{"status":"OK","data":{"advertisement":{"id":245603,"title":"Operational measurements of the nE12MD bus bodyframe structure and selection of tests on durability tracks.","partial_offer_allowed":false,"publication_date":"2024-03-20","submission_deadline":"2024-03-27 23:59:59","planned_sign_date":"2024-04-01","supplementary_orders":null,"terms_of_contract_change":"1. The Parties allow for the possibility of amending the provisions of the Agreement in relation to the content of the tender, on the basis of which the Contractor was selected, in the event of the occurrence of at least one of the circumstances listed below, taking into account the conditions for their introduction indicated in the Agreement, i.e.:\n1)\tchange of the deadline for realisation of the whole or part of the Subject of the Agreement - in the event of occurrence of external reasons beyond the control of the Ordering Party or the Contractor resulting in the impossibility of meeting the original deadlines under the Agreement, including those caused, among others, but not exclusively, by:\na.\tunforeseeable necessity to change the production schedule for the implementation of vehicle testing by the Ordering Party;\nb.\tunforeseeable at the stage of placing the order, necessity to change the scope of work, requiring more trials and tests\n- in which case the Parties shall accept another possibly short deadline for the execution of the Contract;\n2)\tchange of the Contractor's remuneration - if it is shown that the changes referred to in items 1 b will involve additional costs to be incurred by the Contractor, with the proviso that the change of remuneration may correspond exclusively to the costs which the Contractor has incurred or will have to incur in connection with such change.\n\n2. Amendments to the Agreement referred to in paragraph 1 shall be possible only if the circumstances justifying them are documented.\n\n3. The cases referred to in paragraph 1 contain a catalogue of amendments to which the Ordering Party may give its consent, but do not at the same time constitute an obligation to give such consent.\n\n4.\tThe Ordering Party allows amendments to the contract to be introduced on the terms provided for in section 3.2.4 The contract agreement, Subsection 3.2 Principle of competition, Guidelines for eligibility of expenditure for 2021-2027:\n\nIt is forbidden to change essential provisions of the concluded contract in relation to the content of the offer on the basis of which the contractor was selected, unless at least one from the following circumstances:\n1)\tchanges were provided for in the request for proposals in the form of unambiguous contractual provisions that define their scope and character and the conditions for introducing changes,\n2)\tchanges relate to the implementation of additional supplies, services or works from the existing contractor, not covered by the basic contract, if they have become necessary and all the following conditions have been met:\nI.\tchange of contractor cannot be made for economic or technical reasons, in particular concerning interchangeability or interoperability of equipment, services or installations, ordered under the basic contract,\nII.\ta change of contractor would cause substantial inconvenience or a significant increase in costs for the contracting authority\nIII.\tthe value of the changes does not exceed 50% of the value of the contract originally specified in the contract,\n3)\tthe change does not change the nature of the contract and the following conditions have been met:\nI.\tthe need to change the contract is due to circumstances that The Ordering Party, acting with due diligence, could not have foreseen;\nII.\tthe change value does not exceed 50% of the original order value agreement;\n4)\tthe contractor, which the Ordering Party has awarded the contract, is to replace the new contractor:\nI.\tas a result of the merger, division, transformation, bankruptcy, restructuring or acquisition of the existing contractor or its enterprise, provided that the new contractor meets the conditions for participation in the proceedings, there are no grounds for exclusion and this does not entail other significant changes to the contract , and it is not intended to avoid the application of the competitive principle, or\nII.\tas a result of the Ordering Party taking over the obligations of the contractor towards its subcontractors - In case of change of subcontractor, The ordering party may conclude an agreement with a new subcontractor without changing the terms and conditions of the contract, taking into account the payments made for the work performed so far\n5)\tthe change does not lead to a change in the overall nature of the contract, and the total value of the change is less than EUR 5,382,000 for construction works and EUR 140,000 for supplies and services, and at the same time is less than 10% of the contract value originally specified in the contract for service or supply contracts, or, for construction works contracts, is less than 15% of the contract value originally specified in the contract.\n\n5.\tThe change is considered significant if it changes the general nature of the contract, in relation to the nature of the contract in its original wording or does not change the general nature of the contract, and at least one of the following circumstances: the change introduces conditions that would have been placed in the contract award procedure , other contractors would take or would like to take part in this proceeding or would accept offers of other content, the amendment would violate the economic balance of the contract in favor of the contractor in a manner not initially provided for in the contract, the amendment significantly extends or reduces the scope of benefits and obligations under the contract or consists in replacing contractor, which the Employer has awarded the contract, a new contractor, in cases other than those mentioned in point 4. subpoint 4)","created_at":"2024-03-20 16:11:32","modified_at":"2024-03-28 00:00:03","contact_persons":[{"id":48784,"forename":"Jagoda ","surname":"Celichowska","phone_number":"+48697949332","email":"zapytanie.projekt@solarisbus.com","created_by":null,"created_at":"2026-10-29 12:28:48","modified_at":"2026-10-29 12:28:48","modified_by":null}],"orders":[{"id":398596,"estimated_value":null,"order_items":[{"id":449496,"description":"\nAmendment to the Request of Quotation \u2013 20.03.2024:\n3.\tPlace, date and term for submitting tenders:\na.\tDeadline for submission of tenders: \nIt was: 26.03.2024\nIt is: 27.03.2024\n\n4.\tDescription of the subject of the contract\na.\tDetailed description of the subject of the contract:\n\n1.\tSensors instalation:\nIt was: Sensor installation is planned from 15 April to 15 May 2024, at the Solaris factory: Obornicka 46, Bolechowo-Osiedle. A detailed date will be agreed with the selected contractor.\n\nIt is: Sensor installation is planned from 25 April to 26 May 2024, at the Solaris factory: Obornicka 46, Bolechowo-Osiedle. A detailed date will be agreed with the selected contractor.\n\n2.\tDescription of measurements\nIt was:\n\n2.1\tMeasurements will take place on a route specified by the client \u2013 TATRA TRACK (Are\u00e1l Tatry 1450/1, 74221 Kop\u0159ivnice, Czech Republic), in three states of load (vehicle empty, vehicle with occupied seats, vehicle full)\n2.2 The bus will be transported to the test track where signal measurements must be registered on various tracks. Each track must be registered at least 3 times for each load.\n\nBus available for measurements on the test track (TATRA) from 15 may 2024 (+/- 3 weeks). A detailed date will be agreed with the selected contractor.\n\nIt is:\n\n2.1 Measurements will take place on a route specified by the client \u2013 (Poznan area), in three states of load (vehicle empty, vehicle with occupied seats, vehicle full)\n2.2 The bus will be transported to the test track - TATRA TRACK (Are\u00e1l Tatry 1450/1, 74221 Kop\u0159ivnice, Czech Republic), where signal measurements must be registered on various tracks. Each track must be registered at least 3 times for each load.\n\nBus available for measurements on the test track (TATRA) from 27 may 2024 (+/- 3 weeks). A detailed date will be agreed with the selected contractor.\n\nThere are no amendements to the proceedings other than mentioned above.\n\n\n\n\nOperational measurements of the nE12MD bus bodyframe structure and selection of tests on durability tracks.\n\na.\tBrief description of the subject of the contract:\nThe subject of the contract are operational measurements of the nE12MD bus bodyframe structure and selection of tests on durability tracks.\n\nb.\tPurpose of the contract: \nDevelopment and verification of a zero-emission 12-meter electric bus with modular propulsion and batteries on the roof.\n\nc.\tDetailed description of the subject of the contract:\nSensor installation, performing measurements on the structure and selected elements of the suspension system. Signal registration during urban drives for 3 versions of vehicle load (empty, loaded seats, and full). Measurements on a test track outside the headquarters of Solarisbus & Coach and selection of a test schedule reflecting one million kilometers of urban driving.The measurements should include mean stresses resulting from: rooftop battery installation, passenger load.\n\nThe scope of the order includes:\n\n1.\tSensors instalation:\n1.1 Strain gauges\n\u2002\u2002\u2002\u2002\u200240 - unidirectional sensors\n 5 - strain gauge rosettes\n1.2 DC accelerometers - 4 pcs (registration in the range of 0-200Hz, minimum measurement range +/- 20g) sampling frequency 1024 Hz)\n1.3 Wheel hub accelerometers \u2013 4pcs (registration in the range of 0.3-500Hz, minimum measurement range +/- 50g) sampling frequency 1024 Hz)\n1.4 Camera - recording the course of the tests from the vehicle's cabin\n1.5 GPS sensor - recording the vehicle's position and its speed\n1.6 Extensometers at the suspension's elastic elements recording displacements (4 pcs)\n\nSensor installation is planned from 15 April to 15 May 2024, at the Solaris factory: Obornicka 46, Bolechowo-Osiedle. A detailed date will be agreed with the selected contractor.\n\n2.\tDescription of measurements\n2.1 Measurements will take place on a route specified by the client \u2013 TATRA TRACK (Are\u00e1l Tatry 1450/1, 74221 Kop\u0159ivnice, Czech Republic), in three states of load (vehicle empty, vehicle with occupied seats, vehicle full)\nAfter each of the rides, there will be a drive through a speed bump, emergency braking, slalom driving, braking on left and right turns, and driving over obstacles of a specified height with each wheel, e.g., 160mm.\u2002\n2.2 The bus will be transported to the test track where signal measurements must be registered on various tracks. Each track must be registered at least 3 times for each load.\n\nBus available for measurements on the test track (TATRA) from 15 may 2024 (+/- 3 weeks). A detailed date will be agreed with the selected contractor.\n\n3.\tResults\n3.1 Based on urban drives, a damage coefficient must be determined after consulting with the client on fatigue classes. The assumption is to extrapolate results simulating 1 million kilometers and the ratio of full and empty vehicle drives as 50/50%.\n3.2 Test track. After registering signals from the test tracks and selecting representative results, a test schedule for the test track must be arranged and compared to the currently used schedule.\nThis phase's deadline is 2 weeks from the measurements on the track.\n3.3 Presentation of results\n\nThe report must include:\nA general description of the measurements including the route, description of the load, measuring equipment used.\n-comparative tables including:\u2002\u2002\u2002\u2002\n-Table 1. Summary of urban drives strain gauge measurements\n-Table 2. Maximum registered values of sprung mass acceleration after filtering to 20Hz\n-Table 3. Maximum stress ranges during manoeuvers considering mean stress values\n-Table 4. Maximum registered values from accelerometers of sprung mass manoeuvers, after filtering to 20Hz\n-Table 5. Maximum stress ranges during all tests (urban driving, manoeuvers, and test track)\n-Table 6. Comparison of damage parameter for urban driving (50% empty, 50% full) and test track tests according to standard procedure and proposed\n-Table 7. Measurements of air springs pressure in the bus before each of the tests and measurement of axle pressure (measurement equipment provided by Solaris (SBC), test performed with SBC employees)\nAdditionally, as attachments:\n-Table with time series of sensors \n-Stress histograms vs. number of cycles after rainflow analysis for each strain gauge with a resolution of 1 MPa.\n-Acceleration histograms vs. number of cycles after rainflow analysis for each mass-sprung accelerometer every 0.1m/s\u00b2\n-PSD profiles for all strain gauges and accelerometer sensors both during urban drives and track rides\n-csv files with values of all signals registered during tests before and after processing\n\nd.\tPlace of performance the contract: \n\uf02d\tFor the installation of sensors: Solaris Bus & Coach Sp. z o. o., ul. Obornicka 46, Bolechowo-Osiedle \n\uf02d\tFor measurements: TATRA TRACK (Are\u00e1l Tatry 1450/1, 74221 Kop\u0159ivnice, Czech Republic)\n\ne.\tCPV codes for the contract:\n73300000-5 \u2013 design and implementation of research and development\n71621000-7 \u2013 Technical analysis or consultation services\n\nf.\tTerm of the contract: no later than 6 weeks after measurements.\ng.\tTender validity period \u2212 at least 30 calendar from the day following the deadline of submission of tenders. At the request of the Ordering Party, the tenderers may be once required to extend the tender validity period by additional 60 days under pain of rejecting the tender.\nh.\tThe Ordering Party does not permit the submission of partial tenders.\ni.\tThe Ordering Party does not permit the submission of variant tenders.\nj.\tThe Ordering Party does not permit the possibility of subcontracting works to entities other than the Tender.\n\nEquilibrity\n\nWherever the object of the command is described with the trademarks, patents or origin, source or a specific process it is permitted to apply solutions equal to the described ones under condition that they would have the same or better technical and functional specifications and would not downgrade standards indicated in documentation.\n\nWherever the object of the command is described by reference to the standards, technical evaluations, specifications or technical reference systems it is permitted to apply solutions equal to the described ones. \n\n","warranty_period":"Nie dotyczy","cpv_items":[{"id":8237,"code":"71621000-7","name":"Us\u0142ugi w zakresie analizy lub konsultacji technicznej"},{"id":8521,"code":"73300000-5","name":"Projekt i realizacja bada\u0144 oraz rozw\u00f3j"}],"timetable_items":[],"fulfillment_places":[{"country":"Polska","voivodeship":"wielkopolskie","poviat":"pozna\u0144ski","commune":"Czerwonak","locality":"Bolechowo-Osiedle","created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:42","modified_by":null,"id":503899,"type":{"id":1,"name":"adres"},"group_uuid":"d68d5969-5a78-4df0-83fa-c84423edf484"},{"country":"Republika Czeska","voivodeship":null,"poviat":null,"commune":null,"locality":"Kop\u0159ivnice","created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:42","modified_by":null,"id":503900,"type":{"id":3,"name":"zagranica"},"group_uuid":"c48f9c3c-d22b-458a-ad49-b710267b91fd"}],"participation_conditions":[{"id":1231191,"description":"The contractor has knowledge and experience, i.e., in the last 3 years before the deadline for submitting offers, or if the period of activity is shorter \u2013 in this period, completed at least 2 orders in the field of strain gauge and accelerometric measurements in the public transport vehicle industry, including at least 1 for a bus.\n\nThe fulfilment of the conditions will be assessed by the declaration submitted by the Contractor Party, constituting annex 3 to the Request for Proposal.","type":{"id":2,"name":"Wiedza i do\u015bwiadczenie"},"created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:32","modified_by":null,"group_uuid":"eda7161a-921e-4b3c-a866-5d0810b4a180"},{"id":1231192,"description":"Contractors/Suppliers who are personally or financially affiliated with the Ordering Party shall be subject to exclusion from the contract award procedure.\n\nCapital or personal relations shall mean mutual relations between the Ordering Party or persons authorized to enter into commitments on behalf of the Ordering Party or persons performing on behalf of the Ordering Party activities related to the preparation and implementation of procedures for selection of the contractor, or persons who may influence the result of the proceedings and the Contractor, in particular by: \n- participation in a partnership, as a partner in a civil law partnership or partnership; holding at least 10% of the shares, unless a lower threshold is required by law; or wasn\u2019t specified by the project managing authority; being a member of the supervisory or management body, acting as proxy;\n- being married or in a relationship of direct kinship in a straight line, consanguinity or affinity in the collateral line to the second degree, or being related by adoption, guardianship or custody, either cohabitation with the Contractor, its legal representative or members of the management or supervisory bodies of the Contractors applying for the award of the contract;\n- remaining in such a legal or factual relationship with the Contractor that there is reasonable doubt about impartiality or independence in connection with the procurement procedure.\n\nCompliance with the criterion will be assessed on the basis of a declaration on lack of no capital or personal bonds - Annex 2 to the Request for Proposal.","type":{"id":7,"name":"Dodatkowe warunki udzia\u0142u"},"created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:32","modified_by":null,"group_uuid":"405fdf30-3ff0-409e-9b5e-1d1ad6f3cf55"},{"id":1231193,"description":"The list of required documents/statements:\nAnnex no 1_Offer form\nAnnex no 2_Declaration on lack of capital or personal bonds\nAnnex no 3_Declaration of compliance with the conditions\nAnnex no 4_Information clause on personal data processing","type":{"id":6,"name":"Lista wymaganych dokument\u00f3w/o\u015bwiadcze\u0144"},"created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:32","modified_by":null,"group_uuid":"a17a911f-a84c-45b2-8e8c-3ca58e8fe400"}],"category":{"id":1,"name":"Us\u0142uga"},"subcategory":{"id":4,"name":"Us\u0142ugi badawcze"},"created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:42","modified_by":null,"group_uuid":"7618a9da-319c-4cbe-8a4d-f8cd1d2d3347"}],"evaluation_criteria":[{"id":685245,"price_criterion":true,"description":"Price - criterion weight 60%, maximum number of points 60.\n\nP= (C min/C calculated)* P max\nP \u2013 number of points scored by the tendered\nC min \u2013 the lowest offered price\nC calculated \u2013 the price offered by the tenderer\nP max \u2013 maximum number of points available","created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:32","modified_by":null,"group_uuid":"ac63ff98-0c65-4f78-9deb-9b34a4dd4bba"},{"id":685246,"price_criterion":false,"description":"Other criteria - max. of points 40:\n\nCompletion of all work within:\n4 weeks after measurements \u2013 40 points\n5 weeks after measurements - 30 points\n6 weeks after measurements - 20 points\n\nThe unchanging criterion is the proposed test schedule up to 2 weeks after measurements on the test track.","created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:32","modified_by":null,"group_uuid":"138a32cc-1ecf-4953-8673-ad17b9a9999d"}],"is_variant":false,"title":"Operational measurements of the nE12MD bus bodyframe ","order_node":{"id":301885},"created_by":null,"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:42","modified_by":null}],"created_by":{"id":7175,"contact_persons":[]},"modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":2,"label":"PUBLISHED","name":"Opublikowane"},"advertiser_address_details":{"name":" Solaris Bus & Coach sp. z o.o. ","identification_number_type":"nip","identification_number":"5240015630","address":{"country":"Polska","voivodeship":"wielkopolskie","poviat":"pozna\u0144ski","commune":"Czerwonak","locality":"Bolechowo-Osiedle","created_by":{"id":7175,"contact_persons":[]},"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:32","modified_by":{"id":7175,"contact_persons":[]},"id":655769,"street":"ul. Obornicka","number_description":"46","postcode":"62-005"},"created_by":{"id":7175,"contact_persons":[]},"created_at":"2024-03-20 16:11:32","modified_at":"2024-03-20 16:11:32","modified_by":{"id":7175,"contact_persons":[]},"id":246152},"advertisement":{"id":186574,"number":"2024-7175-186574","publication_date":"2024-03-18","created_by":{"id":7175,"contact_persons":[]},"created_at":"2024-03-18 13:08:06","modified_at":"2024-03-28 00:00:03","modified_by":{"modified_by":null,"id":1,"contact_persons":[]},"status":{"id":6,"label":"RESOLVED","name":"Rozstrzygni\u0119te"},"all_available_version_ids":[245328,245603],"enrollment":{"id":40237,"name":"Opracowanie i weryfikacja zeroemisyjnego 12-metrowego autobusu elektrycznego z nap\u0119dem rozproszonym i bateriami na dachu","number":"002/23","activity":{"created_by":null,"created_at":"2023-02-01 09:22:25","modified_at":"2023-02-01 09:22:25","modified_by":null},"region":null,"institution":{"created_by":null,"created_at":"2023-02-01 09:27:55","modified_at":"2023-02-01 09:27:55","modified_by":null},"full_number":"FENG.01.01-IP.01-002/23","perspective":{},"programme":{"created_by":null,"created_at":"2023-02-01 09:21:41","modified_at":"2023-02-01 09:21:41","modified_by":null},"priority":{"created_by":null,"created_at":"2023-02-01 09:21:51","modified_at":"2023-02-01 09:21:51","modified_by":null},"type":"enrollment","created_by":null,"created_at":"2023-07-28 11:46:11","modified_at":"2023-07-28 11:46:11","modified_by":null},"projects":[],"is_author":false,"is_admin":false},"attachments":[{"origin":{"id":245328,"publication_date":"2024-03-18"},"id":1267361,"name":"Request for quotation","file":{"id":1412970,"name":"Request for quotation_operational measurements.pdf","created_at":"2024-03-20 16:11:32","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1412970"},"group_uuid":"cae35971-6260-4fb3-b8b2-be837f4b9534"},{"origin":{"id":245328,"publication_date":"2024-03-18"},"id":1267362,"name":"Annex no 1_Offer form","file":{"id":1412972,"name":"Annex no 1_Offer form example_operational measuremenst.doc","created_at":"2024-03-20 16:11:32","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1412972"},"group_uuid":"2e99c7f1-4505-4a52-9993-0f4c01743d86"},{"origin":{"id":245328,"publication_date":"2024-03-18"},"id":1267363,"name":"Annex no 2_declaration on lack of capital or personal bonds","file":{"id":1412973,"name":"Annex no 2_Declaration on lack of capital or personal bonds.doc","created_at":"2024-03-20 16:11:32","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1412973"},"group_uuid":"e2a68533-482e-4f33-baef-9cd31e289af5"},{"origin":{"id":245328,"publication_date":"2024-03-18"},"id":1267364,"name":"Annex no 3_Declaration of compliance with the conditions","file":{"id":1412974,"name":"Annex no 3_Declaration of compliance with the conditions.doc","created_at":"2024-03-20 16:11:32","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1412974"},"group_uuid":"17a67aee-f24d-4d5e-b7de-fdca68fd5287"},{"origin":{"id":245328,"publication_date":"2024-03-18"},"id":1267365,"name":"Annex no 4_Information clause on personal data processing","file":{"id":1412976,"name":"Annex no 4_Information clause on personal data processing.docx","created_at":"2024-03-20 16:11:32","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1412976"},"group_uuid":"45ee8c99-ae0f-499e-8a9a-de04e27d3dad"},{"origin":{"id":245328,"publication_date":"2024-03-18"},"id":1267366,"name":"Annex no 5_Agreement example","file":{"id":1412979,"name":"Annex no 5_Agreement_Operational measurements.docx","created_at":"2024-03-20 16:11:32","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1412979"},"group_uuid":"53959833-04d9-4cb8-8be9-fc1e6319c282"},{"origin":{"id":245603,"publication_date":"2024-03-20"},"id":1269898,"name":"Request for quotation_changes 20.03.2024","file":{"id":1415841,"name":"Request for quotation_changes 20.03.pdf","created_at":"2024-03-20 16:11:11","created_by":{"forename":"Justyna","surname":"Sikorska"},"uri":"/api/files/1415841"},"group_uuid":"96244fa0-649f-4c47-aa6c-46d57da3d937"}]},"dictionaries":{"announcement_status_draft":1,"announcement_status_published":2},"favorite":null,"badge":null,"offer_set_badge_count":null,"question_badge_count":null}}