru ca\u0142ego zam\u00f3wienia, na przyk\u0142ad przez zast\u0105pienie zamawianych rob\u00f3t budowlanych, dostaw lub us\u0142ug innym przedmiotem zam\u00f3wienia lub przez ca\u0142kowit\u0105 zmian\u0119 rodzaju zam\u00f3wienia (\u2026)\u201d.\nW takim przypadku, umowa zostanie zmieniona w ten spos\u00f3b, by mo\u017cliwe by\u0142o odwr\u00f3cenie lub naprawienie skutk\u00f3w wyst\u0105pienia niemo\u017cliwych do przewidzenia okoliczno\u015bci.\nW przypadku wyst\u0105pienia niemo\u017cliwych do przewidzenia okoliczno\u015bci, mo\u017cliwa jest tak\u017ce zmiana terminu dostawy oraz terminu realizacji umowy.\n2)\tUmowa mo\u017ce zosta\u0107 zmieniona w przypadku zmiany Wykonawcy, gdy wynika ona z sukcesji uniwersalnej lub cz\u0119\u015bciowej w prawa i obowi\u0105zki pierwotnego dostawcy, w wyniku restrukturyzacji, w tym przej\u0119cia, po\u0142\u0105czenia, nabycia lub upad\u0142o\u015bci, przez innego dostawc\u0119, kt\u00f3ry spe\u0142nia pierwotnie ustalone kryteria kwalifikacji podmiotowej, pod warunkiem, \u017ce nie poci\u0105ga to za sob\u0105 innych istotnych modyfikacji umowy i nie ma na celu obej\u015bcia zasad, wynikaj\u0105cych z niniejszego zapytania ofertowego, umowy o dofinansowanie zawartej z Polsk\u0105 Agencj\u0105 Wspierania Przedsi\u0119biorczo\u015bci oraz postanowie\u0144 Wytycznych.\n3)\tUmowa mo\u017ce zosta\u0107 zmieniona w przypadku, gdy zachodzi konieczno\u015b\u0107 przed\u0142u\u017cenia terminu wykonania zam\u00f3wienia lub terminu wykonania obowi\u0105zku wynikaj\u0105cego z umowy z powodu wyst\u0105pienia si\u0142y wy\u017cszej. Przez si\u0142\u0119 wy\u017csz\u0105 Zamawiaj\u0105cy b\u0119dzie rozumia\u0142 nieprzewidywaln\u0105, wyj\u0105tkow\u0105 sytuacj\u0119 lub takie zdarzenie b\u0119d\u0105ce poza kontrol\u0105 stron niniejszej Umowy, kt\u00f3re uniemo\u017cliwiaj\u0105 kt\u00f3rejkolwiek z nich wywi\u0105zanie si\u0119 ze swoich obowi\u0105zk\u00f3w na podstawie niniejszej Umowy, i kt\u00f3re nie by\u0142y wynikiem b\u0142\u0119du lub zaniedbania po ich stronie lub po stronie ich podwykonawc\u00f3w, i kt\u00f3rych nie mo\u017cna by\u0142o unikn\u0105\u0107 przez post\u0119powanie z odpowiedni\u0105 i uzasadnion\u0105 nale\u017cyt\u0105 staranno\u015bci\u0105. W takim wypadku, umowa zostanie wyd\u0142u\u017cona o czas trwania si\u0142y wy\u017cszej lub czas niezb\u0119dny do odwr\u00f3cenia skutk\u00f3w wyst\u0105pienia si\u0142y wy\u017cszej lub zostanie zmieniony termin wykonania obowi\u0105zku wynikaj\u0105cego z umowy, o czas trwania si\u0142y wy\u017cszej lub czas niezb\u0119dny do odwr\u00f3cenia skutk\u00f3w wyst\u0105pienia si\u0142y wy\u017cszej.\nW przypadku wyst\u0105pienia si\u0142y wy\u017cszej mo\u017cliwa jest tak\u017ce zmiana terminu dostawy oraz terminu realizacji umowy.\n4)\tUmowa mo\u017ce zosta\u0107 zmieniona w przypadku, gdy zachodzi konieczno\u015b\u0107 przed\u0142u\u017cenia terminu wykonania zam\u00f3wienia lub terminu wykonania obowi\u0105zku wynikaj\u0105cego z umowy z powodu dzia\u0142ania osoby lub os\u00f3b trzecich, za kt\u00f3rych nie ponosi odpowiedzialno\u015bci ani Wykonawca, ani Zamawiaj\u0105cy. W przypadku potwierdzenia przez Zamawiaj\u0105cego, \u017ce zi\u015bci\u0142 si\u0119 ten warunek, umowa zostanie wyd\u0142u\u017cona o czas niezb\u0119dny do odwr\u00f3cenia skutk\u00f3w dzia\u0142ania osoby lub os\u00f3b trzecich.\nW takim przypadku mo\u017cliwa jest tak\u017ce zmiana terminu dostawy oraz terminu realizacji umowy.\n5)\tUmowa mo\u017ce zosta\u0107 zmieniona w sytuacji, gdy dojdzie do zmiany powszechnie obowi\u0105zuj\u0105cych przepis\u00f3w prawa lub wprowadzenia nowych regulacji prawnych, maj\u0105cych wp\u0142yw na wykonanie niniejszej Umowy. W takim przypadku, umowa zostanie zmieniona w ten spos\u00f3b, by opowiada\u0142a obowi\u0105zuj\u0105cym regulacjom prawnym. W takim przypadku mo\u017cliwa jest tak\u017ce zmiana terminu realizacji umowy.\n6)\tMo\u017cliwa jest zmiana umowy z Wykonawca, gdy zmiany dotycz\u0105 realizacji dodatkowych dostaw lub us\u0142ug od dotychczasowego Wykonawcy, nieobj\u0119tych zam\u00f3wieniem podstawowym, o ile sta\u0142y si\u0119 niezb\u0119dne i zosta\u0142y spe\u0142nione \u0142\u0105cznie nast\u0119puj\u0105ce warunki:\n\u2022 zmiana dostawcy nie mo\u017ce zosta\u0107 dokonana z powod\u00f3w ekonomicznych lub technicznych, w szczeg\u00f3lno\u015bci dotycz\u0105cych zamienno\u015bci lub interoperacyjno\u015bci sprz\u0119tu, us\u0142ug lub instalacji, zam\u00f3wionych w ramach zam\u00f3wienia podstawowego,\n\u2022 zmiana dostawcy spowodowa\u0142aby istotn\u0105 niedogodno\u015b\u0107 lub znaczne zwi\u0119kszenie koszt\u00f3w dla zamawiaj\u0105cego,\n\u2022 warto\u015b\u0107 ka\u017cdej kolejnej zmiany nie przekracza 50% warto\u015bci zam\u00f3wienia okre\u015blonej pierwotnie w umowie.\n7)\tZmiana umowy mo\u017cliwa jest tak\u017ce w sytuacjach, wskazanych w Sekcji 3.2.4 Wytycznych.","created_at":"2024-06-11 23:28:12","modified_at":"2024-07-12 00:00:02","contact_persons":[{"id":10619,"forename":"Pawe\u0142","surname":"Urbaniak","phone_number":"607674801","email":"Pawel.Urbaniak@roltec.pl","created_by":null,"created_at":"2024-05-25 21:46:21","modified_at":"2024-05-25 21:46:21","modified_by":null}],"orders":[{"id":409336,"estimated_value":null,"order_items":[{"id":461512,"description":"1.\tPrzedmiotem zam\u00f3wienia jest dostawa fabrycznie nowego urz\u0105dzenia do nanoszenia cienkich warstw TCO (elektrody g\u00f3rnej) \u2013 1 szt.\n2.\tZamawiaj\u0105cy wskazuje, \u017ce nie dopuszcza sk\u0142adania ofert cz\u0119\u015bciowych \u2013 zamawiaj\u0105cy wskazuje, \u017ce z powod\u00f3w technicznych, ekonomicznych i organizacyjnych zam\u00f3wienie tworzy niepodzielno\u015b\u0107 ca\u0142o\u015b\u0107. Zamawiaj\u0105cy wskazuje, \u017ce przedmiotem zam\u00f3wienia jest jedno urz\u0105dzenie \u2013 w zwi\u0105zku z czym nie istnieje mo\u017cliwo\u015b\u0107 wydzielenia cz\u0119\u015bci zam\u00f3wienia.\nZamawiaj\u0105cy wskazuje, \u017ce ze wzgl\u0119du na szacowan\u0105 warto\u015b\u0107 zam\u00f3wienia oraz wymagania wobec wykonawc\u00f3w jest dost\u0119pne m.in. dla przedsi\u0119biorstw z sektora M\u015aP.\n3.\tZamawiaj\u0105cy nie dopuszcza dostawy urz\u0105dze\u0144, kt\u00f3re nie s\u0105 dopuszczone do obrotu na obszarze Unii Europejskiej.\nSzczeg\u00f3\u0142owy opis przedmiotu zam\u00f3wienia zawarty jest w tabeli w pkt III Zapytania ofertowego (plik PDF).\nSpos\u00f3b finansowania wydatku:\nPrzedmiot zam\u00f3wienia b\u0119dzie finansowany w formie leasingu operacyjnego lub leasingu finansowego lub innej formie finansowania w przypadku braku mo\u017cliwo\u015bci uzyskania finansowania w postaci leasingu.\nW zwi\u0105zku z powy\u017cszym w przypadku finansowania w postaci leasingu wybrany wykonawca zawrze umow\u0119 sprzeda\u017cy z podmiotem finansuj\u0105cym, na warunkach okre\u015blonych w niniejszym zapytaniu oraz z\u0142o\u017conej ofercie, za\u015b podmiot finansuj\u0105cy \u2013 na podstawie umowy leasingu \u2013 odda Zamawiaj\u0105cemu do u\u017cywania przedmiot zam\u00f3wienia.\nZamawiaj\u0105cy przewiduje nast\u0119puj\u0105ce p\u0142atno\u015bci cz\u0119\u015bciowe:\n- 20% ceny, w formie zaliczki, p\u0142atnej w terminie do 14 dni od dnia podpisania umowy; Zamawiaj\u0105cy dopuszcza skr\u00f3cenie terminu zap\u0142aty zaliczki;\n- 20% ceny w terminie do 14 dni po zatwierdzeniu przez Zamawiaj\u0105cego parametr\u00f3w urz\u0105dzenia (design freeze). \n- 50% ceny p\u0142atne w ci\u0105gu pi\u0119tnastu (15) dni po pomy\u015blnym zako\u0144czeniu wst\u0119pnych test\u00f3w akceptacyjnych (PAT) przed dostaw\u0105 urz\u0105dzenia w zak\u0142adzie Wykonawcy i po wystawieniu przez Wykonawc\u0119 faktury - najp\u00f3\u017aniej na jeden (1) tydzie\u0144 przed planowan\u0105 wysy\u0142k\u0105 urz\u0105dzenia lub na podstawie o\u015bwiadczenia Wykonawcy o gotowo\u015bci do wysy\u0142ki i przedstawieniu protoko\u0142u PAT SYSTEMU w przypadku op\u00f3\u017anienia dostawy z przyczyn le\u017c\u0105cych po stronie Zamawiaj\u0105cego.\n- 10% ceny p\u0142atne w ci\u0105gu pi\u0119tnastu (15) dni po pomy\u015blnym zako\u0144czeniu ko\u0144cowych test\u00f3w akceptacyjnych FAT urz\u0105dzenia w zak\u0142adzie Zamawiaj\u0105cego, po przedstawieniu przez Wykonawc\u0119 protoko\u0142u FAT i wystawieniu faktury, jednak najp\u00f3\u017aniej sze\u015b\u0107 (6) miesi\u0119cy od daty gotowo\u015bci do wysy\u0142ki (w tym przedstawienia protoko\u0142u PAT) urz\u0105dzenia w siedzibie Wykonawcy w przypadku, gdy dostawa i/lub monta\u017c i/lub uruchomienie i/lub ko\u0144cowy test akceptacyjny FAT SYSTEMU uleg\u0142yby op\u00f3\u017anieniu z przyczyn le\u017c\u0105cych po stronie Zamawiaj\u0105cego.\nZamawiaj\u0105cy dopuszcza w umowie z Wykonawc\u0105 postanowienie, na mocy kt\u00f3rego Wykonawca zachowuje prawo w\u0142asno\u015bci urz\u0105dzenia do czasu uiszczenia przez Zamawiaj\u0105cego ca\u0142o\u015bci wynagrodzenia.\n\n\n1.\tThe subject of the order is the delivery of a brand new device for applying thin TCO layers (upper electrode) - 1 pc.\n2.\tThe Ordering Party indicates that it does not allow the submission of partial offers - the ordering party indicates that for technical, economic and organizational reasons, the order constitutes an indivisible whole. The Ordering Party indicates that the subject of the order is one device - therefore it is not possible to separate parts of the order.\nThe Ordering Party indicates that due to the estimated value of the order and requirements towards contractors, the following is available: for enterprises from the SME sector.\n3.\tThe Ordering Party does not allow the delivery of devices that are not approved for trading in the European Union.\nA detailed description of the subject of the order is included in the table in point III of the Request for Quotation (PDF file).\nDevice financing method:\nThe Subject of the Order will be financed in the form of operational leasing or financial leasing or another form of financing if it is impossible to obtain financing in the form of leasing.\nTherefore, in the case of financing in the form of leasing, the selected contractor will conclude a sales agreement with the financing entity, on the terms specified in this inquiry and the submitted offer, and the financing entity - based on the leasing agreement - will provide the Ordering Party with the subject of the order for use.\nThe Ordering Party provides for the following partial payments:\n- 20% of the price, in the form of an advance payment, payable within 14 days from the date of signing the contract; The Ordering Party allows the deadline for the advance payment to be shortened;\n- 20% of the price within 14 days after the Ordering Party approves the device parameters (design freeze). \n- 50% of the price payable within fifteen (15) days after successful completion of preliminary acceptance tests (PAT) prior to delivery of the device at the Contractor's plant and upon issuance of an invoice by the Contractor - no later than one (1) week before the scheduled shipment of the device or based on the Contractor's declaration about readiness for shipment and presentation of the PAT protocol of the device in the event of a delivery delay due to reasons attributable to the Ordering Party.\n- 10% of the price payable within fifteen (15) days after successful completion of the final FAT acceptance tests of the device at the Ordering Party's plant, after the Contractor has presented the FAT protocol and issued an invoice, but no later than six (6) months from the date of readiness for shipment (including presentation PAT protocol) of the device at the Contractor's premises in the event that the delivery and/or assembly and/or commissioning and/or final FAT acceptance test of the device would be delayed for reasons attributable to the Ordering Party.\nThe Ordering Party allows for a provision in the contract with the Contractor under which the Contractor retains ownership of the device until the Ordering Party pays the entire remuneration.\n","warranty_period":"Minimum 24 miesi\u0105ce","cpv_items":[{"id":5128,"code":"42000000-6","name":"Maszyny przemys\u0142owe"},{"id":5672,"code":"42997300-4","name":"Roboty przemys\u0142owe"},{"id":7177,"code":"48150000-4","name":"Pakiety oprogramowania do kontroli przemys\u0142owej"}],"timetable_items":[{"id":139237,"description":"1.\tObowi\u0105zkiem Wykonawcy jest dokonanie dostawy urz\u0105dzenia obj\u0119tego niniejszym Zam\u00f3wieniem w terminie do 8 miesi\u0119cy od dnia zawarcia umowy z Zamawiaj\u0105cym oraz rozpocz\u0119cie jego monta\u017cu w zak\u0142adzie Zamawiaj\u0105cego.\n2.\tObowi\u0105zkiem Wykonawcy jest dokonanie monta\u017cu i uruchomienia urz\u0105dzenia obj\u0119tego niniejszym Zam\u00f3wieniem w terminie do 10 miesi\u0119cy od dnia zawarcia umowy z Zamawiaj\u0105cym.\n\n1.\tThe Contractor's must deliver the device covered by this Order within 8 months from the date of concluding the contract with the Ordering Party and to start its assembly at the Ordering Party's plant.\n2.\tThe Contractor's must install and commission the device covered by this Order within 10 months from the date of concluding the contract with the Ordering Party.","start_at":"2024-07-22","end_at":"2025-05-22","partial_payment":true,"created_by":{"id":10835,"contact_persons":[]},"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":{"id":10835,"contact_persons":[]},"group_uuid":"2563ea40-4deb-4fad-bb34-1cde98a63f5b"}],"fulfillment_places":[{"country":"Polska","voivodeship":"dolno\u015bl\u0105skie","poviat":"Wroc\u0142aw","commune":"Wroc\u0142aw-Fabryczna","locality":"Wroc\u0142aw","created_by":null,"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":null,"id":518672,"type":{"id":1,"name":"adres"},"group_uuid":"feebcaff-85e1-4f14-80b5-a966ffc57ed9"}],"participation_conditions":[{"id":1269743,"description":"Zamawiaj\u0105cy wskazuje, \u017ce o udzielenie zam\u00f3wienia mo\u017ce ubiega\u0107 si\u0119 Wykonawca, kt\u00f3ry spe\u0142nia warunek do\u015bwiadczenia.\nWarunek zostanie uznany za spe\u0142niony, je\u017celi Wykonawca w okresie ostatnich trzech lat przed up\u0142ywem terminu sk\u0142adania ofert (a w przypadku, gdy Wykonawca prowadzi dzia\u0142alno\u015b\u0107 gospodarcz\u0105 kr\u00f3cej \u2013 w okresie prowadzenia dzia\u0142alno\u015bci gospodarczej) wykona\u0142 co najmniej trzy dostawy maszyn lub urz\u0105dze\u0144 do nanoszenia warstw na substraty szklane, w warunkach pr\u00f3\u017cniowych. Zamawiaj\u0105cy wskazuje, \u017ce minimalna warto\u015b\u0107 ka\u017cdej dostawy musi by\u0107 wy\u017csza ni\u017c 1.000.000,00 EUR.\nPrzez nale\u017cyte wykonanie dostaw Zamawiaj\u0105cy rozumie taki spos\u00f3b wykonywania zam\u00f3wienia, kt\u00f3ry doprowadzi\u0142 do wydania przez zamawiaj\u0105cego referencji lub protoko\u0142u odbioru z klauzul\u0105 wskazuj\u0105c\u0105 na prawid\u0142owe wykonanie zam\u00f3wienia.\nWraz z ofert\u0105, Wykonawca musi przedstawi\u0107 dowody w postaci dokument\u00f3w (np. w postaci referencji lub protoko\u0142\u00f3w odbioru lub faktur z dowodem ich op\u0142acenia, lub innych r\u00f3wnowa\u017cnych dokument\u00f3w), potwierdzaj\u0105cych spe\u0142nienie warunku do\u015bwiadczenia. Przed\u0142o\u017cone dowody musz\u0105 jednoznacznie potwierdza\u0107 spe\u0142nienie ustanowionego warunku do\u015bwiadczenia. \nOferty, do kt\u00f3rych nie zostan\u0105 do\u0142\u0105czone dowody, potwierdzaj\u0105ce posiadanie wymaganego do\u015bwiadczenia, zostan\u0105 odrzucone bez wezwania do uzupe\u0142nienia lub wyja\u015bnie\u0144.\n\nThe Ordering Party indicates that a Contractor who meets the experience requirement may apply for the contract.\nThe condition will be considered met if the Contractor has duly performed at least three deliveries of machines or devices for applying layers on glass substrates under vacuum conditions in the last three years before the deadline for submitting offers (and if the Contractor has been running a business for a shorter period - during the period of running the business). The Ordering Party indicates that the minimum value of each delivery must be higher than EUR 1 000,000.00 (one million EUR).\nDuly performed delivery means a situation in which the purchaser of the device has issued the Contractor with references or an acceptance report with a clause indicating the proper execution of the order. Together with the offer, the Contractor must present documentary evidence (e.g. in the form of references or acceptance reports or invoices with proof of payment, or other equivalent documents) confirming the fulfillment of the experience condition. The evidence submitted must clearly confirm that the established experience condition has been met. \nOffers that are not accompanied by evidence confirming the required experience will be rejected without a request for supplementation or explanation.","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":null,"group_uuid":"3d18e518-a3b2-47f6-b367-356fcc542e6f"}],"category":{"id":3,"name":"Dostawa"},"subcategory":{"id":15,"name":"Dostawy inne"},"created_by":null,"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":null,"group_uuid":"cbfc1a68-b29f-4cf7-b83b-942fbb0226d3"}],"evaluation_criteria":[{"id":705265,"price_criterion":true,"description":"1.\tCena netto (waga 70%) - Net price (weight 70%)\nPunkty za kryterium \u201ecena netto\u201d zostan\u0105 obliczone wg nast\u0119puj\u0105cego wzoru: \n\n Cena netto oferty najta\u0144szej \n\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014\u2014 x 70 = ilo\u015b\u0107 punkt\u00f3w \n Cena netto oferty badanej","created_by":null,"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":null,"group_uuid":"2408c568-365d-40d0-8c23-288f08275c17"},{"id":705266,"price_criterion":false,"description":"2.\tGwarancja (waga 20%)\nWarranty (weight 20%)\nZasady oceny kryterium opisane w zapytaniu ofertowym (plik PDF)\nRules for assessing the criterion described in the request for quotation (PDF file)","created_by":null,"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":null,"group_uuid":"68987e64-61f6-4d05-a4bd-89b7db77477a"},{"id":705267,"price_criterion":false,"description":"3.\tCzas reakcji serwisu (waga 10%)-Service response time (weight 10%)\nZasady oceny kryterium opisane w zapytaniu ofertowym (plik PDF)\nRules for assessing the criterion described in the request for quotation (PDF file)","created_by":null,"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":null,"group_uuid":"51e71f6b-93eb-412f-8f74-71e8ff4fc3c2"}],"is_variant":false,"title":"Dostawa urz\u0105dzenia do nanoszenia cienkich warstw TCO","order_node":{"id":310120},"created_by":null,"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:34:53","modified_by":null}],"created_by":{"id":10835,"contact_persons":[]},"modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":"ROLTEC sp. z o. o.\t","identification_number_type":"nip","identification_number":"8952026494","address":{"country":"Polska","voivodeship":"wielkopolskie","poviat":"Pozna\u0144","commune":"Pozna\u0144-Stare Miasto","locality":"Pozna\u0144","created_by":null,"created_at":null,"modified_at":null,"modified_by":null,"id":678304,"street":"\u015awi\u0119ty Marcin ","number_description":"29 lok. 8","postcode":"61-806"},"created_by":{"id":10835,"contact_persons":[]},"created_at":"2024-06-11 23:28:12","modified_at":"2024-06-11 23:28:12","modified_by":{"id":10835,"contact_persons":[]},"id":252850},"advertisement":{"id":191629,"number":"2024-10835-191629","publication_date":"2024-06-11","created_by":{"id":10835,"contact_persons":[]},"created_at":"2024-06-11 23:28:12","modified_at":"2024-07-12 00:00:02","modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":3,"label":"CLOSED","name":"Zamkni\u0119te"},"all_available_version_ids":[252300],"enrollment":null,"projects":[{"id":46176,"name":"Opracowanie technologii i stworzenie pilota\u017cowej linii do strukturyzacji laserowej po\u0142\u0105cze\u0144 w mikroskali cienkowarstwowych ogniw fotowoltaicznych na du\u017cych formatach pod\u0142o\u017cy CIGS oraz wdro\u017cenie w skal","number":"A03G/23","activity":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:22:25","modified_at":"2023-02-01 09:22:25","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"region":null,"institution":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:27:55","modified_at":"2023-02-01 09:27:55","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"full_number":"FENG.01.01-IP.01-A03G/23","perspective":{},"programme":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:21:41","modified_at":"2023-02-01 09:21:41","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"priority":{"created_by":{"modified_by":null,"id":89,"contact_persons":[]},"created_at":"2023-02-01 09:21:51","modified_at":"2023-02-01 09:21:51","modified_by":{"modified_by":null,"id":89,"contact_persons":[]}},"type":"project","created_by":{"id":10835,"contact_persons":[]},"created_at":"2024-05-21 12:21:49","modified_at":"2024-05-21 12:21:49","modified_by":{"id":10835,"contact_persons":[]}}],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":252300,"publication_date":"2024-06-11"},"id":1335377,"name":"Zapytanie ofertowe (j\u0119zyk polski)","file":{"id":1489397,"name":"Zapytanie ofertowe_pol_urz\u0105dzenia do nanoszenia cienkich warstw TCO_11.06.2024.pdf","created_at":"2024-06-11 23:33:15","created_by":{"forename":"Pawe\u0142","surname":"Urbaniak"},"uri":"/api/files/1489397"},"group_uuid":"0e08e75a-c983-438b-8016-5f936ead2390"},{"origin":{"id":252300,"publication_date":"2024-06-11"},"id":1335378,"name":"Formularz oferty (j\u0119zyk polski)","file":{"id":1489398,"name":"Formularz oferty_pol_11.06.2024.docx","created_at":"2024-06-11 23:33:29","created_by":{"forename":"Pawe\u0142","surname":"Urbaniak"},"uri":"/api/files/1489398"},"group_uuid":"b2a424d4-5a9b-4854-8244-7ee33aff7236"},{"origin":{"id":252300,"publication_date":"2024-06-11"},"id":1335379,"name":"Inquiry","file":{"id":1489399,"name":"Zapytanie ofertowe_ang_device for applying thin TCO layers_11.06.2024.pdf","created_at":"2024-06-11 23:34:04","created_by":{"forename":"Pawe\u0142","surname":"Urbaniak"},"uri":"/api/files/1489399"},"group_uuid":"df6d5c2b-f73f-482e-8aef-77bb1eb8393b"},{"origin":{"id":252300,"publication_date":"2024-06-11"},"id":1335380,"name":"Offer form","file":{"id":1489400,"name":"Formularz oferty_ang_11.06.2024.docx","created_at":"2024-06-11 23:34:29","created_by":{"forename":"Pawe\u0142","surname":"Urbaniak"},"uri":"/api/files/1489400"},"group_uuid":"350264ae-63dc-4e86-a0d8-89dde75c4c81"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}